00 WIB
TYPE PONDASI PS - 1
Bagian Sudah Belum Total Keterangan Prosentase (%) Target
Straus 55 1 55 98.2 15-Nov
Pilecap 55 1 55 98.2 15-Nov
Pedestal 35 21 35 62.5 15-Nov
Grouting 0 56 0 - 15-Nov
Baseplate + Anchor 44 12 44 78.6 15-Nov
Support 18 38 18 Baru tack weld 32.1 23-Nov
Painting 3 53 3 Finish painting 5.4 30-Nov
100.0