You are on page 1of 34
<< ‘SAMSUNG ENGINEERING Suites W-08-02.02 (Level 8, West Wing) The ICON, No.1, Jalan Tun Razak, MALAYSIA 50400 Kuala Lumpur, Malaysia DOCUMENT TRANSMITTAL ] PROJECT : RAPIO PAGKAGE NO. 6A LLDPE PROJECT ‘TRANSMITTAL DATE: 24Noverber 2017 10 [ALAM DINGIN AIR CONDITIONING ENGINEERING SDN BHD TRANSMITTAL NO. RAPID-POOEA'SCS-ADE-TRN.0000 239, Jalan Pandan Prima 4, REFERENCE NO. : Dataran Pandan Prima, 55100 Kuala Lumpur, Maly ‘SUBCONTRACT NO. ‘sc2ne1-sac-os FROM; SAMSUNG ENGINEERING (MALAYSIA) SDN. BHD. SUBCONTRACT TITLE — : HVAC WORK ‘Suites W-08-02.02 (Level 8, West Wing) The ICON, Noct, Jalan Tun Razak, 80400 Kuala Lumpur, Malaysia SUBJECT ; APPROVED - MATERIAL APPROVAL REQUEST FOR REFRIGERANT COPPER PIPE The following Cloriginats ——C] Reproducbie ints Dorsx se transmitted CPtan 11 Review Dapproval Cias-buin herewith for: [construction C]. information Drinatissue Cicomptiance sre transmitod Clapproves Approved with Net Approved Reviowee herewith 28 Reviewed with Comments Comments etvered by a and carry Dow Pouch lease reply by Tm Wand Carry Doar TiPouch ‘DOCUMENT LST sFa PRAWING DOCUMENT NO. rev. no. | NO.OF DESCRIPTION 5 copies Pen.war-tv-aD-o006 2 + [Approved : material Approval Request or Retigarant Copper Pipe REMARKS : PLEASE ACKNOWLEGE RECEIPT 'ssuED v xv RECEIVED BY [ALAM DINGIN AIR CONDITIONING ENGINEERING SDN BHD Mr. Jong Mun Oh J Conetruetion Manager NAME [SAMSUNG ENGINEERING (I) SDN. BHD. baTE DonaGeo! Kim/aHSl 211 WH O1AIOF|AAPID 46a Project/@lB@4/20171 124100244 a MATERIAL APPROVAL REQUEST ‘SANISUNG ENGINEERING TAMID PACKAGE GA DPE PROVECT INFORMATION PROJECT [[RAFIO PACKAGE GALLDPE PROJECT [REPORTNO. | POAMARIV-AD-0006 REVO CONTRACTOR __ SAMSUNG ENGINEERING DATE 9° NOVEMBER 2017, SUBIECT [MATERIAL APPROVAL REQUEST FOR REFRIGERANT COPPER PIPE INSPECTION RECORD. 11.0 TYPE OF MATERIAL REFRIGERANT COPPER PIPE (REFER NOTE) FA TEKNIK SDN. BHD. 1.1 TRADE NAME (SUPPLIER) 1.2 MANUFACTURER HAIUANG & NIBCO PTS 31.76.10.10, HEATING, VENTILATION AND AIR CONDITIO BUILDING 66750-FAR-320 FIELD AUXILIARY ROOM HVAC PIPING ENLARGED PLAN 00¢. NO: RAPID-POOEA-SCS Lor eae, 538 ING FOR PLANT 13 SPECIFICATION OR DRAWING NO. 1.4 LOCATION 15 TECHNICAL DETAIL REFER TO THE ATTACHMEN ATTACHMENT SAMPLE [ BROCHURE SIZE COMPOSITION = 7 AS PER IFC | ao Sves INO VES LINO nie : Material Test Certificate (MTC) Required? COVES ENO If required, MTC must be provided NOTES 7 COMMENTS: PIPE FOR REFRIGERANT PIPING (HAILIANG) = TVPEK (ASTM 883) = TYPE (ASTM 8280) [REFRIGERANT COPPER FITTING (NIBCO) IPE ANTI CORROSION COATING (HERESITE) ‘SUBCONTRACTOR — MOHD FAIRUZ J STAFA CAJOC ENGINEER [ALAM DINGIN AIR CONDITIONING ENGINEERING. | PROJECT MANAGER t ARR | —_YUSOF BIN SULAIMAN PROJECT MANAGER syuport name / srs / ose ule | Name 7 Spnature / Date taco Yoo DiApproved with comment cep DEPARTMEN} = MANAGER ‘iu Do roe A 1 Not. 201%, | L Mame / Signature / Date _ QA/QC MANAGER VW cee Te aleun, ZX 7 Name / Signature / Date COMMENTS TF ANY: OWNER P6A-CON-FORM-0003 Rev. 0 6 MATERIAL APPROVAL REQUEST PETRONAS SAMSUNG ENGINEERING RAPID PACKAGE GA LLDPE PROJECT proved Japproved with comment Got approved ATTACHMENT PGA-CON-FORM-0003 Fev. 0

You might also like