‘SAMSUNG ENGINEERING Suites W-08-02.02 (Level 8, West Wing) The ICON, No.1, Jalan Tun Razak,
MALAYSIA 50400 Kuala Lumpur, Malaysia
DOCUMENT TRANSMITTAL ]
PROJECT : RAPIO PAGKAGE NO. 6A LLDPE PROJECT ‘TRANSMITTAL DATE: 24Noverber 2017
10 [ALAM DINGIN AIR CONDITIONING ENGINEERING SDN BHD TRANSMITTAL NO. RAPID-POOEA'SCS-ADE-TRN.0000
239, Jalan Pandan Prima 4, REFERENCE NO. :
Dataran Pandan Prima, 55100 Kuala Lumpur, Maly ‘SUBCONTRACT NO. ‘sc2ne1-sac-os
FROM; SAMSUNG ENGINEERING (MALAYSIA) SDN. BHD. SUBCONTRACT TITLE — : HVAC WORK
‘Suites W-08-02.02 (Level 8, West Wing) The ICON,
Noct, Jalan Tun Razak, 80400 Kuala Lumpur, Malaysia
SUBJECT ; APPROVED - MATERIAL APPROVAL REQUEST FOR REFRIGERANT COPPER PIPE
The following Cloriginats ——C] Reproducbie ints Dorsx
se transmitted CPtan 11 Review Dapproval Cias-buin
herewith for: [construction C]. information Drinatissue Cicomptiance
sre transmitod Clapproves Approved with Net Approved Reviowee
herewith 28 Reviewed with Comments
Comments
etvered by a and carry Dow Pouch
lease reply by Tm Wand Carry Doar TiPouch
‘DOCUMENT LST
sFa PRAWING DOCUMENT NO. rev. no. | NO.OF DESCRIPTION
5 copies
Pen.war-tv-aD-o006
2
+ [Approved : material Approval Request or Retigarant Copper Pipe
REMARKS :
PLEASE ACKNOWLEGE RECEIPT
'ssuED
v
xv
RECEIVED BY
[ALAM DINGIN AIR CONDITIONING ENGINEERING SDN BHD
Mr. Jong Mun Oh J Conetruetion Manager NAME
[SAMSUNG ENGINEERING (I) SDN. BHD. baTE
DonaGeo! Kim/aHSl 211 WH O1AIOF|AAPID 46a Project/@lB@4/20171 124100244a
MATERIAL APPROVAL REQUEST
‘SANISUNG ENGINEERING
TAMID PACKAGE GA DPE PROVECT
INFORMATION
PROJECT [[RAFIO PACKAGE GALLDPE PROJECT [REPORTNO. | POAMARIV-AD-0006 REVO
CONTRACTOR __ SAMSUNG ENGINEERING DATE 9° NOVEMBER 2017,
SUBIECT [MATERIAL APPROVAL REQUEST FOR REFRIGERANT COPPER PIPE
INSPECTION RECORD.
11.0 TYPE OF MATERIAL REFRIGERANT COPPER PIPE (REFER NOTE)
FA TEKNIK SDN. BHD.
1.1 TRADE NAME (SUPPLIER)
1.2 MANUFACTURER HAIUANG & NIBCO
PTS 31.76.10.10, HEATING, VENTILATION AND AIR CONDITIO
BUILDING
66750-FAR-320 FIELD AUXILIARY ROOM HVAC PIPING ENLARGED PLAN
00¢. NO: RAPID-POOEA-SCS
Lor eae, 538
ING FOR PLANT
13 SPECIFICATION OR DRAWING NO.
1.4 LOCATION
15 TECHNICAL DETAIL REFER TO THE ATTACHMEN
ATTACHMENT
SAMPLE [ BROCHURE SIZE COMPOSITION
= 7 AS PER IFC | ao
Sves INO VES LINO nie :
Material Test Certificate (MTC) Required? COVES ENO If required, MTC must be provided
NOTES 7 COMMENTS:
PIPE FOR REFRIGERANT PIPING (HAILIANG)
= TVPEK (ASTM 883)
= TYPE (ASTM 8280)
[REFRIGERANT COPPER FITTING (NIBCO)
IPE ANTI CORROSION COATING (HERESITE)
‘SUBCONTRACTOR
—
MOHD FAIRUZ
J
STAFA
CAJOC ENGINEER
[ALAM DINGIN AIR CONDITIONING
ENGINEERING.
| PROJECT MANAGER t ARR
| —_YUSOF BIN SULAIMAN
PROJECT MANAGER
syuport
name / srs / ose ule | Name 7 Spnature / Date
taco
Yoo
DiApproved with comment
cep
DEPARTMEN}
= MANAGER
‘iu Do roe A
1 Not. 201%, |
L
Mame / Signature / Date _
QA/QC MANAGER
VW cee
Te aleun,
ZX
7
Name / Signature / Date
COMMENTS TF ANY:
OWNER
P6A-CON-FORM-0003 Rev. 06 MATERIAL APPROVAL REQUEST
PETRONAS SAMSUNG ENGINEERING
RAPID PACKAGE GA LLDPE PROJECT
proved
Japproved with comment
Got approved
ATTACHMENT
PGA-CON-FORM-0003 Fev. 0