Chapter 9
RQ #’s 3,6,12

3. The way excavation is measured unit wise is by cubic yard.

6. The term cut and fill is referred to the excavation of a certain portion or sector of an area which
is later filled with building materials.

12. High water table or underground stream possibilities affect the bid by either delay of the bid or

bid total recall.