Professional Documents
Culture Documents
Week #4 HW
Week #4 HW
Chapter 9
RQ #’s 3,6,12
6. The term cut and fill is referred to the excavation of a certain portion or sector of an area which
is later filled with building materials.
12. High water table or underground stream possibilities affect the bid by either delay of the bid or