Sequence of Report

1. Preliminary Report

2. Construction Project Management Report

3. Geotechnical Report

4. Earthwork Report

5. Structural Design Report

6. Water Supply report

7. Drainage Design Report

8. Road Design Report

9. Authority for Utilities

10. Environmental Report

11. Sustainbility Report

12. Building Information Modelling Report

13. Drawings