0% found this document useful (0 votes)
48 views3 pages

Cut and Fill Volume Calculations

The document contains a table with elevation data points arranged in a grid. It also includes calculations to determine the volume of cut and fill needed to level the land to a proposed elevation of 28m. The total cut volume is 329.4m3 and no fill is needed, as the 263.5m3 of available fill from cuts is sufficient to level the entire 900m2 area.

Uploaded by

Ang Jun Kang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views3 pages

Cut and Fill Volume Calculations

The document contains a table with elevation data points arranged in a grid. It also includes calculations to determine the volume of cut and fill needed to level the land to a proposed elevation of 28m. The total cut volume is 329.4m3 and no fill is needed, as the 263.5m3 of available fill from cuts is sufficient to level the entire 900m2 area.

Uploaded by

Ang Jun Kang
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd

y1 y2 y3 y4 y5 y6

x x x x x

A1 B1 C1 D1 E1 F1

Area 1 = (y1 + y2) x + (y2 + y3) x + (y3 + y4) x + (y4 + y5) x + (y5 + y6) x
2 2 2 2 2

Area 1 = {(y1+y6)/2 + (y2 + y3 + y4 + y5)} x


Proposed Platform Levels
Volume of Cut & Fill Calculations
The map is divided in to 6 horizontal and 6 vertical grids each of 5m interval.
The reduced levels are given at the intersections.

1 5m 2 5m 3 5m 4 5m 5 5m 6 5m 7
A E 28.9 28.9 28.9 28.7 28.7 28.8 28.8 28.6 28.6 29.3 29.3 29.1
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
C 18.8 16.9 17.5 16.3 20.0 23.8
5m
F 0.0 0.0 0.0 0.0 0.0 0.0
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
E 28.7 28.5 28.5 28.6 28.6 28.7 28.7 28.5 28.5 28.8 28.8 28.6
B E 28.7 28.5 28.5 28.6 28.6 28.7 28.7 28.5 28.5 28.8 28.8 28.6
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
C 13.1 11.3 14.4 15.6 16.3 15.6
5m
F 0.0 0.0 0.0 0.0 0.0 0.0
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
E 28.5 28.4 28.4 28.3 28.3 28.7 28.7 28.6 28.6 28.7 28.7 28.4
C E 28.5 28.4 28.4 28.3 28.3 28.7 28.7 28.6 28.6 28.7 28.7 28.4
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
C 7.5 7.5 10.6 13.8 13.8 10.6
5m
F 0.0 0.0 0.0 0.0 0.0 0.0
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
E 28.1 28.2 28.2 28.3 28.3 28.4 28.4 28.5 28.5 28.4 28.4 28.2
D E 28.1 28.2 28.2 28.3 28.3 28.4 28.4 28.5 28.5 28.4 28.4 28.2
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
C 2.5 5.6 8.1 8.8 6.9 4.4
5m
F 0.0 0.0 0.0 0.0 0.0 0.0
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
E 28.0 28.1 28.1 28.3 28.3 28.3 28.3 28.2 28.2 28.0 28.0 28.1
E E 28.1 28.2 28.2 28.3 28.3 28.4 28.4 28.5 28.5 28.0 28.0 28.1
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
C 1.9 3.7 6.3 7.5 3.7 0.6
5m
F 0.0 0.0 0.0 0.0 0.0 0.0
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
E 28.0 28.0 28.0 28.1 28.1 28.2 28.2 28.1 28.1 28.0 28.0 28.0
F E 28.0 28.0 28.0 28.1 28.1 28.2 28.2 28.1 28.1 28.0 28.0 28.0
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
C 0.0 0.6 2.5 2.5 0.6 0.0
5m
F 0.0 0.0 0.0 0.0 0.0 0.0
P 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0 28.0
E 28.0 28.0 28.0 28.0 28.0 28.1 28.1 28.0 28.0 28.0 28.0 28.0
G

Legend Cut and Fill information

E = Existing Level Total Area = 900 m2


P = Proposed Level Proposed Level = 28 m
C = Cut Total Cut = 329.4 m3
F = Fill Spoil @ 20% = 65.875 m3
Available Fill = 263.5 m3
* All dimensions are in meters Total Fill = 0 m3
To import Fill = Nil m3
Access Cut = 263.5 m3
1 8.286 2 8.286 3 8.286 4 8.286 5 8.286 6 0 7 0 8 0 9 0 10
A E 53 54 54 55 55 55.4 55.4 56 56 57 0 00 00 00 0
P 50 50 50 50 50 50 50 50 50 50 0 00 00 00 0
11.6 C 480.59 576.71 658.4 706 769 0 0 0 0
F 0 0 0 0 0 0 0 0 0
P 50 50 50 50 50 50 50 50 50 50 0 0 0 0 0 0 0 0
E 56 57 57 58 58 59 59 59 59 60 0 0 0 0 0 0 0 0
B E 56 57 57 58 58 59 59 59 59 60 0 0 0 0 0 0 0 0
P 50 50 50 50 50 50 50 50 50 50 0 0 0 0 0 5 0 0
11.6 C 744.91 865.06 961.2 1009 1057 0 0 0 0
F 0 0 0 0 0 0 0 0 0
P 50 50 50 50 50 50 50 50 50 50 0 0 0 0 0 0 0
E 58 60 60 61 61 62 62 62 62 63 0 0 0 00 0 0 0
C E 58 60 60 61 61 62 62 62 62 63 0 0 0 00 0 0 0
P 50 50 50 50 50 50 50 50 50 50 0 0 0 00 0 0 0
11.6 C 985.21 1105 1201 1274 1370 0 0 0 0
F 0 0 0 0 0 0 0 0 0
P 50 50 50 50 50 50 50 50 50 50 0 0 0 0 0 0 0 0
E 61 62 62 63 63 64 64 65 65 67 0 0 0 0 0 0 0 0
D E 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 C 0 0 0 0 0 0 0 0 0
F 0 0 0 0 0 0 0 0 0
P 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0
E 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0
E E 0 0 0 0 0 0 0 0 0 00 0 0 0 0 0 0 0
P 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
0 C 0 0 0 0 0 0 0 0 0 0
F 0 0 0 0 0 0 0 0 0
P 0 00 00 00 00 00 00 00 00 0

F E0 00 00 00 00 00 00 0 00 0

All dimensions are in meters Total Area = 0.48 acres


Total Cut = 13,764.04 CuM
Spoil @ 20% = 2,752.81 CuM
Proposed Platform Levels Available Fill = 11,011.23 CuM
Volume of Cut & Fill Total Fill = 0.00 CuM
To import Fill = Nil CuM
Access Cut = 11,011.23 CuM

Legend

E Existing
P Proposed
C Cut
F Fill