MEASUREMENT II
SEMESTER I
ACADEMIC SESSION 20/21
TITLE: EARTHWORK
LECTURER: Associate Professor Dr NAZIRAH ZAINUL ABIDIN
DUE DATE: 27 NOVEMBER 2020
0
1) DETERMINE CUT AND FILL LINE
D1-E1 𝑋 20
=
0.5 1.9
(74.7 – 76.6)
20 0.5 75.20 20 𝑋 0.5 X is 5.26 from D1
X= 1.9
= 5.26
1.9
D2-E2 𝑋 20
0.2
= 2.0
(75.0 – 77.0)
20 0.2 20 𝑋 0.2 X is 2.00 from D2
75.20
X= = 2.00
2.0
2
C3-D3 𝑋 20
0.9
= 1.3
(74.3 – 75.6)
20 0.9 75.20 20 𝑋 0.9 X is 13.85 from C3
X= 1.3
= 13.85
1.3
C4-D4 𝑋 20
0.7
= 1.2
(74.5 – 75.7)
20 𝑋 0.7 X is 11.67 from C4
20 0.7 75.20 X= 1.2
= 11.67
1.2
C5-D5 𝑋 20
0.6
= 1.3
(74.6 – 75.7)
20 0.6 75.20 20 𝑋 0.6 X is 9.23 m from C5
X= 1.3
= 9.23
1.3
C6-D6 𝑋 20
0.8
= 1.3
(74.4 – 75.6)
20 0.8 75.2 20 𝑋 0.8 X is 12.31 from C6
X= 1.3
= 12.31
1.3
1
i. FILL CALCULATION FOR PERFECT SQUARE USING WEIGHTAGE METHOD
a) Schedule of perfect square for fill area (weightage method)
b) 11 perfect square
2
TOTAL: 44 79.20
20
74.7+ 75.0+75.2+75.2 ½ (2.00 + 5.26) x 20 x 0.175
2.0 =
5.26 4
0
D1-D2- =75.20 – 75.025 = 12.705
1*-21*
= 0.175
75.2+ 75.2+75.0
= = ½ x 20 x 2.00 x 0.067
3
D2-2*-D*
2.0
=75.13 =1.34
3
73.7+ 74.3+75.2+75.2+95.0
= a) 20 x 13.85 x 0.52 = 144.04
5
20 b)1/2 x (20 + 6.67) x 6.15 x
=74.68
0.52 = 42.64533
13.85 13.85 =75.20 – 74.68= 0.52
D2-D*- =144.04 + 42.64533
3*-C*- =186.68533
C2
6.15
6.67
½ x ( 11.67 + 13.85) x 20 x
74.3+ 74.5+75.2+75.2
= 0.4
20 4
=74.80
=102.08
C3-C4- 11.67
13.85 =75.20- 74.80
4*-3*
=0.4
74.5+ 74.6+75.2+75.2
= 1/2 x ( 11.67 + 13.85 ) x 20 x
4
0.4 x 0.325
20 =74.875
=67.925
C4-C5- 11.67 9.23 =75.20 – 74.875
4*-5* =0.325
4
74.6+ 74.4+75.2+75.2
= 1/2 x ( 12.31 + 9.23 ) x 20 x
4
0.325
20 =74.85
= 75.39
9.23 =75.20- 74.85
C5-C6- =0.35
5*-6* 12.31
5
ii. SLOPE @ FILL FOR BOUNDARY LINE
Commencing level =
(75.2 + 74.7 + 73.3 + 72.8 + 72.5 + 73.0 + 72.8 + 72.8 +
72.8 + 72.5 + 73.2 + 74.4 + 75.2)
13
=73.480
=17.23
2=3.44
TOTAL OF FILL
i) Total volume perfect square = 7920 m3
6
i. CUT CALCULATION FOR PERFECT SQUARE USING WEIGHTAGE METHOD
c) Schedule of perfect square for cut area (weightage method)
d) 8 perfect square
7
ii. CUT CALCULATION FOR UN-PERFECT SQUARE
c) Schedule for un-perfect square
d) 6 un perfect square
20
13.33
2 (75.2+75.2+75.6+77.4 ½ x (13.33+20) x 2 x 0.88
2*-D*-D3 +77.0) / 5
-E2-E3 = 29.3304
= 76.08 – 75.2
18 20 x 18 x 0.88
= 0.88
= 316.80
29.3304 + 316.80
20
= 346.1304
13.33
8
3*-4*- (75.2+75.2+75.6+75.7) /4 ½ x (8.33+6.15) x 20 x 0.225
D3- D4 8.33
6.15 =75.425 – 75.20 = 32.58
= 0.225
20
20
20
9
iii. SLOPE @ CUT FOR BOUNDARY LINE
TOTAL OF CUT
10
2) TOTAL OF CUT TO DISPOSE
11
3) TRANSFER AMOUNT TO TAKING OFF PAPER
F 121
9003.87 Excavation, cut to gill , earth max depth exceeding
1.00 3.00m from commencing surface
1.00 ( F5: 80.4 – 75.2 = 5.2)
9003.87
F 131
1850.58
Excavation, cut to dispose, earth max depth exceeding
1.00
3.00 from commencing surface
1.00
1850.58
8366.13 F 311
1.00 Filing, general, excavated material
1.00
8366.13
F 321
637.74 Filing, embankment, excavated material
1.00
1.00
637.74
12
13