YRT4

BUILD CALENDAR
Father Comes Home from the Wars, Parts 1, 2, and 3 2017‐2018
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Build 0.5
Jan 21 Jan 22 Jan 23 Jan 24 Jan 25 Jan 26 Jan 27
Official Start Day
Sparks Ocho Rios Foundation (Steel) Ocho Rios Foundation (Steel)
Gaff Wall Surround (Steel) Wall Surround (Steel) Wall Surround (Steel)
Sharon Rehearsal Rake Rehearsal Rake/Ocho Rios
Libby Wall Surround (Steel) I‐Beam Sample
Paints Hopefully Cork (2 Day dry time)
Paints
Build Week 1.5
Jan 28 Jan 29 Jan 30 Jan 31 Feb 1 Feb 2 Feb 3
Sharon Out Early ‐ TBD Production Meeting 2:30
Sparks Sheave Plates/Masking Frames Raked Deck ‐ Plat (Steel) Raked Deck/Shreks and Donkeys Shreks and Donkeys
Gaff Wall Surround (Steel) Wall Surround (Steel) Wall Surround (Steel) RP Wall (Steel) RP Wall (Steel)
Sharon Rehearsal Rake/Ocho Rios Rehearsal Rake/Ocho Rios "Ocho Rios" "Ocho Rios" "Ocho Rios"
Libby I‐Beam Sample I‐Beam Sample/Ocho Rios "Ocho Rios" "Ocho Rios" "Ocho Rios"
Ryan Afternoon only Wall Surround (Pipes/MDF) Wall Surround (Pipes/MDF) Wall Surround (Pipes/MDF) Raked Deck ‐ Plat (Steel) Raked Deck ‐ Plat (Steel)
Erin YRT3 YRT3 YRT3 YRT3 YRT3
Jess YSD3 YSD3 YSD3 YSD3 YSD3
Jen
Harry Wall Surround MDF (TBD)
Becca
Sayantee Wall Surround MDF (TBD)
Paints Rehearsal Rake I‐Beam Sample
Paints Deck Plywood
Build Week 2.5
Feb 4 Feb 5 Feb 6 Feb 7 Feb 8 Feb 9 Feb 10
Long Term Staff Event 2‐3:30 Production Meeting 3:30 EDIWG ‐ 2:15‐4:15 10AM ‐ 2PM
Jess out 5:30 Ryan 9‐5/ Jen out 5:15 Jen out 5:15 / Jess out 5:30 Jess out 5:30 Harry out 4:30 / Jess out 5:30 6PM ‐ 10:30P
Sparks Shreks and Donkeys Shreks and Donkeys Shreks and Donkeys Shreks and Donkeys
Gaff RP Wall (Steel) RP Wall (Steel) Deck ‐ Studwalls (Steel) Deck ‐ Studwalls (Steel) Deck ‐ Studwalls (Steel)
Sharon "Ocho Rios" "Ocho Rios" "Ocho Rios" "Ocho Rios" "Ocho Rios"
Libby "Ocho Rios" "Ocho Rios"/Raked Deck TBD Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood) Deck ‐ Studwalls (Steel)
Ryan Raked Deck ‐ Plat (Steel) Raked Deck ‐ Plat (Steel) Raked Deck ‐ Plat (Steel) Raked Deck ‐ Plat (Steel) Raked Deck ‐ Plat (Steel)
WS ‐ Trucking in
Erin Wall Surround MDF Angle Tabs Angle Tabs Surround/RP MDF (TBD Steel) TBD Steel/Wood for Full Day
AM and building in
Jess TBD and Trucking Surround/RP MDF TBD Based on Week
PM
Jen Raked Deck ‐ Plat (Steel) Raked Deck ‐ Plat (Steel) Raked Deck ‐ Plat (Steel) Raked Deck ‐ Plat (Steel)
Harry Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood)
Becca Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood) YSD3
Sayantee Wall Surround MDF TBD and Trucking Surround/RP MDF TBD Based on Week
WS Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood) Raked Deck ‐ Plat (Wood)
Paints Ocho Rios Flats Deck Parts (for Storage) Deck Parts (for Storage)
Paints Hopefully Cork

Prepared By: LT TD: LT


Last Updated: 2/12/2018 Contact: 732‐673‐3301
Version 6.0  SUBJECT TO CHANGE ATDs: Kevin, Dashiell, Jon
Father Comes Home from the Wars, Parts 1, 2, and 3 2017‐2018
Sunday Monday Tuesday Wednesday Thursday Friday Saturday
Build Week 3.5
Feb 11 Feb 12 Feb 13 Feb 14 Feb 15 Feb 16 Feb 17
Ryan Starts at 9AM Prodcution Meeting 2:30 Blank Panther 7PM
Carps start at 9AM Jen out 5:15 Jen out 5:15 Sayantee Eval 3:30‐4 Deck Practice
TBD LATE NIGHT
Sparks Ocho Rios Foundation Mod. Ocho Rios Foundation Mod. Sheave Assemblies Sheave Assemblies
Gaff Deck ‐ Studwalls (Steel) Deck ‐ Studwalls (Steel) Deck ‐ Studwalls (Steel) US Ramp Platforms (Wood) US Ramp Platforms (Steel)
Sharon Raked Deck ‐ Plat (Wood) Make Dirt mixture Make Dirt mixture Deck (Paints) Dirt
Libby Raked Deck ‐ Plat (Wood) I‐Beams (TBD) I‐Beams I‐Beams Dirt
TBD ‐ Seam Cut
Ryan Deck ‐ Studwalls (Steel) Deck ‐ Studwalls (Steel) Deck ‐ Studwalls (Steel) US Ramp Studwalls US Ramp Studwalls
Day/Assembly
Erin Studwall ‐ Angle Tabs Make Dirt mixture Make Dirt mixture
(PM)
Jen Deck ‐ Studwalls (Steel) Deck ‐ Studwalls (Steel) Deck ‐ Studwalls (Steel)
Harry Truck Deck to Paints Make Dirt mixture Start Deck Install Finish Deck Install Dirt Day
Becca YSD3 Truck Deck to Paints Wall Surround MDF (TBD) Start Deck Install
Sayantee YSD3 Truck Deck to Paints Wall Surround MDF (TBD) Start Deck Install
Paints Ocho Rios Foundations US Ramp
Paints Deck Pieces (for Storage)
Build Week 4.5
Feb 18 Feb 19 Feb 20 Feb 21 Feb 22 Feb 23 Feb 24
YRT3 ‐ Strike TBD LATE NIGHT Jen out 5:15 Jen out 5:15
Sparks Rake Guard Rails Rake Guard Rails Rake Guard Rails Disassemble Dirt Deck
Gaff Battens Battens A.C.T. RP Frames A.C.T. RP Frames A.C.T RP Frames
Sharon Dirt Deck I‐Beams I‐Beams Disassemble Dirt Deck
Libby I‐Beams/Dirt Deck Notes TBD I‐Beams I‐Beams Disassemble Dirt Deck
TBD ‐ Seam Cut
Ryan US Ramp Studwalls Escape Stairs Escape Stairs Disassemble Dirt Deck
Day/Assembly
Erin YRT3 YRT3 Hardware Truck Dirt Deck
(AM)
Jen Dirt Deck Stingers Stingers Truck Dirt Deck
Harry YRT3 YRT3 Make sure/make Ropes Dock Studwalls? Truck Dirt Deck
Becca Dirt Deck Ramp Carpet Offstage Serge Frame
Sayantee Dirt Deck Hardware Hardware Truck Dirt Deck
Paints Dirt Deck I‐Beams Escape Stairs
Load In
Feb 25 Feb 26 Feb 27 Feb 28 March 1 March 2 March 3
Night Call if we LX in the House? Jen out 5:15 and
Jen out 5:15 SHARON OUT LX Overhead?
Want We get Sparks SHARON OUT
Layout Points UT Lineset Strike Masking Shuffle
Plastic UT Grid Shuffle with Ponies 3rd LX
Seat Covers Assembling Surround frames RP Wall Rios
UT Stairs Trucking Ocho US Wall
Masking Shuffle start? Angled LX SR/SL Wall
Load In Tech
March 4 March 5 March 6 March 7 March 8 March 9 March 10
(8am‐6pm) EDIWG ‐ 2:15‐4:15
DECK DAY Sparks M&R SOUND FOCUS (?) LX FOCUS (Hopeful 12PM) TECH STARTS
Final Deck Set Up I‐Beams
Deck Set Up/Strike
Additional Masking Lighting and Sound priority
Practice Finish what we didn't day
I‐Beams

Prepared By: LT TD: LT


Last Updated: 2/12/2018 Contact: 732‐673‐3301
Version 6.0  SUBJECT TO CHANGE ATDs: Kevin, Dashiell, Jon