The reliability of preliminary cost estimates can be
increased by considering as much historical data as
possible. For example, the cost of finishing a concrete slab when the contractor has not yet been selected should be estimated from actual recent costs from as many local jobs as is practical. Most jobs are not directly comparable, however, because they differ in size or in some other characteristic