The reliability of preliminary cost estimates can be

increased by considering as much historical data as


possible. For example, the cost of finishing a concrete
slab when the contractor has not yet been selected
should be estimated from actual recent costs from as
many local jobs as is practical. Most jobs are not
directly comparable, however, because they differ in size
or in some other characteristic