You are on page 1of 2

Hasil Pengujian Nilai Slump

No Identifikasi Benda Uji Nilai Slump rata- Rencana (cm)


rata (
1 SW LT 5/ TWR 3 14 12±2
2 SW TANGGA LT 3 / TWR 1 14 12±2
3 BOREPILE BELAKANG GALERY 14 12±2
4 SW+COLUMN 14 12±2
5 DINDING RAMP / TWR 1 14 12±2
6 DINDING GWT 12 12±2
7 BOREPILE AREA GALERY 14 12±2
8 COLUMN LT 4 / TWR 1 14 12±2
9 COLUMN LT 6 / TWR 7 14 12±2
10 COLUMN+SW TL 6 / TW 7 14 12±2
No Identifikasi Benda Uji Umur Beton Kuat Tekan Kuat
Rata-rata Tekan
(Hari)
Rencana
(Hasil
Pengujian)
1 KOLOM / TW.1 29 59.40 MPa 55 MPa
2 RETAINING WALL / TW.7 28 55.72 MPa 55 MPa
3 RETAINING WALL / TW.1 28 55.72 MPa 55 MPa
4 KOLOM TW.1 + TW.3 28 57.70 MPa 55 MPa
5 KOLOM TW.1 + TW.3 28 57.42 MPa 55 MPa
6 KOLOM TW.3 28 56.00 MPa 55 MPa
7 RETAINING WALL / TW.5 30 57.14 MPa 55 MPa
8 RETAINING WALL / TW.5 30 56.29 MPa 55 MPa
9 RETAINING WALL / TW.5 30 57.98 MPa 55 Mpa
10 RETAINING WALL / TW.1 STP 30 58.83 MPa 55 Mpa
11 RETAINING WALL / TW.1 STP 30 57.70 MPa 55 MPa
12 RETAINING WALL / TW.1 30 57.98 MPa 55 MPa
13 RETAINING WALL / TW.3 29 55.72 MPa 55 MPa
14 COLOUMB LT.1 / TW.3 29 56.00 MPa 55 MPa
15 COULOMB PODIUM / TW.3 29 57.42 MPa 55 MPa