TIPS ON HOW TO INSTALL THE BUILDING MATERIALS

To get maximum results there are several ways that required the installation
of building materials, so that the obtained results are good finishing and elegant
looks. The following tips and tricks how to install the material.

A. WOOD FLOOR
Installation Method:
1. After urug compacted soil until it is completely solid concrete rebate
comparison with: 1pc: 3PS: 5kr , 8cm thick .
2. Wood glue is the second layer approximately 0.5 cm thick.
3. Boards placed over the glue, and the rest of the expansion is approximately
1/2-5/8 inch from the wall.
4. Then hammered by 2 to 3 spikes.
5. Fininshing memlitur on wooden floors with wooden floors have been
installed.

B. GLASS BLOCK
Installation Method:
Installation of glass block that has been plastered on the walls is by using
white cement + species of white glue. The installation such as bricklaying
by adding grout earlier species.

C. CERAMIC
Installation Method:
Installation of ceramic wall starting from the ground up. The use of rope is
needed to straighten out the installation. And also the use of a water right.
Species are used for ceramics is 1pc: 3PS. While the grout is used to close
the distance between the ceramic is adapted to color ceramics. If white
ceramic 1pc (white cement): 3kp: 5ps . As for the other mixtures used for
ceramic colored dye.
D. WALL PAPER
How to install:
Prior to the installation of wall paper, which has been plastered walls are
given a wooden frame to hold the plywood to prevent water seeping into the
plywood directly. Distance wood frame depends on the size of plywood
used. Once installed by nailing plywood on the wood frame, ready to be
installed with wall paper glue on the plywood giving. And wall paper ready
to be paired.
Another way if it is not coated with a special glue plywood that is prepared
wall paper with clean water. For 125 gr special glue mixed with 4 liters of
cold water. This mixture is enough to put 7-8 roll wallpaper. Then measure
the surface area, create a line extends vertically and use the bobble strap that
perfectly straight line. Put a piece of wallpaper upside down on the floor,
and brush glue, more edge section. Then brush the glue on the wall also to
be closed. Put the wallpaper starting at the top and level the surface with
mica, rub it up and down so the rest of wasted water.

E. PARQUET
Installation Method:
Laying parquet preceded by membrane affixed with a special glue on the
concrete rebate. Membrane serves to attach the parquet floor with perfect
precision and thus can more easily shift does not occur.

F. TEGEL
Installation Method:
For tile floors after the ground litter discarded to avoid pelesakan, then
covering, with sand and pounded pretty solid about 15 cm. After the
installation of floor tiles can be done by giving species thick approximately
2 - 3cm is 1pc: 0.5 kp : 5ps or 1pc : 3PS . Once installed along berapatan
natnya , floor tiles and then polished with a polishing machine that flat
surface .
G. MARBLE
Installation Method:
Installation is similar to marble floor tile installation. What distinguishes
marble were given rebate concrete so that water does not seep into the pores
of the marble. For customized with color grout marble.

H. LUMBRESIRING
Installation lumbresiring , before mounted adjustable humidity around it .
Nailing is done from the inside , meaning inside so as not to be seen from
outside .

I. PLAMIR
To be attached to either the wall plamir mixture used is glue and cement .
Can also be glue and CaCO3. Finishing after diplamir 1 glue : white cement
added can 3CaCO3 half heavy glue , can only be done after a painting truly
dry .

J. CEILING
asbestos ceiling
Installation of ceiling asbestos in wood frame 5/7 that has been installed .
The first asbestos drilled with the appropriate drill bit for nail 1 "is. Ceiling
intact asbestos used in the middle, while the rest of it is put alongside . If
needed trim the edge of the ceiling associated with the wall needed glue +
powdered gypsum is smeared on the edge of the installation in order to finish
more smooth and neat.
Gypsum ceiling/kalsiboard. Stages gypsum ceiling installation / kalsiboard:
1. Mounting frame .
2. Installation of gypsum / kalsiboard.
3. Compounded with a cornice which serves to eliminate / disguise the
connection.
4. Diplamir which serve to smooth / flatten / cover porous section.
5. Sanded.
6. Painted .