Design pf Pilecap

No of Piles = 6

1
Pilecap Weight

Calculations
Pile No. Dist.(L) Dist. (T) L2 T2 ZL ZT
1 1.5 -1 2.25 1 9 -60
2 1.5 2 2.25 4 9 30
3 -1.5 2 2.25 4 -9 30
4 -1.5 -1 2.25 1 -9 -60
5 1.5 5 2.25 25 9 12
6 -1.5 5 2.25 25 -9 12
7 0 0 0 0 0 #DIV/0!

ILL 13.5
ITT 60

L/C Fx ML MT
1 5192 -554 13066
2 4154 -486 11946
3 4147 -1338 10155
4 4990 -621 12728
5 3876 -546 10719
6 4091 -1296 10035
7
8

Maximum Vertical Load


Pile PT / N ML / ZL M T / ZT Total Inference
No. Load
1 865.3333 -61.5556 -217.767 586.0111
2 865.3333 -61.5556 435.5333 1239.311
3 865.3333 61.55556 435.5333 1362.422
4 865.3333 61.55556 -217.767 709.1222
5 865.3333 -61.5556 1088.833 1892.611
6 865.3333 61.55556 1088.833 2015.722
2 3

7
Traffice Directions

5 6