Tender Inviting Authority: Kanpur Development Authority

Name of Work: Development Work Of Old Maurang Mandi ,Kanpur

Contract No:

Name of the
Bidder/
Bidding Firm /
Company :

PRICE SCHEDULE
(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder
allowed to enter the Bidder Name and Values only )

NUMBER # TEXT # NUMBER # TEXT # NUMBER


Sl. Item Description Quantity Units Estimated Rate
No. in
Rs. P

1 2 4.00 5 6
1 (ROAD)
1.01 Earth work in cutting or in embankment in ordinary soil excavation 810.00 m3 95.00
to be in the form of regular pits not exceeding 0.50 M in depth and
earth work in embankment to be in 20mm thick layers including
ramming and dressing the surface to required levels and slope and
also including 1.5 lift and 30m lead the earth from cutting to be
used in making embankment.
1.02 Cartege of earth including loding unloding and cartage of 5.00 km 810.00 m3 138.40
etc all complete as per directed by E/I.with royality. (S.NO-
253A+Cartage+for Disposal.
1.03 Construction of granular sub base by providing close graded 73.00 m3 2820
materials spreading in uniform layers with motar grader on
prepared surface, mixing by mix in place method with rolavatorat
OMC and compacting with vibratory roller to achieve the desired
density completes as per clause 401

1.04 Providing and laying of wet mix macadum by providing close 79.00 m3 3125
graded material sprerdding in uniforms layers with motor graders
on prepared surface mixing by mix in place metod with rolavatroat
OMC and compecting with roller to achive reqired dencity
complete including supply of all material labour tnp required proper
complition of work.

1.05 Providing and applying primer coat with bitumen emulsion on 315.00 m2 25.80
prepared surface of granular base including cleaning of road
surface and spraying primer @ 0.75 kg per sqm. using mechanical
means as per technical specification class 502
1.06 Providing and applying tack coat with bitumen emulsion pressure 315.00 m2 9.50
distributor @ 0.25 Kg/sqm anther prepared bituminous/granular
surface cleaned with mechanical broom before B.M/ SDC

1.07 P/L Bituminous macadam with 100-120 TPH hot mix plant 52.00 cum 6440
producing an average output of 75 ton per hours using crushed
aggregates of specified grading premixed with bituminous binder
transported to site Laid over preiously prepared surface with paver
finisher including supply of all material labour T&P required proper
completion of work (3.4%VG-30).
1.08 P/L semi dance bituminous concrete 25 mm thick compacted with 29.00 cum 7830.00
100-120 TPH batch type HMP prosecuting an average output of 75
tones per hour using crushed aggregates of specified grading
premixed with bituminous binder @ 5% of mix and filler,
transporting the hot mix to work site laying with hydraulic paver
finisher with sensor control to the required grade, level and
alignment rolling with smooth wheeled vibratory type roller to
achieve the desired compaction as per MORT & H specification
clause no 508.

2 Wideing & REPAIRING ROAD


2.01 Earth work in cutting or in embankment in ordinary soil excavation 2800.00 m3 95.00
to be in the form of regular pits not exceeding 0.50 M in depth and
earth work in embankment to be in 20mm thick layers including
ramming and dressing the surface to required levels and slope and
also including 1.5 lift and 30m lead the earth from cutting to be
used in making embankment.

2.02 Cartege of earth including loding unloding and cartage of 5.00 km 2800.00 m3 138.40
etc all complete as per directed by E/I.with royality. (S.NO-
253A+Cartage+for Disposal.
2.03 Construction of granular sub base by providing close graded 2376.00 m3 2820.00
materials spreading in uniform layers with motar grader on
prepared surface, mixing by mix in place method with rolavatorat
OMC and compacting with vibratory roller to achieve the desired
density completes as per clause 401

2.04 Providing and laying of wet mix macadum by providing close 200.00 m3 3125.00
graded material sprerdding in uniforms layers with motor graders
on prepared surface mixing by mix in place metod with rolavatroat
OMC and compecting with roller to achive reqired dencity
complete including supply of all material labour tnp required proper
complition of work.
2.05 Providing and applying primer coat with bitumen emulsion on 800.00 m2 25.8
prepared surface of granular base including cleaning of road
surface and spraying primer @ 0.75 kg per sqm. using mechanical
means as per technical specification class 502
2.06 Providing and applying tack coat with bitumen emulsion pressure 12000.00 m2 9.5
distributor @ 0.25 Kg/sqm anther prepared bituminous/granular
surface cleaned with mechanical broom before B.M/ SDC

2.07 P/L Bituminous macadam with 100-120 TPH hot mix plant 990.00 cum 6440.00
producing an average output of 75 ton per hours using crushed
aggregates of specified grading premixed with bituminous binder
transported to site Laid over preiously prepared surface with paver
finisher including supply of all material labour T&P required proper
completion of work (3.4%VG-30).

2.08 P/L semi dance bituminous concrete 25 mm thick compacted with 552.00 cum 7830.00
100-120 TPH batch type HMP prosecuting an average output of 75
tones per hour using crushed aggregates of specified grading
premixed with bituminous binder @ 5% of mix and filler,
transporting the hot mix to work site laying with hydraulic paver
finisher with sensor control to the required grade, level and
alignment rolling with smooth wheeled vibratory type roller to
achieve the desired compaction as per MORT & H specification
clause no 508.

2.09 P/L of 80mm thick rubber moulded interlocking tyles over 40mm 4480.00 M2 669.50
thick local sand including supply of all material labour tnp required
proper complition of work. (Approved Rate)
2.1 P/Laying of HOT applied thermo plaster 2.5mm thick inelaying 280.00 M2 345.45
rtefier clorising glam beads @ 250gram/sqm thickness of 2.5mm in
exclusive of surface applied glam beads as per IRC 35 THE
FINISHED SURFACE TO BE LEVEL CONFORM AND FROM
Streaks and hold.

3 CONSTUCTION OF DIVIDER
3.01 Earthwork: Excavation in foundation etc. in ordinary soil including 144.00 m3 110.00
lift upto 1.5m lead upto 30m including filling watering and removal
of surplus earth as directed by the Engineer-in-charge
specification all complete.
3.02 P.C.Concrete with 40mm gauge stone ballast, C sand, cement in 48.00 m3 4800.00
1:4:8 proporation in foundation of material, labour, T and P etc
complete. (SI NO-281)
3.03 R.C.C. work in wall with1:1.5:3 Ratio cement concret work 160.00 M3 7700.00
including supply of all material labour and T&P etc excluding the
cost of Re-inforcement. Binding wire necessary centeraing &
shuttring.
3.04 MS or iron work in plain work such as R.B., RCC work (when not 251.20 Qtl 5500
included in over all rates) wrought to requirec shape as
necessuary including Bendig for Proper Completion of the work &
also supply of steel &its westage Bend Hooks & Authrosied Over
Lapping shall be measured up to floor two level.

3.05 15mm thick Cement plaster with 1:3 cement c-sand mortar with 800.00 M2 175.00
supply of all the material labour T&P etc
3.06 Finishing wall with water proofing cement paint of approved quality 800.00 SQM 51.00
with two coat to given an even shade including supply of all
materials labour T&P complete . (S.I.N-660)
4 DRAIN
4.01 Dismentling of b/w cement mortar and stacking of material as per 588.00 m3 380
direction of E/I (si-692)
4.02 Deduction cost of bricks /w.(si-1a) 67620.00 each 5.60

4.03 Deduction cost of b/b.(si-2c) 441.00 m3 850.00

4.04 Earthwork: Excavation in foundation etc. in ordinary soil including 1406.00 m3 110
lift upto 1.5m lead upto 30m including filling watering and removal
of surplus earth as directed by the Engineer-in-charge
specification all complete.
4.05 Cartege of earth including loding unloding and cartage of 5.00 km 1406.00 m3 138.40
etc all complete as per directed by E/I.with royality. (S.NO-
253A+Cartage+for Disposal.
4.06 Cement concrete with 4 cm gauge stone ballast fine sand & 135.00 m3 5830.00
cement in proportion of 4:2:1 including supply of all material labour
T & P etc required for proper completion of the work as per
direction of E/I. SI.No. 279/2018
4.07 R.C.C. work in raft with1:1.5:3 Ratio cement concret work 303.45 M3 6611.00
including supply of all material labour and T&P etc excluding the
cost of Re-inforcement. Binding wire necessary centeraing &
shuttring.
4.08 R.C.C. work in wall with1:1.5:3 Ratio cement concret work 710.12 M3 7700.00
including supply of all material labour and T&P etc excluding the
cost of Re-inforcement. Binding wire necessary centeraing &
shuttring.
4.09 R.C.C. work in slab with1:1.5:3 Ratio cement concret work 16.20 M3 7091
including supply of all material labour and T&P etc excluding the
cost of Re-inforcement. Binding wire necessary centeraing &
shuttring.
4.1 MS or iron work in plain work such as R.B., RCC work (when not 2019.00 Qtl 5500.00
included in over all rates) wrought to requirec shape as
necessuary including Bendig for Proper Completion of the work &
also supply of steel &its westage Bend Hooks & Authrosied Over
Lapping shall be measured up to floor two level.

Total in Figures

Quoted Rate in Figures


Select

Quoted Rate in Words #VALUE!


relevent columns, else the bidder is liable to be rejected for this tender. Bidders are
ues only )

NUMBER # TEXT #
TOTAL AMOUNT TOTAL AMOUNT
Without Taxes in In Words
Rs. P

53 55

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!
#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

#VALUE! #VALUE!

0.00 #VALUE!

#VALUE!