You are on page 1of 2

Table 1.

CLUSTER OF BARANGAY BALIWASAN, ZAMBOANGA CITY


STREET/PUROK/DRIVE/ZONES

MORET, SKYLINE, BULAHAN, MANGO

ZONE I DRIVE, ACACIA DRIVE

ATIS DRIVE, TAMBIS DRIVE,

ZONE II AMBASSADOR DRIVE

STAR APPLE, NEWS LANE, MONSERAT,

ZONE III CLIPPER HEIGHTS

SAMPALOC DRIVE, SAPANGPALAY,

ZONE IV BALIWASAN INTERIOR

ATILANO DRIVE, MASAMBO, BAGONG

ZONE V LIPUNAN, TIMEX DRIVE

MANGAL DRIVE, RANCHEZ DRIVE,

ZONE VI FERNANDEZ DRIVE, MAHARLIKA DRIVE,

ALVIMOR DRIVE, BCC

BALIWASAN SEASIDE, LEDESMA

ZONE VII COMPOUND, ILANG-ILANG

Table 1.1
STREET/PUROK/DRIVE/ZONES NUMBER OF HOUSEHOLDS/FAMILIES
ZONE I 656
ZONE II 514
ZONE III 420
ZONE IV 355
ZONE V 1,117
ZONE VI 1,186
ZONE VII 1,218
TOTAL: 5,466
Table 2. SUGGESTED VALUE OF COEFFICIENT OF RUNOFF C, FOR USE OF
RATIONAL FORMULA
Type of Drainage Area Coefficiency of Runoff

Concrete or Bituminous Pavement 0.8-0.9


Gravel Roadways, open 0.4-0.6
Bare Earth (high value for steep slope) 0.2-0.8
Turf Meadows 0.1-0.4
Cultivated Fields 0.2-0.4
Forested Areas 0.1-0.2

TABLE 3. REPRESENTATIVE VALUES OF ROUGHNESS COEFFICIENT n,


VARIOUS CHANNEL LININGS
(Manning Formula)
Type of Lining Value of n,

Ordinary Earth, Smooth Gravel 0.02


Rough Rubble or Jagged Rock 0.04
Rough Concrete 0.02
Bituminous Lining 0.02
Smooth Rubble 0.02
Well maintained grass-depth of flow over 15 cm 0.04
Well maintained grass-depth of flow under 15 cm 0.06
Heavy Grass 0.12

You might also like