ACTIVITY RESOURCE REQUIREMENTS
Project Title: Warehouse Construction Date Prepared:
WBS ID Type of Resource Quantity Assumptions
P-Person, Construction Workers
(CW), E-Equipment, S-Supplies, M-
Construction Material
1.1 P-Architect; S-
1.2 P-Engineer; S-Documents
2.1 P-CW,; E-Bulldozers, Shovels, Only major construction equipment
Pickaxes and materials needed are included
(i.e. Personal Protective Equipment
2.2 P-CW; E-Excavators, Backhoe (PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
2.3 P-CW; E-Wheelbarrow, Tamping to be included; also measuring tools,
Tool drilling machines etc. are assumed to
be included)
2.4 P-CW; E-Rebar Cutting Tool and
Pliers, Concrete Batching Plant,
Concrete Mixer, Concrete Pump,
Rakes, Vibrators, Saws, Power
Trowels; M-Sand, Gravel, Water,
Cement
3.1 P-CW; E-; M-Ready Mix Concrete, Only major construction equipment
Earth, Mould Release Agent, Steel and materials needed are included
(i.e. Personal Protective Equipment
(PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
to be included; also measuring tools,
drilling machines etc. are assumed to
be included)
3.2 P-CW; E- Only major construction equipment
and materials needed are included
(i.e. Personal Protective Equipment
(PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
to be included; also measuring tools,
drilling machines etc. are assumed to
be included)
3.3 P-CW; E- Only major construction equipment
and materials needed are included
Page 1 of 1
(i.e. Personal Protective Equipment
(PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
to be included; also measuring tools,
drilling machines etc. are assumed to
be included)
3.4 P-CW; E- Only major construction equipment
and materials needed are included
(i.e. Personal Protective Equipment
(PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
to be included; also measuring tools,
drilling machines etc. are assumed to
be included)
3.5 P-CW; E- tools such as screwdriver, Only major construction equipment
pliers, cable cutters, spanners, pipe and materials needed are included
wrench; M-Electrical Wires and (i.e. Personal Protective Equipment
Cables, Junction Boxes, Lighting and (PPE) such as hard hats, steel-toe
Switches, Plumbing Pipes and Valves boots, safety glasses, etc. are assumed
to be included; also measuring tools,
drilling machines etc. are assumed to
be included)
4.1 P-CW; E- Only major construction equipment
and materials needed are included
(i.e. Personal Protective Equipment
(PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
to be included; also measuring tools,
drilling machines etc. are assumed to
be included)
4.2 P-CW; E- Only major construction equipment
and materials needed are included
(i.e. Personal Protective Equipment
(PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
to be included; also measuring tools,
drilling machines etc. are assumed to
be included)
5.1 P-CW; E- Paint brushes, Roller tray, Only major construction equipment
Pain Pail, Ladders; Materials-Paint and materials needed are included
(i.e. Personal Protective Equipment
(PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
to be included; also measuring tools,
Page 1 of 1
drilling machines etc. are assumed to
be included)
5.2 P-CW; E- Only major construction equipment
and materials needed are included
(i.e. Personal Protective Equipment
(PPE) such as hard hats, steel-toe
boots, safety glasses, etc. are assumed
to be included; also measuring tools,
drilling machines etc. are assumed to
be included)
5.3 P-CW, E-Broom, Dustpan, Dust Mop