Professional Documents
Culture Documents
LIFTING FOR
POWER CONTROL CENTERS
0
00
20
R
CRANE LAY OUT
MOVING OBJECT FROM A TO B
B
01. OBJECTIVE
RIGGING DEPARTMENT Rigging Study of Lifting Power Control Centers.
ANALYZE AND PLANED ACTIVITY FOR
02. SCOPE OF APPLICATION
LIFTING AND ERECTION WORK Rigging study is describe the guidelines and operating step of Lifting Power Control Centers.
START
03. REFERENCE
1. HaGun Engineering RIGGING DEPARTMENT REFERENCE
DATA MATERIAL
1. DIMENSION
2. WEIGHT 04. EQUIPMENT
No Equipment Qty Capacities Remark
01 Crawler Crane 1 unit 150 ton New
REFERENCE
1. RIGGING BOOK 02 Boom Length 48 meter 1 unit New
2. EQUIPMENT MANUAL 03 Trailer 1 unit 80 ton New
3. ASME B30.5-2004 Mobil & Locomotive cranes
4. ASME B30.6-2003 Derrick 05. RIGGING TOOLS
5. ASME B30.10-1999 Hook
No Equipment Qty Capacities
6. ASME B30.21-2005 manually lever operated hoist
7. ASME B30.24-2003 Safety standard for cranes,derrick, hoist, jacks, and Sling 01 Sling dia. 1.5" x 13 M 4 pcs 17 ton
02 Chain Block 2 pcs 10 ton
TER
10. Australian Standard, AS 3569--1989, Wire ropes 04 Manila Rope 7/8"x10M 2 pcs
11. Australian Standard, AS 2759--1985, Wire ropes
48
No Equipment Qty
Yes
NEED DUO CRANE 01 Safety Barricade Red White 77 mtr
BO
05 Shackle 0.15 T
RIGGING PLAN
06 Total Weight 24.23 T
07 Crane Capacity 26.62 T
ACTION
3 METER
Yes
Prepare Final Report for ApprovaL
Handover
FINISH
20000