YYOVY © *VAY/ C.ye CVolial) 5100! gi Law§o HABOOB AL-TAMAIOZ.EST 5 C.R/2252100782 THE REPORT After we have received the valve (10"X 1500 Ball Valve ) , our specialist inspected the valve. by Hydro test to give us the initial report . The valve founded to be leaking from the upper, body cavity relief. Since we have no idea what makes this pretty much a new valve _¢ leaks from such an area, our specialists have decided to do overhaul to make sure there is no crack in the inside body. They have developed a welding process by considering the special materials that need to be used and the right temperature to avoid any physical properties problems. After finishing the welding process , we let the valve one