CHILLED WATER SYSTEM


OPTIMIZATON
Presented by

David A. Rogers, P.E


Harold A. Hougham, P.E.
CHILLED WATER SYSTEM OPTIMIZATON

ENGINEERING APPLIED TO
OPERATIONS
(Retro Commissioning)
CHILLED WATER SYSTEM OPTIMIZATON
THE CONCEPT

SYSTEM FUNDAMENTALS

THE PROCESS

THE RESULTS
CHILLED WATER SYSTEM OPTIMIZATON

THE CONCEPT
CHILLED WATER SYSTEM OPTIMIZATON
CHILLED WATER SYSTEM OPTIMIZATON
CHILLED WATER SYSTEM OPTIMIZATON
CHILLED WATER SYSTEM OPTIMIZATON

SYSTEM FUNDAMENTALS
CHILLED WATER SYSTEM OPTIMIZATON

THE THREE RULES FOR HYDRONIC


SYSTEMS OPTIMIZATION

PUMP LESS WATER

PUMP LESS WATER

PUMP LESS WATER


CHILLED WATER SYSTEM OPTIMIZATON

“Distribution System DELTA T

Drives the Plant (s)”


CHILLED WATER SYSTEM OPTIMIZATON
Syllabus
Systems Concepts
Simple Formulas
Rules of Thumb
System Configurations
Hydraulic Profile
System Components
Delta T
Flow Limited Plant
How your System works – Now/Optimized
CHILLED WATER SYSTEM OPTIMIZATON

Systems Concepts

A system is a group of components


that when connected and operating
provide a desired result.
CHILLED WATER SYSTEM OPTIMIZATON

Systems Concepts

Production Distribution Load


CHILLED WATER SYSTEM OPTIMIZATON

Systems Concepts

Pumps
Chillers

Pumps
Load

Cooling Tower
CHILLED WATER SYSTEM OPTIMIZATON
Systems Concepts
Chilled Water System

Secondary Pumps

Chillers

Data & Controls

Decoupler
Production Distribution
System System
Load

Primary Pumps
CHILLED WATER SYSTEM OPTIMIZATON
Simple Formulas
Chilled Water Delta T = T return water - T supply water

GPM/TON = 24/Delta T

Pump Affinity Laws = Q1/Q2=N1/N2


H1/H2=(Q1/Q2)2
BHP1/BHP2=(Q1/Q2)3

Q = Flow, N = rpm, H = Head

BHP = Brake Horsepower


CHILLED WATER SYSTEM OPTIMIZATON
Simple Formulas
Chilled Water Delta T
Control Valve

CHWR T = 60oF Cooling Coil

CHWS T = 42oF
Chilled Water Delta T = T return water – T supply water
Chilled Water Delta T = 60 – 42 = 18 degrees.
CHILLED WATER SYSTEM OPTIMIZATON
Simple Formulas
GPM/Ton = 24/Delta T
How many tons of cooling are served by a 6,000 gpm/12
degree delta T distribution system?

GPM = 6,000

Delta T = 12 degrees

24/Delta T = 24/12 = 2 GPM/Ton

Tons Cooling = GPM/(24/Delta T) = 6,000/2 = 3,000 tons

HOW MANY CHILLERS DO I HAVE ON LINE TO SERVE THIS


3000 TON LOAD?
CHILLED WATER SYSTEM OPTIMIZATON
Simple Formulas
Pump Affinity Laws
Pump Affinity Laws can be used to estimate system performance
but should be modified to reflect system performance.
What is the approximate required pumping horsepower if I
cut system flow in half while still serving the same cooling
load?
10,000 GPM requires 240 BHP

5,000 GPM requires ? BHP.

Q1 = 10,000 GPM, Q2 = 5,000 GPM, BHP1 = 240

BHP2 = BHP1(Q2/Q1)3 or BHP2 = 240(5,000/10,000)3 = 240/8 ≈ 30 BHP


CHILLED WATER SYSTEM OPTIMIZATON
Rules of Thumb
•Water Always Flows from a Higher Pressure to a Lower Pressure.

•Minimum Delta P for a control valve = 5 psig

•Minimum Delta P for a Bldg Interface = 20 psig

•Distribution System Delta T should always be ≥ Production System


Delta T

•Production System Delta T should always be < Chiller Delta T


CHILLED WATER SYSTEM OPTIMIZATON
Rules of Thumb
Minimum Delta P Across a Control Valve is 5 psig
Control Valve

P3= 11 psig P1= 18 psig


Cooling Coil

Delta P = 18 – 11 = 7 psig

WHAT HAPPENS IF DELTA P IS ZERO?


CHILLED WATER SYSTEM OPTIMIZATON
Rules of Thumb
Minimum Delta P Across a Building Interface is 20 psig
Pressure Compensating Control Valve

Pout= 18 psig
Building
Pin= 40 psig

Delta P = 40 – 18 = 22 psig

WHAT HAPPENS IF DELTA P IS 10 PSIG?


CHILLED WATER SYSTEM OPTIMIZATON
Rules of Thumb
Distribution System Delta T should always be ≥ Production System Delta T

TPS=42oF TDS=42oF
Chillers
Secondary Pumps

Production Distribution
System System
Load

TPR=56oF
TDR=58oF
Primary Pumps

Distribution Delta T = 58 – 42 = 16 degrees


Production Delta T = 56 – 42 = 14 degrees
CHILLED WATER SYSTEM OPTIMIZATON
Rules of Thumb
Production System Delta T < Distribution System Delta T

Load
Chiller % Production Production Distribution Delta
in
Load CHWR Delta T CHWR T
Tons
2000 100 58 16 58 16
1800 90 56.4 14.4 58 16
1600 80 54.8 12.8 58 16
800 40 48.4 6.4 58 16
CHILLED WATER SYSTEM OPTIMIZATON
Rules of Thumb
Production System Delta T should always be < Chiller Delta T
0.75

0.7

0.65

CHILLER 3
KW/Ton

CHILLER 4&5
CHILLER 6&7

0.6

0.55

0.5
20 30 40 50 60 70 80 90 100
% Full Load
CHILLED WATER SYSTEM OPTIMIZATON

System Configurations
• Primary/Secondary – Constant Flow/Variable Flow
• Primary Only – Constant Flow
• Variable Primary Flow (VPF) – Variable Flow
• Multiple Plants/Common Distribution Loop
–Plant 1 – Primary/Secondary
–Plant 2 – Primary Only
–Plant 3 –Primary/Secondary
CHILLED WATER SYSTEM OPTIMIZATON
Primary/Secondary
Constant Flow/Variable Flow

Chillers
Secondary Pumps

Production Distribution
System System
Load

Primary Pumps
CHILLED WATER SYSTEM OPTIMIZATON
Primary Only
Constant Flow
Chillers
Secondary Pumps

Distribution
Production
System
System
Load

Primary Pumps
CHILLED WATER SYSTEM OPTIMIZATON
Variable Primary Flow
Variable Flow
Chillers

Production/
Distribution System

Production/ Load
Distribution Pumps
CHILLED WATER SYSTEM OPTIMIZATON
Multiple Plants on a Common
Distribution Loop
CHILLED WATER SYSTEM OPTIMIZATON
Hydraulic Profile
A graphical representation of the
dissipation of system head.
Ft of Head

Distance
CHILLED WATER SYSTEM OPTIMIZATON
Hydraulic Profile
Primary/Secondary System
Ft of Head
CHILLED WATER SYSTEM OPTIMIZATON
Hydraulic Profile
Two Plants Common Distribution Loop
Ft of Head
CHILLED WATER SYSTEM OPTIMIZATON
Hydraulic Profile
The Hydraulically Most Remote Point

Hydraulically most remote


point & location of VFD DP
sensor
Ft of Head

Physically most remote point

Distance
CHILLED WATER SYSTEM OPTIMIZATON
Hydraulic Profile
Building System/Hydraulically Most Remote Point
Ft of Head
CHILLED WATER SYSTEM OPTIMIZATON

System Components

• Chillers
• Cooling Towers
• Pumps
•Control Valves/Cooling Coils
CHILLED WATER SYSTEM OPTIMIZATON
Chillers/Cooling Towers
CHILLED WATER SYSTEM OPTIMIZATON
Chiller Performance
COP = Output/Input
COP = Q4-1/W1-2

Q2-3 = m(h2 – h3)

Point 3 Pressure = C Point 2

Pressure
h3 = h4
LIFT

Q4-1 = m(h4 – h1)


Pressure = C W1-2 = m(h2 – h1)
Point 4 Temperature = C
Point 1

Compressor
P-1 Work

Enthalpy
CHILLED WATER SYSTEM OPTIMIZATON
Cooling Tower Performance
Entering Condenser Water 95
degrees

Range 95 – 85 = 10 degrees

Leaving Condenser Water 85


degrees

Outside Air Wet Bulb Temperature Approach 85 – 76 = 9 degrees


76 degrees
CHILLED WATER SYSTEM OPTIMIZATON
Cooling Tower Performance
2.5

Constants
Heat Load
2.0
Range
Tower Size Factor

Wet Bulb

1.5

1.0

0.5

5 10 15 20 25 30

Approach
CHILLED WATER SYSTEM OPTIMIZATON

Pumps

How They Work


Arrangements
CHILLED WATER SYSTEM OPTIMIZATON

Pumps – How They Work


CHILLED WATER SYSTEM OPTIMIZATON

Pumps – How They Work


B Outlet Tip of Impeller
C Vane

A
Pressure B C
Inlet Tip of
Impeller Vane
A
Centrifugal Pump

Velocity

Suction Discharge

Flow Path
CHILLED WATER SYSTEM OPTIMIZATON
Pumps – How They Work
NPSH = Net Positive Suction Head

B Outlet Tip of Impeller


C Vane

A
Pressure B C

A
Centrifugal Pump

Collapsing x
Bubbles x Velocity
x
x
Vapor
Bubbles
Suction Discharge
Pump Impeller Blade Flow Path
CHILLED WATER SYSTEM OPTIMIZATON
Pumps – How They Work
Typical Pump Curve
CHILLED WATER SYSTEM OPTIMIZATON
Pumps – How They Work
Variable Frequency Drives
CHILLED WATER SYSTEM OPTIMIZATON
Pumps – How They Work
Variable Speed Pump Curves
CHILLED WATER SYSTEM OPTIMIZATON
Head Ft.
Pumping Arrangements

Head Ft.
CHILLED WATER SYSTEM OPTIMIZATON

Cooling Coil/Control Valve

Configurations
How They Work
CHILLED WATER SYSTEM OPTIMIZATON

Cooling Coil/Control Valve


Configurations
CONTROL VALVE

CHWR 56+ degrees

Leaving Air 55 degrees Entering Air 70 degrees

Delta T: 56 – 42 = 14
COOLING COIL
degrees

CHWS 42 degrees
CHILLED WATER SYSTEM OPTIMIZATON
Cooling Coil/Control Valve
How They Work
“Control Valves Waste Energy”
Ft of Head
CHILLED WATER SYSTEM OPTIMIZATON
Cooling Coil/Control Valve
How They Work
Actuator Arm Connected
to the Valve Shaft

Valve Shaft
Valve Disc Not Fixed

FLOW

Valve Seat Fixed


CHILLED WATER SYSTEM OPTIMIZATON
Cooling Coil/Control Valve
How They Work
CHILLED WATER SYSTEM OPTIMIZATON
Delta T
• Difference between CHW Return & CHW Supply
and Chilled Water Supply Temperatures
Delta T = TCHWR - TCHWS
Q = C x GPM x Delta T
• For the same Q if delta T is low then GPM
is high & if delta T is high then GPM is low!
5,000,000 Btuh = C x 1000 gpm x 10 F
= C x 500 gpm x 20 F
CHILLED WATER SYSTEM OPTIMIZATON
Low Delta T / Flow Limited Plant
2,000 Ton Chillers, 14 degree
delta T, 3,429 gpm each Secondary Pump P-2,
Variable Flow 42 degree CHWS
Chiller

Load
Chiller Typical
Distribution
Chiller Loop Pressure
Production Decoupler Compensating
Loop Valve Typical

Load in Production On Line Percent Distribution Distribution Dist.


Tons Gpm Tonnage Loaded Gpm CHWR Delta T

2000 3429 (1)2000 100 3429 56 14


2000 6858 (2)4000 50 4000 54 12
2000 6858 (2)4000 50 6000 50 8
2300 10287 (3)6000 38.3 6900 50 8
CHILLED WATER SYSTEM OPTIMIZATON
Delta T Flow Limited Plant
CENTRIFUGAL CHILLER EFFICIENCIES

0.75

0.7

0.65

CHILLER 3
KW/Ton

CHILLER 4&5
CHILLER 6&7
0.6

0.55

0.5
20 30 40 50 60 70 80 90 100
% Full Load
CHILLED WATER SYSTEM OPTIMIZATON
Delta T Flow Limited Plant
Estimated Annual Part Load Chiller Savings
due to Increased Efficiency for non Flow
Limited Operations
• Flow limited average kw/ton = 0.55
• Non flow limited average kw/ton = 0.523
• Annual average part load = 2000 tons
• Annual part load hours of operation = 8,000
• Cost of electricity including demand = $0.14
• Estimated annual part load chiller
savings due to increased efficiency
of operation =
(0.55-0.523)(2000)(8000)(0.14) = $60,480
CHILLED WATER SYSTEM OPTIMIZATON
High Delta T / Full Load Plant
2,000 Ton Chiller, 14 degree
delta T, 3,429 gpm Secondary Pump P-2,
Variable Flow 42 degree CHWS
Chiller

Load
Typical
Production Distribution
Loop Loop Pressure
Compensating
Decoupler
Valve Typical

Load in Production Production Percent Distribution Distrib. Dist.


Tons Gpm CHWR Loaded Gpm CHWR Delta T
2000 3429 56 100 3429 56 14

2000 3429 56 100 3000 58 16

2000 3429 56 100 2667 60 18


CHILLED WATER SYSTEM OPTIMIZATON
High Delta T / Part Load Plant

Load in Production Production Percent Distribution Distrib. Dist.


Tons Gpm CHWR Loaded Gpm Gpm Delta T
2000 3429 56 100 3429 56 14

1800 3429 54.6 90 2700 58 16

1800 3429 54.6 90 2400 60 18

1600 3429 53.2 80 1920 62 20


CHILLED WATER SYSTEM OPTIMIZATON
Chilled Water Cost Variables
Variables Constants

Average Annual Cooling Load 4,500 Tons Flow 500


Electric Chiller/Tower/Condenser & Production Pumps 0.9 Kw/Ton Ton 12000 Btuh
Absorption Chiller/Tower/Condenser & Production Pumps 0.3 Kw/Ton Power 0.746 Kw/Hp
Distribution System Delta T 11 Degrees F Max Speed 60 Hz
Cost of CHP Electrical Power $0.065 $/Kwh GPM/Ton 24
Power Factor 0.9 System Curve Constant 0.8
Pump Efficiency 0.87 MM 1,000,000
Pump Design Flow 15000 GPM
Pump Design Head 155 Ft
Pump Hp 750 Hp Assumptions
Electric Chiller Capacity 2000 Tons
Absorption Chiller Capacity 1385 Tons Absorption Chillers are always lead chillers
Number of Electric Chillers 1 Electrical Cost includes all byproduct burdens
Number of Absorption Chillers 2 Building Pumping is not considered a CHP operatio
Electric Chillers 12 Delta T
Absorption Chillers 16 Delta T

Costs not Included


Calculations
Capital Funding
Distribution Flow 9818 GPM Sinking Funds
Distribution Pump Hp each 210 Hp Load Flow Administrative
Distribution Pumping Kw each 200 Kw
Absorption Chillers Operating 2 2
Electric Chillers Operating 1 2
Number of Distribution Pumps Running 1
Percent rpm each pump 65%
Annual Average Cost of Cooling $5.57 $/MMBtu
Electric Chillers Flow 4000 GPM
Absorption Chillers Flow 2078 GPM
CHILLED WATER SYSTEM OPTIMIZATON

How does your System work Now ?

Existing Distribution System Maximum Delta T = ??


degrees
Existing Distribution System Average Delta T = ?
degrees
Chillers – Staging?
System Pumping Energy – Optimized or not
Optimized? (Control Delta P)
CHILLED WATER SYSTEM OPTIMIZATON

How should your System work


when Optimized?
Optimized Maximum Delta T = ?? degrees
Optimized Average Delta T = ?? degrees
Chillers – Staging ??
System Pumping Energy – Optimized or not
Optimized ??
CHILLED WATER SYSTEM OPTIMIZATON

THE PROCESS
CHILLED WATER SYSTEM OPTIMIZATON
Step #1
Chilled Water Systems Questionnaire
for Initial System Evaluation

SYSTEM DATA
ROI
CHILLED WATER SYSTEM OPTIMIZATON
Step #2
Pre Project Staff Training
CHILLED WATER SYSTEM OPTIMIZATON
Step #3
Pre Project Measurement & Verification (M&V)
Data Historian/Sensors Project ?

BEFORE AFTER
CHILLED WATER SYSTEM OPTIMIZATON
Step #4
Chilled Water System Engineering
Evaluation & Analysis
CHILLED WATER SYSTEM OPTIMIZATON
750 HP; 14,000 GPM; 8o∆ T;
800
Pumping HP

700
600
500
400
300
200
100
0
10

12

14

16

18

20

22

24
8

System Delta T
CHILLED WATER SYSTEM OPTIMIZATON
Step #5
Report of Findings and Recommendations

ROI
CHILLED WATER SYSTEM OPTIMIZATON
Step #6
Implement Chilled Water System
Optimization Construction Project
CHILLED WATER SYSTEM OPTIMIZATON
Step #7
Commission Chilled Water System
Optimization Project
CHILLED WATER SYSTEM OPTIMIZATON
Step #8
Post Project M&V for Rebate Verification

BEFORE AFTER
CHILLED WATER SYSTEM OPTIMIZATON
Step #9
Post Project Staff Training
CHILLED WATER SYSTEM OPTIMIZATON

THE RESULTS
CHILLED WATER SYSTEM OPTIMIZATON

The University of California


Davis Medical Center,
Sacramento
CHILLED WATER SYSTEM OPTIMIZATON
UCDMC
1. 3,000,000 square feet Trauma
Center/Hospital/Clinic & Educational Buildings.
2. 26 MW CHP w/ Primary/Secondary 16 degree
plant serving a 12 degree campus.
3. Each building was decoupled and pumped.
4. Average distribution system delta T was 8
degrees. Maximum delta T was 11 degrees.
CHILLED WATER SYSTEM OPTIMIZATON
Results
Operations
1. 18 degree distribution system delta T w/ 114
degrees outside air temperature.
2. Central plant spare distribution pump and chiller
capacity.
3. Some buildings performing in excess of 20 degree
delta T.
4. Average system delta T is 12 degrees.
CHILLED WATER SYSTEM OPTIMIZATON

Results
Financial
1. Financial data not available due to lack of system
instrumentation.

Energy
2. Energy data not available due to lack of system
instrumentation.
CHILLED WATER SYSTEM OPTIMIZATON
Lessons Learned
1. Create a system optimization sensor project to
facilitate data acquisition for pre & post project
M&V.
2. Provide pre project staff/management training
to facilitate a coordinated effort for all parties.
3. Develop a detailed Site Acceptance Test for
control valve commissioning.
CHILLED WATER SYSTEM OPTIMIZATON

BIOTECHNICAL CORPORATION
CHILLED WATER SYSTEM OPTIMIZATON

Biotechnical Corp
1. 3,000,000 square feet of R&D, Office & Production
across 25 buildings.
2. Three Central Plants on common distribution loop,
14,100 ton installed capacity.
3. Delta T performance was 6 degrees part load and a
maximum of 11 degrees at full load.
4. A 14 degree campus.
CHILLED WATER SYSTEM OPTIMIZATON
Results
Operations
1. Achieving distribution loop 20 degree Delta T @
full and part load.
2. Maximum flow distribution pumping requires 3 and
not 4 operational pumps
3. Delayed major capital infrastructure expansion
project for 3 years due to optimizing use of
existing infrastructure.
CHILLED WATER SYSTEM OPTIMIZATON

Results
Financial
1. Financial data not available due to lack of
system instrumentation.

Energy
1. Energy data not available due to lack of
system instrumentation.
CHILLED WATER SYSTEM OPTIMIZATON
Lessons Learned
1. Discovered other system issues that were masked
by poor system performance; Damper Failures,
Sensor Calibration, etc.
2. Train installing controls contractor on Systems
Optimization Concept and Process.
3. Verify AHU isolation valve arrangement and function
prior to issuing contract requiring continued system
operation during construction.
CHILLED WATER SYSTEM OPTIMIZATON

The University of Iowa

Hospital and Clinics


CHILLED WATER SYSTEM OPTIMIZATON

UIHC
1. 4,000,000 square feet of contiguous hospital/clinic
space between five buildings.
2. Central Plant metered and billed for each building.
3. Each building is decoupled and pumped.
CHILLED WATER SYSTEM OPTIMIZATON
Results
Operations
1. Resolved low chilled water pressure & flow to
Operating Room Air handlers.
2. Resolved condensation issue on cooling panel
ceilings in patient rooms.
3. Removed tertiary building pumps and reduced
operation of building pumps
CHILLED WATER SYSTEM OPTIMIZATON
Results
Financial
1. Savings $2,800,000 for the last 2 cooling seasons
primarily from penalty reduction.
2. Chilled Water billing based on building flow and an
assumed Delta T of 16 Degrees.
CHILLED WATER SYSTEM OPTIMIZATON

Results
Energy
1. Original simple payback estimate 5 years.
2. System instrumentation was not adequate to
measure actual energy reduction.
CHILLED WATER SYSTEM OPTIMIZATON

Lessons Learned
1. Building system instrumentation not adequate
to provide M&V for energy consumption.
2. Building system energy savings and
production/distribution billed savings are not
the same number.
3. Production/distribution system billed savings
represented a simple payback of less than 9
months.