You are on page 1of 1

RC 1 2 3 4 5

Y 1925.450

26°42'3
57000

6''
PILAS DEL ÁREA/ 15000 15000 12000 9970 5030
PILES OF AREA
WH44.20201
COORDENADAS 3600
DE PROYECTO PILAS /PILES HSPM PILAS /PILES HSPM PILAS /PILES HSPM PILAS /PILES HSPM

Y 1986.200
Y 1925.450 BUILDING SEE SHEET BUILDING SEE SHEET BUILDING SEE SHEET 1275 2325 2705 BUILDING SEE SHEET
X 813.700 C.7WY0.WS.71.20-Z_ZPS001 C.7WY0.WS.71.20-Z_ZPS001 C.7WY0.WS.71.20-Z_ZPS001 C.7WY0.WS.71.20-Z_ZPS001
HB X 813.700
PILAS /PILES HSPM
6808
BUILDING SEE SHEET

2650
C.7WY0.WS.71.20-Z_ZPS001

3550
3850
P-K02F P-K02F

5215
1625 2990 P-K02C

7620

4400
P-K02B P-K02B
10300

3608
4000
1630 1630 1630 4995
P-K02C P-K02F P-K02F
P-K02D P-K02D
P-K02E

PILAS DEL ÁREA/


PILES OF AREA

2400
WH44.20201 3350

2680
P-K02B P-K02B P-K02D P-K02D

4040
1750 1600 3430

.8

2400
P-K02B

1480
P-K02E
P-K02D P-K02D
24000

P-K02G P-K02G

7545

3810
2500

3167
1250 1250 3780
7400

P-K02D

P-K02 P-K02 P-K02 P-K02 P-K02 P-K02 P-K02A P-K02A


P-K02H P-K02H

2775
1780

1500
1350

1350

1350

4040
12650
2700

2700
1350

1350

1350

1350
P-K02 P-K02 P-K02 P-K02 P-K02 P-K02

1500
P-K02A P-K02A P-K02C P-K02G

2450
PILAS DEL ÁREA/
PILES OF AREA
WH44.20201
6300

P-K02G

2500
4950

4950

4835
PILAS /PILES HSPM PILAS /PILES HSPM PILAS /PILES HSPM PILAS /PILES HSPM

1375
P-K02C
BUILDING SEE SHEET BUILDING SEE SHEET BUILDING SEE SHEET P-K02G BUILDING SEE SHEET
Y 1925.450

C.7WY0.WS.71.20-Z_ZPS001 C.7WY0.WS.71.20-Z_ZPS001 C.7WY0.WS.71.20-Z_ZPS001 C.7WY0.WS.71.20-Z_ZPS001


HA X 837.700
PILAS /PILES HSPM
BUILDING SEE SHEET
C.7WY0.WS.71.20-Z_ZPS001

3000 3000 4680 3750 4870 4000 3000 3130 1370 1500 1500 7370 3260 12000
56430

12200
PLANTA DE LOCALIZACIÓN DE PILAS PARA EQUIPOS/PILES LAYOUT FOR EQUIPMENT
1 : 100 11825

2650 3705

8645 1325 1325 2175 1530 1970 3500

P-K02A P-K02A

P-K02A P-K02A P-K02A

1325
X 849.900

2650

1325

Y 1981.170

Y 1986.200
P-K02A P-K02A

9970 5030

Notas / Notes
Rev. Modificación/Modification contents Fecha/Date Dibujó/Made by Revisó/Checked by
1. Dimensiones en milímetros excepto donde se indique lo contrario/ Dimensions in millimeters except where A ISSUED FOR REVISION 27/07/18 IIMB EAG
indicated otherwise. 00 APPROVED FOR CONSTRUCTION 07/08/18 CTC EAG
Maximun compression, tension, and lateral forces for SLS and ULS
Actuante/ Acting 2. Coordenadas y niveles en metros/ Coordinates and levels in meters.
Sección/ Estado límite/ 3.El nivel +-0.00 corresponde al nivel +4.75 m.s.n.m./Plant +-0.00=4.750 above sea level.
Section Limit state Compresión/ Tensión/ Cortante/
(m) Compression Tension Shear Notas/Notes:
(ton) (ton) (ton) Customer Doc. No.: CU-LOGO
1. Materiales/ Materials:
P-K02 Servicio/ Serviceability 32.61 N/A 0.70 C.S.-C7WY0
a) Concreto con resistencia a sulfatos/
(0.80 m) Último/ Ultimate 41.13 N/A 1.05 Concrete with sulphates resistance. f'c=280 kg/cm2
P-K02A Servicio/ Serviceability 53.00 N/A 0.95 b) Acero de refuerzo longitudinal/ Reinforcement steel:
fy=4200 kg/cm2 Project: Sub Supplier:
Nomenclatura / Abreviation:
(0.80 m) Último/ Ultimate 66.60 N/A 1.26 c) Concreto para plantillas/ Concrete screed: f'c= 100kg/cm2 CROQUIS DE LOCALIZACIÓN / KEY PLAN AMCL Sub Supplier
60.74 N/A 2.89 2. Recubrimiento libre 7.5 cms., medidos a partir del paño exterior del refuerzo principal./Free coating CN Canal/ Flume CT Contratrabe/Foundation Beam Doc No:
P-K02B Servicio/ Serviceability
7.5 cm., measured from the outer cloth of the main reinforcement. MR Muro de tabique refractario/ Refractories Wall MC Muro de concreto/Concrete Wall Plant: Date Name
(0.80 m) Último/ Ultimate 75.43 N/A 3.69
3. El tamaño máximo del agregado grueso será de 19 mm./The maximum size of the coarse aggregate MB Muro de mampostería/ Mansonry Wall C Columna/Column HOT SKIN PASS MILL Made by 27/07/18 IIMB
P-K02C Servicio/ Serviceability 65.64 N/A 1.35 will be 19 mm.

26°4
DL Dala de concreto/ Simple Beam B Base/Base

2'36''
Area:

N
X= 666.00

Checked by 27/07/18
A25

(0.80 m) Último/ Ultimate 81.26 N/A 1.78 4. El constructor deberá proporcionar un sistema de alineamiento definitivo y un sistema de rigidización EAG
del conjunto que constituye el refuerzo de una pila con el objeto de reducir al mínimo las posibles
ES Embebido/ Steel embedded L Losa/Slab 18H
CIVIL WORKS Approved by 27/07/18 JDBC
P-K02D Servicio/ Serviceability 63.40 N/A 0.87 T Trabe/ Beam Concrete TB Tableta de concreto/ Concrete Covering
17H

C LF URN ACE
deformaciones durante su colocación y proceso de colado./The constructor must provide a definitive
16H

15H

(0.80 m) Último/ Ultimate 77.80 N/A 1.19 alignment system and a stiffening system of the assembly that constitutes the reinforcement of a pile in K Castillo/ Simple Column ZN Zuncho/Rebar hoop
14H

13H
Equiment: Material -
P-K02E Servicio/ Serviceability 32.61 N/A 0.70 order to minimize the possible deformations during its placement and casting process. D Dado/ Concrete Reinforcement Square E Estribo/Stirrup C L CH AR GING
A15a

A14
12H

11H

10H
2K 3K 4K 5K 6K 7K
HSPM EQUIPMENT FOUNDATION Mass (kg) -
5. Se deberá prestar particular atención al N.A.F.= -3.34 (Ele +1.41) referente al nivel del brocal,
X= 812.20
9H
HB
A13

(0.80 m) Último/ Ultimate 41.13 N/A 1.05 Z Zapata/ Individual footing H.M.E. Hueco en muro eléctrico/Wall hole for electrical services B4
X= 831.00 A12
B4
Ca Cb
8H

Sub-Group:
tomando como nivel de plataforma N.=+4.35 m según sondeo 8MC-SMT-DH2.SONDEO2017/ Should be Security Level -
7H
4E HA
A11

3E 6H
A10 J1
X= 856.00 1K

P Pila/Pile Foundation H.M.T. Hueco en muro tuberías/Wall hole for piping


B3 B3

32.22 N/A 3.05


2E 5H

P-K02F Servicio/ Serviceability attention to N.A.F.= -3.34 (Ele +1.41) concerning to level of curb, taking as platform level the N.=+4.35 C L MILL
1E

4H

B2
X= 884.50
B2 3H

Status -
(0.80 m) Último/ Ultimate 40.54 N/A 4.28 according probe 8MC-SMT-DH2.SONDEO2017. CB Cabezal/ Header H.L.E. Hueco en losa eléctrico/Floor hole for electrical services B1b B1b
2H

1H
J2

Drawing Name
B1

6. Se deberá tomar las debidas precauciones en todas las etapas del trabajo para asegurar que las pilas DEEP FOUNDATION / LAYOUT OF PILES
X= 919.60

Document
1J 61J
B1

PL Placa/Plate H.L.T. Hueco en losa tuberías/Floor hole for piping


RA RB RC

22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46

P-K02G Servicio/ Serviceability 28.71 N/A 8.45 no esten sujetas a flotación./It should be taken an appropriate precautions at all stages of work to
I1

-
TR Trinchera/Trench N.T.C. Nivel tope de concreto/Top level of concrete
A1
X= 958.00
Type
ensure that the piles are not subject to flotation.

Y= 1255.00

Y= 1295.00

Y= 1335.00

Y= 1391.50

Y= 1393.50

Y= 1449.00

Y= 1499.00

Y= 1556.50

Y= 1566.50
(0.80 m) Último/ Ultimate 36.71 N/A 10.90 12

7. La varilla de la pila que servirá para conectar a tierra la estructura será continua en toda la longitud de RG Registro/Cable Duct Manhole N.D.C. Nivel desplante de cimentación/Bottom level of foundation 1 2 3a 4 5a 5b 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

Material No Version Scale INDICADA Size A1


P-K02H Servicio/ Serviceability 28.20 N/A 0.22 1I 83I

la pila ó realizar empalmes solo con soldadura./The rod of the pile that will serve to ground the structure ESC Escaleras/Stairs N.P.T. Nivel de piso terminado/Elevation at finish
(0.80 m) Último/ Ultimate 36.20 N/A 0.36 will be continuous throughout the length of the pile or make overlaps only with welded . Sheet 001 No of Sheets 001
BE Banco eléctrico/Conduit Bank N.I.H. Nivel inferior de hueco/Bottom level of hole
Drwg. No. PLM-D: Revision
LC Losa de cimentación/Foundation Slab N. Nivel/Level ESC: INDICADA
N.S.A. Nivel superior de armado/Rebar top level N.C.S. Nivel concreto sano/Concrete level not contaminated 0 1.0 2.5 5 10 C.7WY0.WS.02.202- Z_ZPS001 00

You might also like