You are on page 1of 1

PEMBAYARAN KEMAJUAN KE-5 BAGI PEROLEHAN DUA UNIT FAST ASSAULT

CRAFT (KELAS PC) UNTUK KEGUNAAN PASUKAN POLIS MARIN, POLIS DIRAJA
MALAYSIA (PDRM) – NO. KONTRAK: KDN/PL/PDRM/16/2017

PENGGIRAAN NILAI PDI:

1. 3 X PRE DELIVERY INSPECTION (PDI) CONSIST OF MINIMIM 3 GOVERNMENT


PERSONAL EACH
= RM400,000.00

* 1 X PDI = RM400,000.00/3
* 1 PDI = RM133,333.34

2. PELARASAN NILAI PDI:

a. PDI MAIN ENGINES SELARAS SURAT MOF S/K.KEW/PK/KDN/OK/08 JLD.1


S.K 2(4)BTH 23 FEBRUARI 2018
1 X PDI = RM133,333.34
LULUS MOF = RM84,020.00
AMAUN PELARASAN/PENJIMATAN = RM133,333.34 – RM 84,020.00
= RM 49,313.34

b. PDI WATER JET PROPULSION SELARAS SURAT MOF


S/K.KEW/PK/KDN/OK/08 JLD.1 S.K 3(4)BTH 30 MAC 2018

1 X PDI = RM133,333.34
LULUS MOF = RM71,595.00
AMAUN PELARASAN/PENJIMATAN = RM133,333.34 – RM71,595.00
= RM 61,738.34

3. AMAUN YANG LAYAK DITUNTUT OLEH SYARIKAT

AMAUN DALAM KONTRAK : RM 2,000,000.00


AMAUN SELEPAS PELARASAN: (RM 49,313.34 +RM 61,738.34) = RM 111,051.68
AMAUN DALAM INVOIS SEBENAR: RM 2,000,000.00 – RM 111,051.68
= RM 1,888,948.32