ITEM DESCRIPTION
0 GENERAL REQUIREMENTS
1.0 Mobilization / Demobilization
2.0 Bonds and Insurances
2.1
2.2
2.3
3.0 Project Notebook
4.0 Safety and Security Requirements
5.0 Overhead Expenses / Contingencies / Miscellaneous
6.0 Mark-Up
GRAND TOTAL
12% VAT
TOTAL AMOUNT (12% VAT INCLUSIVE)
(INPUT DURATION)
OTE: KINDLY USE & FOLLOW THE FORMAT and SEPARATE MATERIAL COST / LABOR COST / MARK-UP.
DESCRIPTION
REQUIREMENTS
Mobilization / Demobilization
Bonds and Insurances
Performance Bond Covering the 30% of the total Contract Amount
Contractor's All Risk Insurance (CARI) covering the100% of the total Contract Amount
Surety Bond (Defect Guarantee Bond) covering the 10% of the total Project Cost.
Project Notebook
Safety and Security Requirements
Overhead Expenses / Contingencies / Miscellaneous
Mark-Up
ORM (1 UNIT)
50mm x 50mm x 3mmt SS Square Tube (Frame)
150mm x 3mmt SS Flat Bar (Toe Guard)
50mm x 50mm x 3mmt SS Angle Bar (Tread)
1-1/4 dia SS Round Tubing (Railing)
Adjustable Legs
4mm thk. SS Checkered Plate
Consumables
Labor Cost
OL CABINET (3 UNITS)
25mm x 25mm x 3mmt SS Square Tube (Frame)
3mmt SS Plate - Exterior & Partitions
SS Cabinet Knob
SS Padlock
Adjustable Legs
Consumables
Labor Cost
CT CHUTE (1 UNIT)
3mmt SS Plate
Consumables
Labor Cost
ABLE (1 UNIT)
3mmt SS Plate
50mm x 50mm x 3mmt SS Square Tube
Adjustable Legs
Consumables
Labor Cost
R STAIR (1 UNIT)
220mm x 20mmt MS Flat Bar (Stringer)
120mm x 3mmt MS Flat Bar (Toe Guard)
35mm x 35mm MS Square Tube
35mm dia MS Round Tube
25mm dia MS Round Tube
4mm thk. SS Checkered Plate
Ajustable Legs
Painting Works (Same as Existing)
Consumables
Labor Cost
FOUNTAIN (1 UNIT)
SS Drinking Fountain w/ Electric Water Cooler
25mm dia SS Pipe (Piping System)
Electrical Cables
Consumables
Labor Cost
H CART (3 UNITS)
2 Tray Utility Tool Service Push Cart
STOPPER (3 UNITS)
160mm x 160mm x 13mmt MS WF Steel Beam
590mm x 160mm x 15mmt MS Base Plate
120mm x 120mm x 10mmt MS Angle Bar
18mm dia Chemical Bolt
Consumables
Labor Cost
AT INCLUSIVE)
(INPUT DURATION)
LABOR COST / MARK-UP. (BY KOF PROCUREMENT)
lot 1.00
lot 1.00
lot 1.00
lot 1.00
sets 3.00
lot 1.00
lot 1.00
lot 1.00
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
sets 6.00
Sub-Total
: # OF CALENDAR DAYS
DATE: 7-Jul-17
FOR INQUIRY:
CLIENT: COKE MEYCAUAYAN
Project :
Location : Brgy. Mansilingan, Bacolod City
Plant / DC : Bacolod Plant
Subject : Cost Breakdown
ITEM DESCRIPTION
A GENERAL REQUIREMENTS
1.0 Mobilization / Demobilization
2.0 Bonds and Insurances
2.1
2.2
2.3
3.0 Project Notebook
4.0 Safety and Security Requirements
5.0 Miscellaneous
6.0 Overhead & Contingencies
F WARMER PLATFORM
1.0 50mm x 50mm x 3mmt SS Square Tube - Framing
2.0 50mm x 50mm x 3mmt SS Angle Bar - Tread
3.0 Adjustable Legs
4.0 FRP Grating
5.0 Consumables
H FBI PLATFORM
1.0 50mm x 50mm x 3mmt SS Square Tube - Framing
2.0 150mm x 3mmt SS Flat Bar - Toe Guard
3.0 50mm x 50mm x 3mmt SS Angle Bar - Tread
4.0 1-1/4 dia SS Round Tubing - Railing
5.0 Adjustable Legs
6.0 FRP Grating
7.0 Consumables
I FORKLIFT STOPPER
1.0 160mm x 160mm x 13mmt MS WF Steel Beam
2.0 590mm x 160mm x 15mmt MS Base Plate
3.0 120mm x 120mm x 10mmt MS Angle Bar
4.0 18mm dia Chemical Bolt
5.0 Consumables
K SERVICE TABLE
1.0 3mmt SS Plate
2.0 50mm x 50mm x 3mmt SS Square Tube
3.0 Adjustable Legs
4.0 Table Vise
5.0 Consumables
P CONNECTING PLATFORM
1.0 50mm x 50mm x 3mmt SS Square Tube - Framing
2.0 150mm x 3mmt SS Flat Bar - Toe Guard
3.0 50mm x 50mm x 3mmt SS Angle Bar - Tread
4.0 1-1/4 dia SS Round Tubing - Railing
5.0 Adjustable Legs
6.0 FRP Grating
7.0 Consumables
Q STAIR RELOCATION
1.0 Dismantling / Relocation / Installation of Stair
2.0 Consumables
GRAND TOTAL
12% VAT
TOTAL AMOUNT (12% VAT INCLUSIVE)
NOTE: KINDLY USE & FOLLOW THE FORMAT and SEPARATE LABOR COST FROM MATERIAL COST
DESCRIPTION
REQUIREMENTS
Mobilization / Demobilization
Bonds and Insurances
Performance Bond Covering the 30% of the total Contract Amount
Contractor's All Risk Insurance (CARI) covering the100% of the total Contract Amount
Surety Bond (Defect Guarantee Bond) covering the 10% of the total Project Cost.
Project Notebook
Safety and Security Requirements
Miscellaneous
Overhead & Contingencies
NVEYOR PLATFORM
50mm x 50mm x 3mmt SS Square Tube - Framing
150mm x 3mmt SS Flat Bar - Toe Guard
50mm x 50mm x 3mmt SS Angle Bar - Tread
1-1/4 dia SS Round Tubing - Railing
Adjustable Legs
FRP Grating
Consumables
UTFEED PLATFORM
50mm x 50mm x 3mmt SS Square Tube - Framing
150mm x 3mmt SS Flat Bar - Toe Guard
50mm x 50mm x 3mmt SS Angle Bar - Tread
1-1/4 dia SS Round Tubing - Railing
Adjustable Legs
FRP Grating
Consumables
PLATFORM
50mm x 50mm x 3mmt SS Square Tube - Framing
50mm x 50mm x 3mmt SS Angle Bar - Tread
Adjustable Legs
FRP Grating
Consumables
NVEYOR PLATFORM
50mm x 50mm x 3mmt SS Square Tube - Framing
150mm x 3mmt SS Flat Bar - Toe Guard
50mm x 50mm x 3mmt SS Angle Bar - Tread
1-1/4 dia SS Round Tubing - Railing
Adjustable Legs
FRP Grating
Consumables
3mmt SS Plate
50mm x 50mm x 3mmt SS Square Tube
Adjustable Legs
Consumables
SS Cabinet Knob
SS Padlock
100mm dia Swivel Caster Wheel
100mm dia Steady Caster Wheel
Consumables
NG PLATFORM
50mm x 50mm x 3mmt SS Square Tube - Framing
150mm x 3mmt SS Flat Bar - Toe Guard
50mm x 50mm x 3mmt SS Angle Bar - Tread
1-1/4 dia SS Round Tubing - Railing
Adjustable Legs
FRP Grating
Consumables
AT INCLUSIVE)
R COST FROM MATERIAL COST
lot 1.00
lot 1.00
lot 1.00
lot 1.00
sets 3.00
lot 1.00
lot 1.00
lot 1.00
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total
Sub-Total