You are on page 1of 9

2015-12-28 Huawei Technologies, at your service Page 7 of 14

Guangdong Mobile GPON project and Configuration Guide

Public

step 1: confirm the board;


>>User name:root >>User password:admin MA5680T>enable MA5680T#config
MA5680T(config)sysname HC_QQT_MA5680T_1 //This command names the MA5680T.
The specific name is named according to the actual situation and
standard. HC_QQT_MA5680T_1 (config) board confirm 0 // board confirmation

Step 2: Isolation Layer cancel ETHB


HC_QQT_MA5680T_1 (config) #undo isolate board ( config) #undo isolate board 0/12
0/11 HC_QQT_MA5680T_1

Step 3: Set the operating mode of the network Upstream;


HC_QQT_MA5680T_1(config)#interface eth 0/11 HC_QQT_MA5680T_1(config-if-eth-
0/11)# network-role uplink HC_QQT_MA5680T_1(config-if-eth-0/11)#quit
HC_QQT_MA5680T_1(config)#interface eth 0/12 HC_QQT_MA5680T_1 (config-if-eth -
0/12) # network-role uplink HC_QQT_MA5680T_1 (config-if-eth-0/12) #quit

step 4: binding ETHB upstream traffic plate


HC_QQT_MA5680T_1 (config) #bind board 0/11 0/12 // Bind the 11 slots to the 12 slots.

Step 5: Set cross-board link protection;


//Set cross-board link protection HC_QQT_MA5680T_1(config)#protect
HC_QQT_MA5680T_1(config-protect)#protect-group first 0/11/0 second 0/12/0 eth
workmode timedelay enable HC_QQT_MA5680T_1(config-protect)#quit
______________________________________________________________________________________ -12-28
Huawei Technologies, Serving You Page 8 of 14

Guangdong Mobile GPON Project Configuration Guide

Public

Step 6: Create VLAN and Join Upstream Port


_ _ _ _ _ The plan will prevail. ______________________________ This operation will also
perform unified processing on the remaining aggregate or protection ports not included
in the port list. HC_QQT_MA5680T_1(config)#interface vlanif 10
HC_QQT_MA5680T_1(config-if-vlanif10)# ip address 4.4.4.2 255.255.255.0
HC_QQT_MA5680T_1(config-if- Vlanif10)#quit HC_QQT_MA5680T_1(config)# ip route-
static 0.0.0.0 0.0.0.0 4.4.4.1 //The IP address and route are added according to the actual
situation.

Step 7: Configure the DBA template


HC_QQT_MA5680T_1(config)# dba-profile add profile-id 16 type2 assure 102400 //Add
10M DBA bandwidth template

Step 8: Configure the line template


__________________________________________________________________ -gpon-lineprofile-
10)#gem add 0 eth tcont 1 cascade on //Add GEM port, GEM port 0 for network
management HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem mapping 0 0 vlan
10 //Set mapping //The following three lines are used to create the service channel:
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#tcont 2 dba-profile-id 10
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem add 1 eth tcont 2 cascade on
HC_QQT_MA5680T_1 (config-gpon-lineprofile-10)#gem add 2 eth tcont 2 cascade on
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem add 3 eth tcont 2 cascade on
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem add 4 eth tcont 2 cascade on
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem add 5 eth tcont 2 cascade
onHC_QQT_MA5680T_1 (config-gpon-lineprofile-10) #gem add 6 eth tcont 2 cascade on
_____________________________________________________________________________________________
2015-12-28 Huawei Technologies, Service for You Page 9 of 14

Guangdong Mobile GPON Project Configuration Guide

Open

/ / GEM index allocation for each ONU under the same PON board See the attached
table "GEM index allocation table.

Xls ", GEM index allocation table.xls

_________________________________________ Config-gpon-lineprofile-10)#gem
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem HC_QQT_MA5680T_1(config-
gpon-lineprofile-10)#gem HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem
HC_QQT_MA5680T_1(config- Gpon-lineprofile-10)#gem HC_QQT_MA5680T_1(config-
gpon-lineprofile-10)#gem HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem HC_QQT_MA5680T_1(config-
gpon- Lineprofile-10)#gem HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem HC_QQT_MA5680T_1(config-
gpon-lineprofile-10)#gem HC_QQT_MA5680T_1(config-gpon-lineprofile-
10)#gem_________________________________________ Config-gpon-lineprofile-10)#gem
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#gem HC_QQT_MA5680T_1(config-
gpon-lineprofile-10)#gem
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping Mapping
Mapping Mapping Mapping Mapping Mapping Mapping

. 1. 1. 1. 1. 1. 1. 1. 1 2 2 2 2 2 2 2 2. 3. 3. 3. 3. 3. 3. 3. 3

0. 1 2 3 4 5 6 7 0 1 2 3 4 5 6 7 0 1 2 3 4 5 6 7

vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan vlan
vlan vlan vlan vlan vlan vlan

1000 1001 1002 1003 1004 1005 1006 1007 1008 1009 1010 1011 1012 1013 1014 1015
1016 1017 1018 1019 1020 1021 1022 1023

//CVLAN corresponding to each ONU under the same PON board See attached table
"CVLAN allocation table.xls", combined with "GEM" for gem mapping The index
allocation table .xls is taken, and the actual opening is added according to the
situation. HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#commit
HC_QQT_MA5680T_1(config-gpon-lineprofile-10)#quit

Step 9: Configure the service template


You can use the snmp mode to register without configuring a service template. The
MA5620G does not.

__________________________________________________________________________________________
2015-12-28 Huawei Technologies, Service for You Page 10 of 14
Guangdong Mobile GPON Project Configuration Guide

Public

Step 10: Add ONT and set its management IP


HC_QQT_MA5680T_1 (config) #interface gpon 0/1 // open 0 ONT automatic discovery
function HC_QQT_MA5680T_1 port (config-if-gpon-0/1) #port 0 ont-auto-find enable
HC_QQT_MA5680T_1 (config-if-gpon-0 / 1) #display ont autofind 0 Command: display
ont autofind 0 ------------------------------------ -----------------------------------Number
F/ S/ P SN Password ------- -------------------------------------------------- --------------1
0/ 1/ 0 323031311FF49F42 ----------------------------- --------------------------------------
----//The SN code "323031311FF49F42" Used when adding an ONT in the next
step. _____________________________________________________________________________ After the
command is issued, a vlan will be created on the ont and the vlan interface will be
added. Priority is set to 0. HC_QQT_MA5680T_1(config-if-gpon-0/1)#ont ipconfig 0 0
static ip-address 4.4.5.3 mask 255.255.255.0 gateway 4.4.5.

Step 11: Add the service virtual port of the vlan


__________________________________ 1000 rx-cttr 6 tx-cttr 6
HC_QQT_MA5680T_1(config)service-port vlan 1000 gpon multi-service user-vlan 1001
rx-cttr 6 tx-cttr 6 HC_QQT_MA5680T_1(config)service-port vlan 1000 gpon multi-service
user-vlan 1002 rx-cttr 6 tx-cttr 6 _ _ _ _ _ 1004 rx-cttr 6 tx-cttr 6
HC_QQT_MA5680T_1(config)service-port vlan 1000 gpon multi-service user-vlan 1005
rx-cttr 6 tx-cttr 6 HC_QQT_MA5680T_1(config)service-port vlan 1000 gpon multi-service
user-vlan 1006 rx-cttr 6 tx-cttr 6 HC_QQT_MA5680T_1(config)service-port vlan1000
gpon multi-service user-vlan 1007 rx-cttr 6 tx-cttr 6 0/1/0 ont 0 gemport 0

0/1/0 ont 0 gemport 1 0/1/0 ont 0 gemport 1 0/1/0 ont 0 gemport 1 0/1/0 ont 0
gemport 1 0/1/0 ont 0 gemport 1 0/1/0 Ont 0 gemport 1 0/1/0 ont 0 gemport 1 0/1/0
ont 0 gemport 1

______________________________________________________________________________________ 2015-
12-28 Huawei Technologies, for your service Page 11 of 14

Guangdong Mobile GPON Project Configuration Guide

Open

_ _ _ _ _ _ _ Cttr HC_QQT_MA5680T_1(config)service-port multi-service user-vlan 1011 rx-


cttr HC_QQT_MA5680T_1(config)service-port multi-service user-vlan 1012 rx-cttr
HC_QQT_MA5680T_1(config)service-port multi-service user-vlan 1013 rx -cttr _ _ _ _ _
Rx-cttr _ _ _ _ _Multi-service user-vlan 1019 rx-cttr HC_QQT_MA5680T_1(config)service-
port multi-service user-vlan 1020 rx-cttr HC_QQT_MA5680T_1(config)service-port multi-
service user-vlan 1021 rx-cttr HC_QQT_MA5680T_1(config)service- Port multi-service
user-vlan 1022 rx-cttr HC_QQT_MA5680T_1(config)service-port multi-service user-vlan
1023 rx-cttr

Vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan
1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000
6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-
cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6 vlan 1000 6 tx-cttr 6

gpon 0/1/0 ont 0 gemport 2 gpon 0/1/0 ont 0 gemport 2 gpon 0/1/0 ont 0 gemport 2
gpon 0/1/0 ont 0 Gemport 2 gpon 0/1/0 ont 0 gemport 2 gpon 0/1/0 ont 0 gemport 2
gpon 0/1/0 ont 0 gemport 2 gpon 0/1/0 ont 0 gemport 2 gpon 0/1/0 ont 0 Gemport 3
gpon 0/1/0 ont 0 gemport 3 gpon 0/1/0 ont 0 gemport 3 gpon 0/1/0 ont 0 gemport 3
gpon 0/1/0 ont 0 gemport 3 gpon 0/1/0 ont 0 Gemport 3 gpon 0/1/0 ont 0 gemport 3
gpon 0/1/0 ont 0 gemport 3
// This is the virtual port of the service service. The service virtual port of ONU 0 is added
here. This is the user-vlan and CVLAN. It is the same as the CVLAN in step 8. It needs to
be added according to the actual situation when starting the deployment.

_____________________________________________________________________________________________
2015-12-28 Huawei Technologies, Service for You Page 12 of 14

Guangdong Mobile GPON Project Configuration Guide

Public

Step 12: Log in to MA5620G for configuration

HC_QQT_MA5680T_1(config)#telnet 4.4.5.3 //User name is root, The password is


mduadmin MA5620G(config)#vlan 1000 to 1023 //Create the service vlan 1000. You
need to create a VLAN for each port in the actual deployment. The same PON board is
created from 1000, which is the same as the CVLAN in step 8. Simply add the VLAN
corresponding to the ONU. MA5620G(config)#port vlan 1000 to 1023 0/0 1 //Add the
uplink port of vlan. You need to add an uplink port for each VLAN when you start the
deployment. MA5620G(config)#undo service-port all
MA5620G(config)#service-port vlan 1000 eth 0/1/1 user-vlan untagged rx-cttr 6 tx-cttr 6
MA5620G(config)#service-port vlan 1001 eth 0/1/1 user-vlan untagged rx- Cttr 6 tx-cttr
6 MA5620G(config)#service-port vlan 1002 eth 0/1/1 user-vlan untagged rx-cttr 6 tx-cttr
6 MA5620G(config)#service-port vlan 1003 eth 0/1/1 User-vlan untagged rx-cttr 6 tx-cttr
6 MA5620G(config)#service-port vlan 1004 eth 0/1/1 user-vlan untagged rx-cttr 6 tx-cttr
6 MA5620G(config)#service-port vlan 1005 Eth 0/1/1 user-vlan untagged rx-cttr 6 tx-cttr
6 MA5620G(config)#service-port vlan 1006 eth 0/1/1 user-vlan untagged rx-cttr 6 tx-cttr
6 MA5620G(config) #service-port vlan 1007 eth 0/1/1 user-vlan untagged rx-cttr 6 tx-
cttr 6 MA5620G(config)#service-port vlan 1008 eth 0/1/1 user-vlan untagged rx-cttr 6
tx- Cttr 6 MA5620G(config)#service-port vlan 1009 eth 0/1/1 user-vlan untaggedRx-cttr
6 tx-cttr 6 MA5620G(config)#service-port vlan 1010 eth 0/1/1 user-vlan untagged rx-cttr
6 tx-cttr 6 MA5620G(config)#service-port vlan 1011 eth 0/1 /1 user-vlan untagged rx-
cttr 6 tx-cttr 6 MA5620G(config)#service-port vlan 1012 eth 0/1/1 user-vlan untagged
rx-cttr 6 tx-cttr 6 MA5620G(config)#service-port Vlan 1013 eth 0/1/1 user-vlan untagged
rx-cttr 6 tx-cttr 6 MA5620G(config)#service-port vlan 1014 eth 0/1/1 user-vlan untagged
rx-cttr 6 tx-cttr 6 MA5620G( Config)#service-port vlan 1015 eth 0/1/1 user-vlan
untagged rx-cttr 6 tx-cttr 6 MA5620G(config)#service-port vlan 1016 eth 0/1/1 user-vlan
untagged rx-cttr 6 Tx-cttr 6 MA5620G(config)#service-port vlan 1017 eth 0/1/1 user-
vlan untagged rx-cttr 6 tx-cttr 6 MA5620G(config)#service-port vlan 1019 eth 0/1/1
user- Vlan untagged rx-cttr 6 tx-cttr 6 MA5620G(config)#service-port vlan 1020 eth0/1/1
user-vlan untagged rx-cttr 6 tx-cttr 6 MA5620G(config)#service-port vlan 1021 eth 0/1/1
user-vlan untagged rx-cttr 6 tx-cttr 6
_____________________________________________________________________________________________
2015-12-28 Huawei Technologies, Service for You Page 13 of 14

Guangdong Mobile GPON Project Configuration Guide

Open

MA5620G(config)#service-port vlan 1022 eth 0/1/1 user-vlan untagged rx-cttr 6 tx-cttr 6


MA5620G(config)#service-port vlan 1023 eth 0/1/1 user-vlan untagged rx-cttr 6 tx-cttr
6

//Add the service port of vlan, you need to add one for each port when you start
the server. Service virtual port. The ONU CVLAN on the same PON board starts from
1000 and is the same as the CVLAN in step 8. In the deployment, you only need to add
the service virtual port of the ONU. MA5620G(config)#save MA5620G(config)#quit
Step 13: Save the data
Example: HC_QQT_MA5680T_1(config)#save

IV. Service Verification


According to the “Engineering of China Mobile Guangdong Broadband Access
Engineering Acceptance Specification-1116.doc” Test the chapter project for business
verification. The items involved in the engineering test are as follows: Large project
PON basic function test

sub-project
optical power test ONU registered power supply active/standby switching uplink
protection

device protection performance test

uplink protection plug-in PON board service recovery test equipment restart service
recovery test

Network management function test

configuration management function

You might also like