GOVERNMENT OF ANDHRA PRADESH

ABSTRACT

I&CAD Deptt. – Industrial Water Supply – Redistribution of water allocation


to M/s.Samalkot Power Limited from M/s.Reliance Infrastructure Limited –
Orders – Issued.
-------------------------------------------------------------------------------------
IRRIGATION AND CAD (REFORMS) DEPARTMENT

G.O.RT.No. 21. Dated:13-01-2015.

Read the following:-

1) G.O.Ms.No.140, I&CAD(IRRIGATION.I-2) Deptt., dt:20.09.1997.


2) G.O.Ms.No.30, I&CAD(PW:Reforms) Deptt., dated:30.03.2010.
3) From the Director, M/s.Reliance Infrastructure Limited, Letters
dated:22.09.2011.
4) From the E.N.C.(Irr.), Hyd., Lr.No.ENC(I)/DCE.IV/OT.GDS/AE12/
Samalkot Power Ltd/2011, dated:29-06-2012.
>><<
ORDER:

In the reference 1st read above, permission was accorded for drawl of
water 9.00 cusecs to M/s.SEW Constructions Limited which was
subsequently changed to various firms, finally amalgamated to
M/s.Samalkot Power Limited.

2. In the reference 2nd read above, permission was accorded for drawl of
additional 20 Cusecs of water from river Godavari by M/s.Reliance Energy
Limited, subsequently renamed as M/s.Reliance Infrastructure Limited.

3. Based on the representation of the firm vide reference 3rd read above,
the Engineer-in-Chief(Irrigation), Hyderabad in the reference 4th read above
has informed the Government that total water requirement for M/s.
Samalkot Power Limited (2X1200 MW Power Plant) is 26.20 Cusecs. The
firm M/s. Samalkot Power Limited vide reference 2nd read above, has been
permitted to draw 20 cusecs of water from River Godavari, Upstream side of
S.A.C. Barrage and now the firm M/s. Samalkot Power Limited is requesting
to redistribute 9 Cusecs of water already allocated to their Group Company
M/s. Reliance Infrastructure Limited (previously M/s. Snehalatha Power Ltd)
as given below:-
i) M/s. Reliance Infrastructure Ltd. : 2.80 Cusecs
(220 MW Power Plant)

ii) M/s. Samalkot Power Limited : 6.20 Cusecs


(2x1200 MW Power Plant)
------------------
Total : 9.00 Cusecs
------------------

4. Government after careful examination, hereby accepted the proposal


of Engineer-in-Chief(Irrigation), Hyderabad as indicated in Para-3 above.
After the above redistribution is made, the quantity of water to
M/s.Samalkot Power Limited is 26.20 cusecs as against the original sanction
of 20 cusecs vide reference 2nd read above duly reducing the quantity of
water to M/s. Reliance Infrastructure Limited is 2.80 cusecs as against the
original sanction of 9 cusecs vide reference 1st read above.

P.T.O.,
:: 2 ::

5. The Engineer-in-Chief(Irrigation), Hyderabad shall take necessary


further action in the matter, accordingly.

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHRA PRADESH)

ADITYA NATH DAS,


PRINCIPAL SECRETARY TO GOVERNMENT.
To
The Engineer-in-Chief(Irrigation), I&CAD Department,
Jalasouda Buildings, Errum Munzil, Hyderabad.
The Superintending Engineer, Irrigation Circle,Dowlaiswaram, E.G.Dist.
The District Collector, East Godavari District, Kakinada.
Copy to:
The P.S. to Minister (ICAD & WRM).
M/s.Reliance Infrastructures Limited, Samalkot Power Station, Camus Capri
Apartments, 6-3-1090/A, Rajbhavan Road, Somajiguda, Hyd. – 500082.
M/s.Samalkot Power Limited, IDA Peddapuram, East Godavari District,
A.P. - 533440
SF/SC.

//FORWARDED :: BY ORDER//

SECTION OFFICER.