Data :

No. Urut Absen = 49


L1 =4m
L2 =6m
L3 =6m
H =5m
fc’ = 25 MPa
fy = 240 MPa
q = 250 kg/m²
Tebal Plat = 10 cm
Dimensi Kolom = 40 x 40 cm
Dimensi Balok Induk = 45 x 40 cm
Dimensi Balok Anak = 45 x 40 cm

PERENCANAAN PLAT LANTAI

300

600

300

400 600

1000

1
Plat Type A

1. L teoritis : lx = 300 cm ly = 400 cm


ly 400
Koefisien momen = = 1,33
lx 300
2. Tebal Plat = 10 cm
3. Beban yang bekerja
Beban Mati (WD)
 Berat sendiri plat (0,1 x 24 ) = 2,4 kN/m²
 Beban q = 2,5 kN/m²
4,9 kN/m²
Beban Hidup (WL) = 2 kN/m²
WU = 1,2 WD + 1,6 WL
= 1,2 (4,9) + 1,6 (2)
= 9,08 kN/m²
4. Momen yang terjadi :
Mlx = 0,001. Wu. lx². x
= 0,001. 9,08. 3². 37
= 3,02 kNm
Mly = 0,001. Wu. lx². x
= 0,001. 9,08. 3². 27
= 2,206 kNm
Mtx = 0,001. Wu. lx². x
= 0,001. 9,08. 3². (-76)
= -6,21 kNm
Mty = 0,001. Wu. lx². x
= 0,001. 9,08. 3². (-65)
= -5,311 kNm
1
Mtiy = . Mlx
2
1
= . 3,02
2
= 1,51 kNm

2
5. Penulangan :
Tinggi Pelt (d) = 100 mm
Selimut Beton = 20 mm
Ø Tulangan = 10 mm

1
dx = h – p – 2Ø = 100 – 20 – ½ . 10 = 75 mm = 0,075 m
1
dy = h – p – Ø – 2Ø = 100 – 20 – 10 – ½ . 10 = 65 mm = 0,065 m

 Penulangan lapangan arah X


Mlx = 3,02 kNm
Mu 3,02
Mulx = = = 536,412 kN/m²
b.dx² 1.0,075²
536,412−500
ρmin = 0,0027+ (0,0032-0,0027)
600−500

=0,00288
ρinterpolasi = 0,00288 > → ρmin = 0,00281
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00288
Aslx = ρ x b x dx
= 0,00288 x 1000 x 75 = 216 mm²
Dipilih tulangan Ø 8 – 200 As = 251 mm²

 Penulangan lapangan arah Y


Mly = 2,206 kNm
Mu 2,206
Muly = = = 521,513 kN/m²
b.dy² 1.0,065²
521,513−500
ρmin = 0,0027+ (0,0032-0,0027)
600−500

= 0,00281
ρinterpolasi = 0,00281 > → ρmin = 0,00281

3
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00281
Asly = ρ x b x dy
= 0,00281 x 1000 x 65 = 182,65 mm²
Dipilih tulangan Ø 8 – 250 As = 201 mm²

 Penulangan tumpuan arah X


Mtx = 6,21 kNm
Mu 6,21
Mutx = = = 1103,20 kN/m²
b.dx² 1.0,075²
1103,20−1100
ρmin = 0,0060+ (0,0066-0,0060)
1200−1100

= 0,00602
ρinterpolasi = 0,00602 > → ρmin = 0,00281
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00602
Astx = ρ x b x dx
= 0,00602 x 1000 x 75 = 451,5 mm²
Dipilih tulangan Ø 12 – 225 As = 503 mm²

 Penulangan tumpuan arah Y


Mty = 5,311 kNm
Mu 5,311
Muty = = = 1255,56 kN/m²
b.dy² 1.0,065²
1255,56−1300
ρmin = 0,0071+ (0,0077-0,0071)
1400−1300

= 0,00683
ρinterpolasi = 0,00683 > → ρmin = 0,00281
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00683
Asty = ρ x b x dy
= 0,00683 x 1000 x 65 = 443,95 mm²
Dipilih tulangan Ø 12 – 225 As = 503 mm²

4
 Penulangan jepit arah y
Mtiy = 1,51 kNm
Mu 1,15
Mutiy = = = 356,100 kN/m²
b.dy² 1.0,065²
356,100−300
ρmin = 0,0016+ (0,0021-0,0016)
400−300

= 0,00188
ρinterpolasi = 0,00188 < → ρmin = 0,00281
→ ρmax = 0,0302
→ maka dipakai ρmin = 0,00281
Astiy =ρxbxd
= 0,00281 x 1000 x 65 = 182,65 mm²
Dipilih tulangan Ø 8 – 250 As = 201 mm²
 Rekap tulangan
Aslx = Ø 8 – 200 (251 mm²) alternatif lain → Ø 8 – 250 (201 mm²)
Asly = Ø 8 – 250 (201 mm²) alternatif lain → Ø 8 – 250 (201 mm²)
Astx = Ø 12 – 225 (503 mm²) alternatif lain → Ø 12 – 225 (503 mm²)
Asty = Ø 12 – 225 (503 mm²) alternatif lain → Ø 12 – 225 (503 mm²)
Astiy = Ø 8 – 250 (201 mm²) alternatif lain → Ø 8 – 250 (201 mm²)

300

600

300

400

5
Plat Type B

1. L teoritis : lx = 300 cm ly = 600 cm


ly 600
Koefisien momen = = 2,00
lx 300
2. Tebal Plat = 10 cm
3. Beban yang bekerja
Beban Mati (WD)
 Berat sendiri plat (0,1 x 24 ) = 2,4 kN/m²
 Beban q = 2,5 kN/m²
4,9 kN/m²
Beban Hidup (WL) = 2 kN/m²
WU = 1,2 WD + 1,6 WL
= 1,2 (4,9) + 1,6 (2)
= 9,08 kN/m²
4. Momen yang terjadi :
Mlx = 0,001. Wu. lx². x
= 0,001. 9,08. 3². 55
= 4,49 kNm
Mly = 0,001. Wu. lx². x
= 0,001. 9,08. 3². 28
= 2,29 kNm
Mtx = 0,001. Wu. lx². x
= 0,001. 9,08. 3². (-104)
= -8,50 kNm
Mty = 0,001. Wu. lx². x
= 0,001. 9,08. 3². (-67)
= -5,475 kNm
1
Mtiy = . Mlx
2
1
= . 4,49
2
= 2,245 kNm

6
5. Penulangan :
Tinggi Pelt (d) = 100 mm
Selimut Beton = 20 mm
Ø Tulangan = 10 mm

1
dx = h – p – 2Ø = 100 – 20 – 5 = 75 mm = 0,075 m
1
dy = h – p – Ø – 2Ø = 100 – 20 – 10 – 5 = 65 mm = 0,065 m

 Penulangan lapangan arah X


Mlx = 4,49 kNm
Mu 4,49
Mulx = = = 797,513 kN/m²
b.dx² 1.0,075²
797,513−800
ρmin = 0,0043+ (0,0049-0,0043)
900−800

=0,00429
ρinterpolasi = 0,00429 > → ρmin = 0,00281
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00429
Aslx = ρ x b x dx
= 0,00429 x 1000 x 75 = 321,75 mm²
Dipilih tulangan Ø 10 – 225 As = 349 mm²

 Penulangan lapangan arah Y


Mly = 2,29 kNm
Mu 2,29
Muly = = = 541,371 kN/m²
b.dy² 1.0,065²
541,371−500
ρmin = 0,0027+ (0,0032-0,0027)
600−500

= 0,00291
ρinterpolasi = 0,00291 > → ρmin = 0,00281

7
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00291
Asly = ρ x b x dy
= 0,00291 x 1000 x 65 = 189,15 mm²
Dipilih tulangan Ø 8 – 250 As = 201 mm²

 Penulangan tumpuan arah X


Mtx = 8,50 kNm
Mu 8,50
Mutx = = = 1509,77 kN/m²
b.dx² 1.0,075²
1509,77−1600
ρmin = 0,0089+ (0,0095-0,0089)
1700−1600

= 0,00836
ρinterpolasi = 0,00836 > → ρmin = 0,00281
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00836
Astx = ρ x b x dx
= 0,00836 x 1000 x 75 = 627 mm²
Dipilih tulangan Ø 12 – 150 As = 754 mm²

 Penulangan tumpuan arah Y


Mty = 5,475 kNm
Mu 5,475
Muty = = = 1294,326 kN/m²
b.dy² 1.0,065²
1294,326−1300
ρmin = 0,0071+ (0,0077-0,0071)
1400−1300

= 0,00707
ρinterpolasi = 0,00707 > → ρmin = 0,00281
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00707
Asty =ρxbxd
= 0,00707 x 1000 x 65 = 459,55 mm²
Dipilih tulangan Ø 12 – 225 As = 503 mm²

8
 Penulangan jepit arah y
Mtiy = 2,245 kNm
Mu 2,245
Mutiy = = = 530,732 kN/m²
b.dy² 1.0,065²
530,732−500
ρmin = 0,0027+ (0,0032-0,0027)
600−500

= 0,00285
ρinterpolasi = 0,00285 > → ρmin = 0,00281
→ ρmax = 0,0302
→ maka dipakai ρinterpolasi = 0,00285
Astiy =ρxbxd
= 0,00285 x 1000 x 65 = 185,25 mm²
Dipilih tulangan Ø 8 – 250 As = 201 mm²

 Rekap tulangan
Aslx = Ø 10 – 225 (349 mm²) alternatif lain → Ø 10 – 225 (349 mm²)
Asly = Ø 8 – 250 (201 mm²) alternatif lain → Ø 8– 250 (349 mm²)
Astx = Ø 12 – 150 (754 mm²) alternatif lain → Ø 12 – 150 (754 mm²)
Asty = Ø 12 – 225 (503 mm²) alternatif lain → Ø 12 – 225 (503 mm²)
Astiy = Ø 8 – 250 (201 mm²) alternatif lain → Ø 8 – 250 (201 mm²)

300

600

300

600

9
PERENCANAAN BALOK

1. Balok Induk

 Dimensi rencana = 40/40


 Berat sendiri Plat
W = 9,68 kN/m²
Beban terbagi plat (segitiga) + plat (segitiga)
1 1
q ekuivalen segitiga = 3. Wu. lx = 2x(3. 9,08. 3) = 18,142 kN/m

 Berat sendiri balok = 0,45. 0,35. 24 = 3,78 kN/m


qDL = 21,922 kN/m

 Beban fungsi lantai (q LL )


1
q ekuivalen segitiga = 2( 3. 2. 3) = 4 kN/m

qLL = 4 kN/m

 q balok AB =1,2 WD +1,6 WL


= 1,2 (21,922) +1,6 (4)
= 32,706 kN/m

 Menghitung Momen

1
MtAB = 16 . Wu . l²
1
= 16 . 32,706. 3²

= 18,40 kNm
1
MlAB = 14 . Wu . l²
1
= 14 . 32,706. 3²

= 21,026 kNm

10
1
MtBA = 10 . Wu . L²
1
= 10 . 32,706. 3²

= 29,435 kNm
 Perhitungan Tulangan
 Tinggi balok (h) = 450 mm
 Lebar balok (b) = 400 mm
 penutup beton (p) = 25 mm
 Ø tulangan utama = Ø 16
 Ø sengkang =Ø8
 fc = 25 MPa ; fy = 240 MPa

Penentuan tinggi efektif


1
d = h – p – Ø sengkang – 2Ø tul. utama

= 450 – 25 – 8 – 8
= 409 mm

 MtAB = 19,219 kNm


Mu 18,40
k= = = 550,90 kN/m
b.d² 0,2.0,409²
0.0032−0.0027
ρinterpolasi = 0,0027+( ) x (550,90 – 500)
600−500
= 0,00295

ρmin = 0,00281
ρmax = 0,0302
→ Maka dipakai ρinterpolasi = 0,00295

Ast = ρ. b. d.
= 0,00295. 200. 409
= 241,31 mm²
Dipakai tulangan 2 Ø 14 (Asti = 308 mm²)

11
 MlAB = 21,026 kNm
Mu 21,026
k= = = 629,521 kN/m²
b.d² 0,2x0,409²
0,0037−0,0032
ρinterpolasi = 0,0032 +( ) x (629,521 – 600)
700−600
= 0,00335

ρmin = 0,00281
ρmax = 0,0302
→ Maka dipakai ρinterpolasi = 0,00335

Asl = ρ. b. d.
= 0,00335. 200. 409
= 274,03 mm²
Dipakai tulangan 2 Ø 14 (Asl = 308 mm²)
 MtBA = 29,435 kNm
Mu 29,435
k= = = 881,28 kN/m²
b.d² 0,2.0,409²
0,0054−0,0049
ρinterpolasi = 0,0049 +( ) x (881,28– 900)
1000−900
= 0,00481

ρmin = 0,00281
ρmax = 0,0302
→ Maka dipakai ρinterpolasi = 0,00481

Asti = ρ. b. d.
= 0,00481. 200. 409
= 393,458 mm²
Dipakai tulangan 3 Ø 14 (Asti = 462 mm²)

12
40 40 40

2. Balok Anak

 Dimensi rencana = 45/40


 Berat sendiri Plat
W = 9,08 kN/m²
Beban terbagi plat (segitiga) + plat (segitiga)
1 lx 1 3
q ekuivalen trapesium = 6. Wu. lx. (3 – ( )² ) = 6. 9,08. 3. (3 – ( )² )= 11,985 kN/m
ly 5

1 lx 1 3
q ekuivalen trapesium = 6. Wu. lx. (3 – ( )² ) = 6. 9,08. 3. (3 – ( )² )= 11,985 kN/m
ly 5

 Berat sendiri balok = 0,45. 0,35. 24 = 3,78 kN/m


qDL = 27,75 kN/m

 Beban fungsi lantai (q LL )


1
q ekuivalen segitiga = 2( 3. 2. 3) = 4 kN/m

qLL = 4 kN/m

 q balok AB =1,2 WD +1,6 WL


= 1,2 (27,75) +1,6 (4)
= 39,7 kN/m

13
 Menghitung Momen

1
Mt = 16 . Wu . l²
1
= 16 . 39,7. 3²

= 22,33 kNm
1
Ml = 14 . Wu . l²
1
= 14 . 39,7. 3²

= 25,521 kNm
1
Mti = 10 . Wu . l²
1
= 10 . 39,7. 3²

= 35,73 kNm
 Perhitungan Tulangan
 Tinggi balok (h) = 450 mm
 Lebar balok (b) = 400 mm
 penutup beton (p) = 25 mm
 Ø tulangan utama = Ø 16
 Ø sengkang =Ø8
 fc = 25 MPa ; fy = 240 MPa

Penentuan tinggi efektif


1
d = h – p – Ø sengkang – 2Ø tul. utama

= 450 – 25 – 8 – 8
= 409 mm

14
 Mt = 22,33 kNm
Mu 22,33
k= = = 668,562 kN/m
b.d² 0,2.0,409²
0.0037−0.0032
ρinterpolasi = 0,0032+( ) x (668,562 – 600)
700−600
= 0,00354

ρmin = 0,00281
ρmax = 0,0302
→ Maka dipakai ρinterpolasi = 0,00354

Ast = ρ. b. d.
= 0,00354. 200. 409
= 289,572 mm²
Dipakai tulangan 2 Ø 14 (Asti = 308 mm²)

 Ml = 25,521 kNm
Mu 25,521
k= = = 764,101 kN/m²
b.d² 0,2x0,409²
0,0043−0,0037
ρinterpolasi = 0,0037 +( ) x (764,101 – 700)
800−700
= 0,00408

ρmin = 0,00281
ρmax = 0,0302
→ Maka dipakai ρinterpolasi = 0,00408

Asl = ρ. b. d.
= 0,00408. 200. 409
= 333,744 mm²
Dipakai tulangan 3 Ø 14 (Asl = 462 mm²)
 Mti = 35,73 kNm
Mu 35,73
k= = = 1069,76 kN/m²
b.d² 0,2.0,409²

15
0,0066−0,0060
ρinterpolasi = 0,0060 +( ) x (1069,76– 1100)
1200−1100
= 0,00582

ρmin = 0,00281
ρmax = 0,0302
→ Maka dipakai ρinterpolasi = 0,00582

Ast = ρ. b. d.
= 0,00582. 200. 409
= 476,076 mm²
Dipakai tulangan 4 Ø 14 (Asti = 616 mm²)

40 40 40

16
PERENCANAAN KOLOM

Data kolom :
Ukuran kolom = 400 x 400 mm
Ø tulangan utama = 12 mm
Selimut beton (p) = 40 mm
Ø tulangan sengkang = 8 mm
fy = 240 MPa ; f’c = 25 MPa

1 Pembebanan
Brt.sendiri plat lantai = 4,9 kN
Brt. sendiri Balok =(0,45 x 0,35 x 24) = 3,78 kN
Brt. sendiri kolom = (0,3 x 0,3 x 24 x 2) = 4,32 kN +
Pu = 13 kN
6P
Beban Aksial (Pu) =
2
6 . 13
=
2
= 39 kN

2 Perhitungan Momen
Wu balok = 30,75 kN/m → Wu balok terbesar
1 1
Mu = . Wu . l²+ . Pu . l
8 4
1 1
= . 30,75. 2² + . 13 . 2
8 4
= 21,875 kNm

3 Perhitungan Arah Vertikal


Agr =bxh
= 400 x 400
= 160000 mm²
Pu
Sumbu Vertikal =
Ø . Agr . 0,85 . f′c
13000
=
0,65 .160000 . 0,85 . 20

17
= 0,00735
4 Menentukan Eksentrisitas
Mu
et =
Pu
21,875
=
13
= 1,682 m

et 1,682
=
h 0,3

= 5,609 m

5 Perhitungan Arah Horizontal


Pu et
Sumbu horizontal = .
Ø . Agr . 0,85 . f′c h

= 0,00735 x 5,609
= 0,042
6 Perhitungan Tulangan
Data :
h = 400 mm
selimut beton (d’) = 40 mm
d′ 40
=
h 400
= 0,10
Dari tabel grafik kolom diperoleh nilai r = 0,075 dengan β = 1
ρ =r.β
= 0,075 .1
= 0,075
Astot = ρ . Agr
= 0,075. 160000 = 12000 mm²
Karena menggunakan penulangan 4 sisi, maka :
12000 : 4 = 3000 mm²
Dipakai tulangan 10 Ø 22 = 3801 mm²

18
10 Ø 22
400
Ø8-150

400

Gb. Penampang Kolom

PERIKSA PENGARUH TEKUK KOLOM A

Penyelesaian :
Beban Mati pada struktur : D = 0,1 . 2400 = 240 kg/m²
Beban Hidup pada struktur : L = 250 kg/m²
1,2.D 1,2.240
βd = = = 0,4186
1,2D+1,6L 1,2.240+1,6.250

Modulus elastisitas beton


Ec = 4700√𝑓𝑐′ = 4700√25 = 23500 MPa = 23500 kg/cm²
1
Momen inersia kolom : Ig = x 40x40³ = 213333,12 𝑐𝑚4
12
Ig 213333,12
(Ec. ) (23500. )
2,5 2,5
E.lk = = = 1458422784 kg/cm²
(1+βd) (1+0,375)
1
Momen inersia kolom : Ig = x 45x40³ = 240000 𝑐𝑚4
12
Ig 240000
(Ec. ) (23500. )
5 5
E.lk = = = 820363636,36 kg/cm²
(1+βd) (1+0,375)

Kekakuan relative pada ujung atas dari kolom A dipengaruhi oleh kekakuan dari balok.
Ukuran balok 45/40 cm, dan panjang Lb= 6m.
lk
(E.
)
Lk
ψA = lb
(E. )
Lb

19
1458422784
( )
200
ψA = 820363636,36
( )
600

7292113,92
ψA = = 5,33
1367272,73
Kekakuan relative pada ujung bawah kolom :
ψB = 0 (terjepit pada pondasi)
Struktur portal diasumsikan sebagai portal tidak bergoyang, sehingga factor panjang efektif
kolom (k), ditentukan sbb:
k = 0,7 + 0,05 . (ψA + ψB) = 0,7 + 0,05 . (5,33 + 0) = 0,966
k = 0,85+0,05.ψB = 0,85 + 0,05 .0 = 0,85
Jadi factor panjang efektif kolom yang dipergunakan untuk perhitungan adalah : k = 0,966
Panjang tekuk kolom : Lc = k.Lu = 0,966.200 = 193,3
Untuk kolom persegi, jari-jari inersia : r = 0,3.h = 0,3.40 = 12 cm
Lc 193,3
Rasio kelangsingan kolom : ˰λ= = = 16,108
r 12
Lenturan yang terjadi pada kolom adalah lengkung ganda (lihat diagram momen lentur),
sehingga M1 = -0,145 tm (dari SAP) dan M2 = + 0,27 tm (dari SAP).
Dengan demikian batas kelangsingan kolom adalah:
34-12(M1/M2) = 34-12(-0,145/0,27) = 40,4
Pemeriksaan kelangsingan kolom :
λ = Lc/r = 17,247 ≤ 12(M1/M2) = 40,4
Karena λ = 16,108 ≤ 40,4, maka pengaruh tekuk tidak perlu ditinjau pada perhitungan
penulangan kolom (Kolom A, termasuk kolom pendek).
Dengan Demikian penulangan dari kolom A hanya perlu diperhitungkan untuk memikul
momen lentur sebesar M = M2 = 0,27 tm, dan gaya normal tekan sebesar P = 13,139 ton
(Dari SAP).
Jadi momen lentur (Mu) dan gaya normal tekan desain (Pu) yang harus didukung kolom
adalah : Mu = 0,27 tm dan Pu = 13,139 ton.

20
PERIKSA TORSI/PUNTIR PADA BALOK
Data :
M tumpuan plat 1 = 9,06 kNm
M tumpuan plat 2 = 9,06 kNm
M tumpuan balok anak = 49,66 kNm
Vu = 21,350 kN
Øs = 8 mm
Rb = 0
-(MT plat1 . 3 .4,5) –(MT balok anak . 3)-(MT plat2. 3 . 1,5) + (Ra.6) = 0
-(9,06 . 3 . 4,5) –(49,66 .3)-(9,06.3.1,5)+(Ra.6) = 0
-122,31-148,98-40,77+6Ra = 0
312,06
Ra =
6
Tu=Ra=Rb = 52,01 kNm
√fc′
15
Tc =
bxVu
√1+( )²
2,1xTu

√25
15
=
0,40x21,350
√1+( 2,1x52,01 ) ²

1,291
=
1,162

= 1,11 kNm
ØTc = 0,6 x Tc
= 0,6 x 1,11
= 0,666
√𝑓𝑐′ √25
x b² x h = x 400² x 450 = 1,125 kNm
20 20

√𝑓𝑐′
Ø x b² x h = 0,6 x 1,125 = 0,675 kNm
20

Syarat ØTc < Tu


1,11 < 0,675 (Tidak diperlukan tulangan torsi) OK
Torsi untuk baja tulangan
ØTs = Tu-ØTc
= 52,01 -0,666
= 51,344 kNm

21
ØTs maks = 4 x ØTc
= 4 x 1,11
= 4,44 kNm
ØTs > ØTs maks
51,344 > 4,44 (Ukuran balok perlu diperbesar untuk menahan torsi).

22