Prerequisites
Introduction
Before attempting this module, you must
have demonstrated that you can properly: Pre -rigging is the hands-on side of
preparation for a vertical rescue. The aim is
1. Use and care for rope. to rig identified systems or sub-assemblies
2. Use and care for vertical rescue prior to the event in order to reduce the time
equipment. to access and rescue a casualty.
3. Tie correctly and without hesitation all
the knots specified in this training To apply Pre -Rigging to vertical rescue
package. requires:
4. Apply the principles of vertical mobility. • Accurate intelligence of the nature and
5. Apply the principles of vertical rescue. scope of vertical rescues to be performed.
6. Apply the principles of safe rigging. • Experience
7. Demonstrate an aptitude for vertical • Sound knowledge of vertical rescue
rescue operations. systems.
8. Demonstrate an appreciation and
understanding of the hazards, aims and
requirements of vertical rescue. WARNING
Pre -Rigging without adequate planning and
Objectives
experience could lead to increased response
times. De -rigging a pre-rig in order to do a
At the completion of this module, you should
job, should be an exception rather than a
be able to:
rule. Regular critical reviews of pre -rigging
protocols adopted by the unit are necessary
1. Explain the aim and principle of pre -
to avoid inappropriate pre -rigging.
rigging.
2. Identify examples of pre -rigging.
IF IT DOESN'T SAVE TIME ON THE JOB -
3. Suggest possible systems or sub-
DON'T PRE-RIG.
assemblies which lend themselves to pre -
rigging.
4. Explain why knots should not, in Few units have sufficient equipment to pre-
general, be left tight in rope. rig all the possible systems they may need.
5. Explain why permanent knots are Compromise and skillful application of the
acceptable in some pre-rigs. principles of pre-rigging will yield the
6. Describe safe protocols for use with pre- required on the job time benefits, without the
rigs using both permanent and non- need for extra/excessive dedicated
permanent knots. equipment.