TRANSPORT

UNLOADING AND STORAGE


KONTI KAN PP-HM pipes should be transported on
vehicles of proper length. The pipe ends should not
project from the load body for more than 1 meter. The
pipes should be transported with protected end surface
from damage. They can be transported as a loose
product, but should be supported and secured along
their entire length while travelling.

:KHQXQORDGLQJSLSHVDQGÀWWLQJVVKRXOGEHGHSRVLWHG
linearly on a smooth surface free from stones or hard
objects.

The sealing rings should be protected from exposure to


UV radiation and stored in covered dry rooms.

Do not store in stacks of over 3 meters.

ASSEMBLING OF KONTI KAN


PP-HM PIPES WITH PVC/PP/PE
CONNECTION PARTS

Step 1 Step 2

Step 3 Step 4

KONTI KAN PP-HM


CONNECTION OF KONTI KAN PP-HM PIPE

Step 1 Step 2

Step 3 Step 4

Step 5 Step 6

14 KONTI KAN PP-HM