No Uraian Pekerjaan
Panjang
B PEKERJAAN TANAH
1 Galian Tanah
a Gg. Kenari 01 57.00
b Gg. Kenari 02 62.00
- Tulangan
- Bekisting
a Gg. Kenari 01 57.00
b Gg. Kenari 02 62.00
2 Plat Atas Drainase
- Beton K-250
a Gg. Kenari 01 49.00
b Gg. Kenari 02 53.60
- Tulangan
a Gg. Kenari 01 Melintang 8 0.35
Memanjang 8 49.00
- Bekisting
a Gg. Kenari 01 49.00
b Gg. Kenari 02 53.60
3 Tutup Drainase
- Beton K-250
a Gg. Kenari 01 0.40
b Gg. Kenari 02 0.40
- Tulangan
a Gg. Kenari 01 Melintang 8 0.35
Memanjang 8 0.55
- Bekisting 0.60
0.60
Dimensi
Jumlah Volume Satuan
Lebar Tinggi/Tebal
1.00 1.00 Ls
1.00 1.00 Ls
Total 14.28 m3
Total 16.66 m3
Jumlah Berat
11.00 0.39 1.00 247.65 kg
381.00 0.39 1.00 234.51 kg
Total 1,006.33 kg
Total 119.00 m2
1
2
0.40 0.10 1.00 1.96 m3
0.40 0.10 1.00 2.14 m3
Total 4.10 m3
Total 216.04 kg
Total 41.04 kg
Total 0.98 m3
Total 49.34 kg
Total 9.84 m2
0.5
B PEKERJAAN TANAH
1 Galian Tanah
a Jl. Pasar 01 23.00
b Gg. Lorong Said Alwi III.a 30.00
c Gg. Lorong Said Alwi III.b 57.00
d Gg. Penatu 01 65.00
e Gg. Penatu 02 50.00
f Gg. Aridu 01 65.00
g Gg. Aridu 02 45.00
h Gg. Aridu 03 47.00
i Gg. Lestari RT. 07 RW. 03 35.00
j Gg. Bustami RT. 07 RW. 03 35.00
- Bekisting
a Jl. Pasar 01 23.00
b Gg. Lorong Said Alwi III.a 30.00
c Gg. Lorong Said Alwi III.b 57.00
2 Plat Atas Drainase
- Beton K-250
a Jl. Pasar 01 19.80
b Gg. Lorong Said Alwi III.a 25.60
c Gg. Lorong Said Alwi III.b 49.00
- Tulangan
a Jl. Pasar 01 Melintang 8 0.35
Memanjang 8 19.80
3 Tutup Drainase
- Beton K-250
a Jl. Pasar 01 0.40
b Gg. Lorong Said Alwi III.a 0.40
c Gg. Lorong Said Alwi III.b 0.40
- Tulangan
a Jl. Pasar 01 Melintang 8 0.35
Memanjang 8 0.55
- Bekisting
a Jl. Pasar 01 0.60
b Gg. Lorong Said Alwi III.a 0.60
c Gg. Lorong Said Alwi III.b 0.60
Dimensi
Jumlah Volume Satuan
Lebar Tinggi/Tebal
1.00 1.00 Ls
1.00 1.00 Ls
Total 54.24 m3
Total 63.28 m3
Jumlah Berat
11.00 0.39 1.00 100.08 kg
154.00 0.39 1.00 94.79 kg
Total 931.22 kg
1
2
0.40 0.10 1.00 0.79 m3 3
0.40 0.10 1.00 1.02 m3
0.40 0.10 1.00 1.96 m3
Total 3.78 m3
Total 37.76 kg
Total 46.93 kg
B PEKERJAAN TANAH
1 Galian Tanah
a Gg. Amanat 49.00
b Gg. Kuburan 121.00
c Gg. Roti 82.00
d Gg. Sablon 103.00
e Gg. Kuzazi 01 150.00
f Gg. Kuzazi 02 34.00
g Gg. Pelangi 60.00
h Gg. Sambal 153.00
i Gg. Darussalam 01 122.00
j Gg. Darussalam 02 38.00
- Bekisting
a Gg. Amanat 49.00
b Gg. Kuburan 121.00
c Gg. Roti 82.00
d Gg. Sablon 103.00
e Gg. Kuzazi 01 150.00
f Gg. Kuzazi 02 34.00
g Gg. Pelangi 60.00
h Gg. Sambal 153.00
i Gg. Darussalam 01 122.00
j Gg. Darussalam 02 38.00
- Tulangan
a Gg. Amanat Melintang 8 0.35
Memanjang 8 42.20
- Bekisting
a Gg. Amanat 42.20
b Gg. Kuburan 104.60
c Gg. Roti 70.80
d Gg. Sablon 89.00
e Gg. Kuzazi 01 129.60
f Gg. Kuzazi 02 29.20
g Gg. Pelangi 51.60
h Gg. Sambal 132.20
i Gg. Darussalam 01 105.60
j Gg. Darussalam 02 32.80
3 Tutup Drainase
- Beton K-250
a Gg. Amanat 0.40
b Gg. Kuburan 0.40
c Gg. Roti 0.40
e Gg. Sablon 0.40
d Gg. Kuzazi 01 0.40
f Gg. Kuzazi 02 0.40
g Gg. Pelangi 0.40
h Gg. Sambal 0.40
i Gg. Darussalam 01 0.40
j Gg. Darussalam 02 0.40
- Tulangan
a Gg. Amanat Melintang 8 0.35
Memanjang 8 0.55
1.00 1.00 Ls
1.00 1.00 Ls
Total 109.44 m3
Jumlah Berat
11.00 0.39 1.00 212.93 kg
327.00 0.39 1.00 201.27 kg
Total 7,706.85 kg
Total 912.00 m2
1
2
0.40 0.10 1.00 1.69 m3 2
0.40 0.10 1.00 4.18 m3 2
0.40 0.10 1.00 2.83 m3 2
0.40 0.10 1.00 3.56 m3 2
0.40 0.10 1.00 5.18 m3 2
0.40 0.10 1.00 1.17 m3 2
0.40 0.10 1.00 2.06 m3 2
0.40 0.10 1.00 5.29 m3 2
0.40 0.10 1.00 4.22 m3
0.40 0.10 1.00 1.31 m3
Total 31.50 m3
Total 1,658.38 kg
Total 315.04 m2
Total 7.46 m3
Total 374.26 kg
0.40 17.00 4.08 m2
0.40 41.00 9.84 m2
0.40 28.00 6.72 m2
0.40 35.00 8.40 m2
0.40 51.00 12.24 m2
0.40 12.00 2.88 m2
0.40 21.00 5.04 m2
0.40 52.00 12.48 m2
0.40 41.00 9.84 m2
0.40 13.00 3.12 m2
Total 74.64 m2
0.5
Panjang Panjang Tutup Jumlah Tutup Jumlah Total
Gg. Amanat 49.00 0.40 17.00 42.20
Gg. Kuburan 121.00 0.40 41.00 104.60
Gg. Roti 82.00 0.40 28.00 70.80
Gg. Sablon 103.00 0.40 35.00 89.00
Gg. Kuzazi 01 150.00 0.40 51.00 129.60
Gg. Kuzazi 02 34.00 0.40 12.00 29.20
Gg. Pelangi 60.00 0.40 21.00 51.60
Gg. Sambal 153.00 0.40 52.00 132.20
Gg. Darussalam 01 122.00 0.40 41.00 105.60
Gg. Darussalam 02 38.00 0.40 13.00 32.80
Dimensi
No Uraian Pekerjaan
Panjang
B PEKERJAAN TANAH
1 Galian Tanah
a Munti Bungur 01 57.00
b Munti Bungur 02 16.00
c Munti Bungur 03 96.00
d Munti Bungur 04 43.00
e Munti Bungur 05 16.00
f Munti Bungur 06 64.00
g Munti Bungur 07 - 42.00
- 65.00
h Munti Bungur 08 - 56.00
- 2.00
Pokok 8 65.06
Sengkang 8 1.56
Pokok 8 2.06
Sengkang 8 1.56
Bekisting
a Munti Bungur 01 57.00
b Munti Bungur 02 16.00
c Munti Bungur 03 96.00
d Munti Bungur 04 43.00
e Munti Bungur 05 16.00
f Munti Bungur 06 64.00
g Munti Bungur 07 42.00
65.00
h Munti Bungur 08 56.00
2.00
Tulangan
a Munti Bungur 01 Melintang 8 0.35
Memanjang 8 49.00
Melintang 8 0.35
Memanjang 8 56.20
Melintang 8 0.35
Memanjang 8 1.60
Bekisting
a Munti Bungur 01 49.00
b Munti Bungur 02 13.60
c Munti Bungur 03 82.80
d Munti Bungur 04 37.00
e Munti Bungur 05 13.60
f Munti Bungur 06 55.20
g Munti Bungur 07 36.00
56.20
h Munti Bungur 08 48.40
1.60
3 Tutup Drainase
Beton K-250
a Munti Bungur 01 0.40
b Munti Bungur 02 0.40
c Munti Bungur 03 0.40
d Munti Bungur 04 0.40
e Munti Bungur 05 0.40
f Munti Bungur 06 0.40
g Munti Bungur 07 0.40
0.40
h Munti Bungur 08 0.40
0.40
Tulangan
a Munti Bungur 01 Melintang 8 0.35
Memanjang 8 0.55
Melintang 8 0.35
Memanjang 8 0.55
Melintang 8 0.35
Memanjang 8 0.55
Bekisting
a Munti Bungur 01 0.60
b Munti Bungur 02 0.60
c Munti Bungur 03 0.60
d Munti Bungur 04 0.60
e Munti Bungur 05 0.60
f Munti Bungur 06 0.60
g Munti Bungur 07 0.60
0.60
h Munti Bungur 08 0.60
Dimensi
Jumlah Volume Satuan
Lebar Tinggi/Tebal
1.00 1.00 Ls
1.00 1.00 Ls
Total 54.84 m3
Total 63.98 m3
Jumlah Berat
11.00 0.39 1.00 247.65 kg
381.00 0.39 1.00 234.51 kg
Total 3,865.22 kg
Total 457.00 m2
1
2
0.40 0.10 1.00 1.96 m3 3
0.40 0.10 1.00 0.54 m3 4
0.40 0.10 1.00 3.31 m3 5
0.40 0.10 1.00 1.48 m3 6
0.40 0.10 1.00 0.54 m3 7
0.40 0.10 1.00 2.21 m3
0.40 0.10 1.00 1.44 m3 8
0.40 0.10 1.00 2.25 m3
0.40 0.10 1.00 1.94 m3
0.40 0.10 1.00 0.06 m3
Total 15.74 m3
Total 784.55 kg
Total 157.36 m2
Total 3.82 m3
Total 191.34 kg
Total 37.92 m2
0.5
Panjang Panjang Tutup Jumlah Tutup Jumlah Total
Munti Bungur 01 57.00 0.40 20.00 49.00
Munti Bungur 02 16.00 0.40 6.00 13.60
Munti Bungur 03 96.00 0.40 33.00 82.80
Munti Bungur 04 43.00 0.40 15.00 37.00
Munti Bungur 05 16.00 0.40 6.00 13.60
Munti Bungur 06 64.00 0.40 22.00 55.20
Munti Bungur 07 42.00 0.40 15.00 36.00
65.00 0.40 22.00 56.20
Munti Bungur 08 56.00 0.40 19.00 48.40
2.00 0.40 1.00 1.60
Dimensi
No Uraian Pekerjaan
Panjang
B PEKERJAAN TANAH
1 Galian Tanah
a Gg. Penatu 01 65.00
b Gg. Penatu 02 50.00
c Gg. Aridu 01 65.00
d Gg. Aridu 02 45.00
e Gg. Aridu 03 47.00
f Gg. Lestari RT. 07 RW. 03 35.00
g Gg. Bustami RT. 07 RW. 03 35.00
- Tulangan
- Bekisting
a Gg. Penatu 01 65.00
c Gg. Penatu 02 50.00
b Gg. Aridu 01 65.00
d Gg. Aridu 02 45.00
e Gg. Aridu 03 47.00
f Gg. Lestari RT. 07 RW. 03 35.00
g Gg. Bustami RT. 07 RW. 03 35.00
- Tulangan
a Gg. Penatu 01 Melintang 8 0.35
Memanjang 8 56.20
- Bekisting
a Gg. Penatu 01 56.20
b Gg. Penatu 02 43.20
c Gg. Aridu 01 56.20
d Gg. Aridu 02 38.60
e Gg. Aridu 03 40.60
f Gg. Lestari RT. 07 RW. 03 30.20
g Gg. Bustami RT. 07 RW. 03 30.20
3 Tutup Drainase
- Beton K-250
a Gg. Penatu 01 0.40
b Gg. Penatu 02 0.40
c Gg. Aridu 01 0.40
d Gg. Aridu 02 0.40
e Gg. Aridu 03 0.40
f Gg. Lestari RT. 07 RW. 03 0.40
g Gg. Bustami RT. 07 RW. 03 0.40
- Tulangan
- Bekisting
a Gg. Penatu 01 0.60
b Gg. Penatu 02 0.60
c Gg. Aridu 01 0.60
d Gg. Aridu 02 0.60
e Gg. Aridu 03 0.60
f Gg. Lestari RT. 07 RW. 03 0.60
g Gg. Bustami RT. 07 RW. 03 0.60
Dimensi
Jumlah Volume Satuan
Lebar Tinggi/Tebal
1.00 1.00 Ls
1.00 1.00 Ls
Total 41.04 m3
Total 47.88 m3
Jumlah Berat
11.00 0.39 1.00 282.37 kg
434.00 0.39 1.00 267.13 kg
Total 2,909.29 kg
Total 342.00 m2
4
4
0.40 0.10 1.00 2.25 m3 4
0.40 0.10 1.00 1.73 m3 4
0.40 0.10 1.00 2.25 m3 4
0.40 0.10 1.00 1.54 m3 4
0.40 0.10 1.00 1.62 m3 4
0.40 0.10 1.00 1.21 m3
0.40 0.10 1.00 1.21 m3
Total 11.81 m3
Total 621.75 kg
Total 118.08 kg
0.60 0.10 22.00 0.53 m3
0.60 0.10 17.00 0.41 m3
0.60 0.10 22.00 0.53 m3
0.60 0.10 16.00 0.38 m3
0.60 0.10 16.00 0.38 m3
0.60 0.10 12.00 0.29 m3
0.60 0.10 12.00 0.29 m3
Total 2.81 m3
Total 140.80 kg
Total 28.08 m2
0.5
Panjang Panjang Tutup Jumlah Tutup Jumlah Total
B PEKERJAAN TANAH
1 Galian Tanah
a Gg. Ketapang 2 81.00
b Gg. Ketapang 3 8.00
c Gg. Bahagia 41.00
d Blok Bukat 01 74.00
e Blok Bukat 02 100.00
f Gg. Baru 43.00
- Tulangan
a Gg. Ketapang 2 Melintang 8 0.35
Memanjang 8 69.80
b Gg. Ketapang 3 Melintang 8 0.35
Memanjang 8 6.80
- Bekisting
a Gg. Ketapang 2 69.80
b Gg. Ketapang 3 6.80
c Gg. Bahagia 35.40
d Blok Bukat 01 64.00
e Blok Bukat 02 86.40
f Gg. Baru 37.00
3 Tutup Drainase
- Beton K-250
a Gg. Ketapang 2 0.40
b Gg. Ketapang 3 0.40
c Gg. Bahagia 0.40
d Blok Bukat 01 0.40
e Blok Bukat 02 0.40
f Gg. Baru 0.40
- Tulangan
a Gg. Ketapang 2 Melintang 8 0.35
Memanjang 8 0.55
- Bekisting
a Gg. Ketapang 2 0.60
b Gg. Ketapang 3 0.60
c Gg. Bahagia 0.60
d Blok Bukat 01 0.60
e Blok Bukat 02 0.60
f Gg. Baru 0.60
Dimensi
Jumlah Volume Satuan
Lebar Tinggi/Tebal
1.00 1.00 Ls
1.00 1.00 Ls
Total 41.64 m3
Jumlah Berat
11.00 0.39 1.00 351.81 kg
541.00 0.39 1.00 332.99 kg
Total 347.00 m2
1
2
0.40 0.10 1.00 2.79 m3 3
0.40 0.10 1.00 0.27 m3 4
0.40 0.10 1.00 1.42 m3 4
0.40 0.10 1.00 2.56 m3 4
0.40 0.10 1.00 3.46 m3
0.40 0.10 1.00 1.48 m3
Total 11.98 m3
Total 630.59 kg
Total 119.76 kg
Total 2.86 m3
Total 143.21 kg
Total 28.56 m2
0.5
Panjang Panjang Tutup Jumlah Tutup Jumlah Total
Gg. Ketapang 2 81.00 0.40 28.00 69.80
Gg. Ketapang 3 8.00 0.40 3.00 6.80
Gg. Bahagia 41.00 0.40 14.00 35.40
Blok Bukat 01 74.00 0.40 25.00 64.00
Blok Bukat 02 100.00 0.40 34.00 86.40
Gg. Baru 43.00 0.40 15.00 37.00