You are on page 1of 42

Project :-

Construction of Long Span High- Level Road Bridge over River


Teesta with Approaches near Haldibari, Connecting Sub-
Divisional head quarter at Mekhligang/ Haldibari in the Distr
of Coochbihar, West- Bengal Through Engineering ,Procurem
& Construction (EPC) Mode.

Client :- Superintending Engineer North Bengal Construction Circle N


Authority Engineer :- LEA Associates South Asia Pvt. Ltd.
EPC Contractor :- S.P Singla Construction Pvt.Ltd.
SIEVE ANALYSIS OF COARSE AGGREGATE (IS 383)

Date of Sampling 13-03-18


Source of Material Pakur Sampled By Jointly
Description of Material 20mm Aggragate Date of Testing 13-03-18
Sample at Stock Tested By Jointly
Sample No 1 Sample Weight 10000

Cum. Weight
IS SIEVE Wt. Of Retained (gm) (gms) Cum. % Retained (gms) Cum. % of Passing
40 0 0 0 100
20 1147.0 1147 11.47 88.53
10 8287.0 9434 94.34 5.66
4.75 407.0 9841 98.41 1.59

Sample No Sample Weight 10000

IS SIEVE Wt. Of Retained (gm) Cum. Weight Cum. % Retained Cum. % of Passing
40 0 0 0 100
20 1088 1088 10.88 89.12
10 8312 9400 94.00 6.00
4.75 492 9892 98.92 1.08
Sample No 3 Sample Weight 10000

IS SIEVE Wt. Of Retained (gm) Cum. Weight Cum. % Retained Cum. % of Passing
40 0 0 0 100
20 1182 1182 11.82 88.18
10 8312 9494 94.94 5.06
4.75 401 9895 98.95 1.05

Remarks

EPC Representative PMC Representative IC Representative


EPC Representative Authority's Representative

EPC Representative PMC Representative IC Representative


tion of Long Span High- Level Road Bridge over River
th Approaches near Haldibari, Connecting Sub-
l head quarter at Mekhligang/ Haldibari in the District
bihar, West- Bengal Through Engineering ,Procurement
uction (EPC) Mode.

nding Engineer North Bengal Construction Circle No. I

COARSE AGGREGATE (IS 383)

gms

Limit
100
85-100
0-20
0-5

gms

Limit
100
85-100
0-20
0-5
gms

Limit
100
85-100
0-20
0-5

EPC Representative PMC Representative IC Representative


Authority's Representative

EPC Representative PMC Representative IC Representative


Project :-
Construction of Long Span High- Level Road Bridge over Rive
Teesta with Approaches near Haldibari, Connecting Sub-
Divisional head quarter at Mekhligang/ Haldibari in the Dist
of Coochbihar, West- Bengal Through Engineering
,Procurement & Construction (EPC) Mode.

Client :- Superintending Engineer North Bengal Construction Circle N


Authority Engineer :- LEA Associates South Asia Pvt. Ltd.
EPC Contractor :- S.P Singla Construction Pvt.Ltd.
SIEVE ANALYSIS OF COARSE AGGREGATE (IS 383)
Date of Sampling 13-03-18
Source of Material Pakur Sampled By Jointly
Description of Material 10 mm Aggragate Date of Testing 13-03-18
Sample at Stock Tested By Jointly
Sample No 1 Sample Weight 10000

Cum. % Retained
IS SIEVE Wt. Of Retained (gm) Cum. Weight (gms) (gms) Cum. % of Passing
12.5 0 0 0 100
10 600 600 6.00 94.00
4.75 8732 9332 93.32 6.68
2.36 481 9813 98.13 1.87

Sample No 2 Sample Weight 10000

Cum. % Retained
IS SIEVE Wt. Of Retained (gm) Cum. Weight (gms) (gms) Cum. % of Passing
12.5 0 0 0.00 100.00
10 621 621 6.21 93.79
4.75 8679 9300 93.00 7.00
2.36 532 9832 98.32 1.68

Sample No 3 Sample Weight 10000


Cum. % Retained
IS SIEVE Wt. Of Retained (gm) Cum. Weight (gms) (gms) Cum. % of Passing
12.5 0 0 0.00 100.00
10 676 676 6.76 93.24
4.75 8634 9310 93.10 6.90
2.36 584 9894 98.94 1.06

Remarks

EPC Representative Authority Engineer Representative


EPC Representative Authority's Representative

EPC Representative Authority Engineer Representative


uction of Long Span High- Level Road Bridge over River
with Approaches near Haldibari, Connecting Sub-
nal head quarter at Mekhligang/ Haldibari in the District
hbihar, West- Bengal Through Engineering
ement & Construction (EPC) Mode.

ntending Engineer North Bengal Construction Circle No. I

OF COARSE AGGREGATE (IS 383)

gms

Limit
100
85-100
0-20
0-5

gms

Limit
100
85-100
0-20
0-5

gms

Limit
100
85-100
0-20
0-5

EPC Representative Authority Engineer Representative


Authority's Representative

EPC Representative Authority Engineer Representative


Project :-
Construction of Long Span High- Level Road Bridge over River
with Approaches near Haldibari, Connecting Sub- Divisional h
quarter at Mekhligang/ Haldibari in the District of Coochbihar
West- Bengal Through Engineering ,Procurement & Construct
(EPC) Mode.
Client :- Superintending Engineer North Bengal Construction Circle No
Authority Engineer :- LEA Associates South Asia Pvt. Ltd.
EPC Contractor :- S.P Singla Construction Pvt.Ltd.
SIEVE ANALYSIS OF FINE AGGREGATE (IS 383)
Date of Sampling 13-03-18
Source of Material Kaljani Sampled By Jointly
Description of Material Fine Aggregate Date of Testing 13-03-18
Sample at Stock Yard Tested By Jointly

Sample No. 1 Weight 1000


IS SIEVE Size Wt. Of Retained (gm) Cum. Weight (gm) Cum. % Retained Cum. % of Passing
in(mm)

10 0 0 0.00 100
4.75 68.0 68.0 6.80 93.20
2.36 69.0 137 13.70 86.30
1.18 134.0 271.0 27.10 72.90
0.6 168.0 439.0 43.90 56.10
0.3 410.0 849 84.90 15.10
0.15 127.0 976.0 97.60 2.40
Finess Modulas 2.740
Sample No. 2 Weight 1000
IS SIEVE Size Wt. Of Retained (gm) Cum. Weight Cum. % Retained Cum. % of Passing
in(mm)

0
10 0 0.00 100.00
4.75 65.0 65 6.50 93.50
2.36 76.0 141.0 14.10 85.90
1.18 131.0 272.0 27.20 72.80
0.6 172.0 444.0 44.40 55.60
0.3 423.0 867.0 86.70 13.30
0.15 121.0 988.0 98.80 1.20
Finess Modulas 2.777
Date of Sampling 13-03-18
Source of Material Kaljani Sampled By Jointly
Description of Material Fine Aggregate Date of Testing 13-03-18
Sample at Stock Yard Tested By Jointly
Sample No. 3 Weight 1000
IS SIEVE Size Wt. Of Retained (gm) Cum. Weight (gm) Cum. % Retained Cum. % of Passing
in(mm)

10 0 0 0.00 100.00
4.75 58.0 58.0 5.80 94.20
2.36 86.0 144.0 14.40 85.60
1.18 131.0 275.0 27.50 72.50
0.6 162.0 437.0 43.70 56.30
0.3 421.0 858.0 85.80 14.20
0.15 121.0 979.0 97.90 2.10
Finess Modulas 2.75

Remarks

EPC Representative Authority's Representativ


ion of Long Span High- Level Road Bridge over River Teesta
oaches near Haldibari, Connecting Sub- Divisional head
Mekhligang/ Haldibari in the District of Coochbihar,
ngal Through Engineering ,Procurement & Construction
de.
nding Engineer North Bengal Construction Circle No. I

OF FINE AGGREGATE (IS 383)

gms
Limit

100
90-100
75-100
55-90
35-59
8-30
0-10

gms
Limit

100
90-100
75-100
55-90
35-59
8-30
0-10
gms
Limit

100
90-100
75-100
55-90
35-59
8-30
0-10

Authority's Representative
Project
Construction of Long Span High- Level Road Bridge over R
Teesta with Approaches near Haldibari, Connecting Sub- D
head quarter at Mekhligang/ Haldibari in the District of
Coochbihar, West- Bengal Through Engineering ,Procurem
Construction (EPC) Mode.

Client Superintending Engineer North Bengal Construction Circl

Authority Engineer LEA Associates South Asia Pvt. Ltd.


EPC Contractor S.P Singla Construction Pvt.Ltd.

AVERAGE GRADATION OF COARSE AGGREGATE

20mm Agg
% Passing Average
Sieve Size
(mm)
S-1 S-2 S-3

40.00 100.00 100.00 100.00 #DIV/0!


20.00 88.53 89.12 88.18 #DIV/0!
10.00 5.66 6.00 5.06 #DIV/0!
4.75 1.59 1.08 1.05 #DIV/0!

10mm Agg
% Passing
Sieve Size
Average
(mm)
S-1 S-2 S-3

12.50 100.00 100.00 100.00 #DIV/0!


10.00 94.00 93.79 93.24 #DIV/0!
4.75 6.68 7.00 6.90 #DIV/0!
2.36 1.87 1.68 1.06 #DIV/0!

EPC Representative Authority Engineer Representative


AVERAGE GRADATION OF FINE AGGREGATE

Sand

% Passing
Sieve Size
Average
(mm)
S-1 S-2 S-3

10.00 100.00 100.00 100.00 #DIV/0!


4.75 93.20 93.50 94.20 #DIV/0!
2.36 86.30 85.90 85.60 #DIV/0!
1.18 72.90 72.80 72.50 #DIV/0!
0.600 56.10 55.60 56.30 #DIV/0!
0.300 15.10 13.30 14.20 #DIV/0!
0.150 2.40 1.20 2.10 #DIV/0!
Remarks

EPC Representative Authority's Representative

EPC Representative Authority Engineer Representative


struction of Long Span High- Level Road Bridge over River
sta with Approaches near Haldibari, Connecting Sub- Divisional
d quarter at Mekhligang/ Haldibari in the District of
chbihar, West- Bengal Through Engineering ,Procurement &
struction (EPC) Mode.

erintending Engineer North Bengal Construction Circle No. I

AGE GRADATION OF COARSE AGGREGATE

Spec. As per IS :383

100
85-100
0-20
0-5

Spec. As per IS :383

100
85-100
0-20
0-5

EPC Representative Authority Engineer Representative


RAGE GRADATION OF FINE AGGREGATE

Spec. As Per IS :383 Zone


-II

100
90-100
75-100
55-90
35-59
8-30
0-10

Authority's Representative

EPC Representative Authority Engineer Representative


Project :-
Construction of Long Span High- Level Road Bridge over
River Teesta with Approaches near Haldibari, Connecting
Sub- Divisional head quarter at Mekhligang/ Haldibari in
District of Coochbihar, West- Bengal Through
Engineering ,Procurement & Construction (EPC) Mode.
Superintending Engineer North Bengal Construction Circ
Client :-
No. I
Authority Engineer :- LEA Associates South Asia Pvt. Ltd.
EPC Contractor :- S.P Singla Construction Pvt.Ltd.
10 mm
20 mm
BLENDING OF COARSE AGGREGATE
Date of Testing 14-01-18
Prpportions of Agg Spec. As per MORTH T
Sieve Size % Passing of % Passing Combined % 1000-1
(mm) 20mm of 10mm of Passing
50% 50% Lower Limt

40.00 100.00 100.00 50.00 50.00 100.00 100


20.00 88.61 100.00 44.31 50.00 94.31 95
10.00 5.57 93.68 2.79 46.84 49.63 25
4.75 1.24 6.86 0.62 3.43 4.05 0

BLENDING OF CA
120

100

80
% of passing

60

40

20

0
1 10.9 20.8 30.7 40.6 50.5 60.4 70.3 80.2 90.1 100

Sieve Size in mm

Column G Column F Column H

Remarks
EPC Representative Authority's Representati
nstruction of Long Span High- Level Road Bridge over
er Teesta with Approaches near Haldibari, Connecting
b- Divisional head quarter at Mekhligang/ Haldibari in the
trict of Coochbihar, West- Bengal Through
gineering ,Procurement & Construction (EPC) Mode.
perintending Engineer North Bengal Construction Circle
I

G OF COARSE AGGREGATE
14-01-18
Spec. As per MORTH Table
1000-1

Upper Limit

100
100
55
10

NDING OF CA

0.6 50.5 60.4 70.3 80.2 90.1 100

Sieve Size in mm

G Column F Column H
Authority's Representative
Project :-
Construction of Long Span High- Level Road Bridge over
River Teesta with Approaches near Haldibari, Connecting
Sub- Divisional head quarter at Mekhligang/ Haldibari in
the District of Coochbihar, West- Bengal Through
Engineering ,Procurement & Construction (EPC) Mode.

Superintending Engineer North Bengal Construction Circle


Client :-
No. I
Authority Engineer :- LEA Associates South Asia Pvt. Ltd.

EPC Contractor :- S.P Singla Construction Pvt.Ltd.

BLENDING OF ALL IN AGGREGATE


Date of Testing 14-01-18
Prpportions of Agg Spec. As per IS 383
Combined Table - 5
Sieve Size % Passing of % Passing CA FA
% of
(mm) CA of FA
62% 38% Passing Lower Limt Upper Limit

40.00 100.00 100.00 62.00 38.00 100.00 100 100


20.00 94.31 100.00 58.47 38.00 96.47 95 100
4.750 4.05 93.63 2.51 35.58 38.09 30 50
0.600 0.00 56.00 0.00 21.28 21.28 10 35
0.150 0.00 1.90 0.00 0.72 0.72 0 6

120
BLENDING OF ALL IN AGG.
100

80
% of passing

60

40

20

0
0.1 10.09 20.08 30.07 40.06 50.05 60.04 70.03 80.02 90.01 100
Remarks
Sieve Size in mm

Column G Column H Column F

EPC Representative Authority Engineer Representative


Column G Column H Column F
EPC Representative Authority's Representative

EPC Representative Authority Engineer Representative


CALCULATION OF COARSE AND FINE

GRADE OF ALL IN AGG.


CONCRETE VOL
M 25 0.732
M 30 0.729
M 35 0.715
M 40 0.699
M 50 0.714
M 55 0.707
M 60 0.696

SPECIFIC GRAVITY OF 10 MM
SPECIFIC GRAVITY OF 20 MM
SPECIFIC GRAVITY OF SAND
ON OF COARSE AND FINE AGGREGATE MASS
0.610 PROPORTION 0.390
Mass of F.A
Mass of Mass of Mass of Sand
10MM 20MM
567.28 698.50 748.89
565.11 695.83 746.03
554.26 682.47 731.70
541.86 667.19 715.33
553.48 681.51 730.68
548.06 674.83 723.52
539.53 664.33 712.26

M 2.824 0.450
M 2.845 0.550
D 2.624 1.000
BATCH CORRECTION
GRADE OF CONCRETE M-40
MATERIAL SSD WT. Wa M.C % FREE MOISTURE % FREE WATER ACTUAL WT.
CEMENT 430.00 0 0 0 430.00
10 MM 581.158 0.902 0 -0.902 -5.242 575.915
20 MM 581.158 0.882 0 -0.882 -5.126 576.032
SAND 779.171 0.577 3.46 2.883 22.463 801.634
SILICA FUME 21.50 0 0 21.50 21.5
ADMIXTURE 3.612 0 0 0 3.612
WATER 144.000 0 0 0 131.904
trial mix DATE29/09/2018
cement 11
factor 0.0261904762 SPANV2P-9 TO V2-A DECK SLAB
MATERIAL SSD WT. Wa M.C % FREE MOISTURE % FREE WATER ACTUAL WT.
CEMENT 420 0 0 0 0 11
10 MM 581.158 0.902 0 -0.902 -5.242 15.358
20 MM 581.158 0.882 0 -0.882 -5.126 15.355
SAND 779.171 0.577 3.46 2.883 22.463 19.819
SILICA FUME 21.50 0 0 0 0 0.563
ADMIXTURE 3.612 0 0 0 0 0.0946
WATER 144.000 0 0 0 0 3.455
slump i EPC Representative
slump 30 mins SHOBHAKANT
slimp 60 mins
slump 90 mins
ACTUAL WT.
430.00
575.915
576.032
801.634
21.5
3.612
131.904

CK SLAB
DIAPHARGM WALL
PART OF DECK SLAB
STRUCTURE
BOTTOM PLUG WELL STEINING WELL CAP EXPANSION JOINT
SL. No. Grade of Concrete M-25 M-30 M-35 M-40
AS PER APPROVED MIX DESIGN
CA:FA 60:40 60:40 60:40 62:38

AS PER APPROVED MIX DESIGN


20:10 50:50 50:50 50:50 50:50
COARSE AGG. % -4100.00% 58.00% 58.00% 61.00%
FINE AGG.% 42 43.00% 42.00% 39.00%
20 MM% 50.00% 50.00% 50.00% 50.00%
10 MM% 50.00% 50.00% 50.00% 50.00%
w/c 0.40 0.39 0.39 0.36
ALL IN AGG. VOL. 0.732 0.729 0.715 0.699
1 CEMENT 370.00 380.00 400.00 440.00
2 MASS OF 10 MM -42522.886 599.242 587.734 604.301
3 MASS OF 20 MM -42522.886 599.242 587.734 604.301
4 MASS OF SAND 80650.214 822.545 787.987 715.329
5 SILICA 0.00 0.00 0.00 0.00
6 ADMIXTURE 2.960 2.280 2.400 3.520
7 WATER 148.000 148.000 156.000 158.000
MATERIAL SP. GRAVITY WATER ABSORPTION
SAND 2.624 0.577
10 MM 2.824 0.902 LAB TECHNICIAN NO+918597380233
20 MM 2.845 0.882

AV. SP. GRAVITY 2.835


OF COARSE AGG.
PEDESTAL SEGMENT PIER SHAFT
M-50 M-55 M-60
62:38 62:38 62:38

50:50 50:50 50:50


62.00% 58.00% 58.00%
38.00% 42.00% 42.00%
50.00% 50.00% 50.00%
50.00% 50.00% 50.00%
0.32 0.32 0.32
0.714 0.707 0.696
420.00 430.00 440.00
627.388 581.158 572.115
627.388 581.158 572.115
711.944 779.171 767.048
21.00 21.50 26.50
3.528 3.612 3.732
141.000 144.000 149.000

18597380233
ADMIXTURE CALCULATIO
GRADE OF
CEMENT 10 MM 20 MM
CONCRETE
M 25 370 622.82 622.82
M 30 380 620.01 620.01
M 35 400 608.108 608.108
M 40 440 614.31 614.31
M 50 420 627.498 627.498
M 55 430 621.35 621.35
M 60 440 611.68 611.68
CALCULATION SHEET
ADMIXTURE
SAND SILICA FUME Admixture %
wt.
768.3 0 0.85% 3.145
765.15 0 0.60% 2.28
750.464 0 0.60% 2.4
696.98 0 0.80% 3.52
711.943 21 0.80% 3.528
705.96 21.5 0.90% 4.0635
691.004 26.5 0.80% 3.732
WATER
148
148
156
158
141
144
149
1wt of wet sample + container
2wt of dry sample + container
wt. of container
4wt. of water
5wt. of dry sample
6moisture content %

wt of dry sample
moisture %
wt of wet sample
wet of water

moisture %
484.71
479.00
342.00
5.71
137.00
4.17

137.00
4.170
142.71
5.71

4.17
M.T.C required for cement

Cement Grade of
Sl. No. Brand year
type cement Week No.
1 Star OPC 43 01 2017
2 Star OPC 43 02 2017
3 Star OPC 43 08 2017
4 Star OPC 43 33 2017
5 Star OPC 43 35 2017
6 Star OPC 43 38 2017
7 Star OPC 43 42 2017
8 Star OPC 43 44 2017
9 Star OPC 43 45 2017
10 Star OPC 43 47 2017
11 Star OPC 43 48 2017
12 Star OPC 43 49 2017
13 Star OPC 43 50 2017
14 Star OPC 43 51 2017
15 Star OPC 43 01 2018
16 Star OPC 43 02 2018
17 Star OPC 43 04 2018
18 Star OPC 43 05 2018
19 Star OPC 43 06 2018
20 Star OPC 43 07 2018
21 Star OPC 43 08 2018
22 Star OPC 43 09 2018
23 Star OPC 43 10 2018
24 Star OPC 43 11 2018
25 Star OPC 43 13 2018
26 Star OPC 43 14 2018
27 Star OPC 53 01 2018
28 Star OPC 53 03 2018
29 Topcem OPC 43 14 2018
30 Topcem OPC 43 15 2018
Project
Construction of Long Span High- Level Road Bridge over River Teesta w
Approaches near Haldibari, Connecting Sub- Divisional head quarter at
:-
Mekhligang/ Haldibari in the District of Coochbihar, West- Bengal Thr
Engineering ,Procurement & Construction (EPC) Mode.

Client :- Superintending Engineer North Bengal Construction Circle No. I

Authority Engineer :- LEA Associates South Asia Pvt. Ltd.

EPC Contractor :- S.P Singla Construction Pvt.Ltd.

Compressive Strength Of Concrete (As Per IS : 516)


Lab Job No: Design
Location Date of casting
Part of structure Tast Date
Age of cube in Days

Grade of Dimension Weight of cube CTM Reading in


SI NO. Density (gm/cc)
Concrete (mmxmmxmm) (gms) KN

150x150x150
1

2
3

Remarks

EPC Representative
vel Road Bridge over River Teesta with
ting Sub- Divisional head quarter at
ct of Coochbihar, West- Bengal Through
uction (EPC) Mode.

gal Construction Circle No. I

te (As Per IS : 516)

cube in Days

Compressive srength in
Average (N/MM2)
(N/mm2)
Authority's Representative

You might also like