Doc Ref.No.
1 X 80MW, ZAWAR CPP
ZAWAR MINES, RAJASTHAN 3VYN591602
We reserve all rights in this document and in the information therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
© ABB eBoP.
HINDUSTAN ZINC LTD
Doc Ref.No.
1 X 80MW, ZAWAR CPP
ZAWAR MINES, RAJASTHAN 3VYN591602
We reserve all rights in this document and in the information therein. Reproduction, use or disclosure to third parties without express authority is strictly forbidden.
© ABB eBoP.
HINDUSTAN ZINC LTD
Doc Ref.No.
1 X 80MW, ZAWAR CPP
ZAWAR MINES, RAJASTHAN 3VYN591602
LOAD IN
S.No. FEEDER/LOAD DESCRIPITION REMARKS
kVA
A BTG LOADS
1 SG/TG DCS 12 Reference has been taken from
UPS sizing calculation of HZL,
Phase-I, Unit-1. Vide Doc. No:
TCE.4221A-EL-CAL-580-01, R1,
Dated 08-09-2004
2 BOP DCS 6.5
7 VMS 0.75
8 EWLI 1.20
B BOP LOADS