Hydro-test Water Disposal Method Statement Project: Qurayat Power Plant Extensio1 n ill FOR APPROVAL Document No.: HWD/1412/01 Sie Prepared By). ‘Approved By: Rev.| Date Description (Gite Enging (Operations Manager) 0 19/04/16 _| Initial Issue Edwin Siason EJ Peter ] f = a aoe & METSCCO Heavy Steel Industries Co. Ltd. sem Ga SAUDI ELECTRICITY CO. (SEC) Saudi Services for Electro Mechanic Works Co. (SSEM) Hydro-test Water Disposal Method Statement Doc. No. HWD/1412/01, Rev.0 Revision Date: 04/19/2016 Project: Qurayyat Power Plant Extension Ill. JO: 14-12 Equipment Description: Storage Tanks. CONTENTS | C= Doc.No.: _HWD/1412/01, Rev.0 Hydro-test Water Disposal Method Statement Revision Date: 04/19/2016 Project: jO#: 14-12 | _Qurayyat Power Plant Extension Ill. Equipment Description: Storage Tanks 1. Purpose The purpose of this method statement is to provide guideline to ensure that the water used in the hydro-testing of the storage tanks is disposed in a controlled manner to the approved disposal area. 2. Scope This method statement is intended to be applied for disposing the used hydro test water from ‘tank No. 9 (Mfr. Tank No. 277) in Qurayyat Power Plant Extension Ill Project. 3. Method a. A6" Steel Pipeline will be installed from Tank No. 9 to the open vacant area outside the premise of tank area. (Note: Please refer to Pipe Lay out shown in reference drawing SK- 1412-LA01). b. The pipeline will be equipped with pumps, gate valves and non-return valve. c. Where the pipeline crossed the access road, a plate ramp will be provided and flange type connection will be used for easy removal of the pipe incase necessary. d. After hydro-testing of Tank No. 9, the water will be drained through the pipeline step by step, approximately 2 meter shell height every other day. . Accordingly the draining of hydro-test water is estimated to be complete in 12 days. 4. Record a. Record of the Water Draining Activity shall be maintained on the “Test Water Draining Log”, signed by the METSCCO OC Engineer, and SSEM/SEC representative/s. was al OM Gs ‘sem ™ Pago 30f3

You might also like