Professional Documents
Culture Documents
E-TENDER DOCUMENT
SCHEDULE OF TENDER:
1|Page
TECHNICAL BID
1. GENERAL:
Online bid for tenders on behalf of the President of India, are invited by the Controller General of
Patents, Designs and Trademarks under Two Bid System i.e. Technical Bid and Financial Bid
from reputed, experienced and financially sound Companies / Firms / Agencies having experience
in the field of Housekeeping, Security service, Technical service like maintenance of
electrical network (LT & HT), AC, plumbing, maintenance of Hardware maintenance of
computer including networking for providing Facility Management Services (FMS) to The
Patent Office and Trade Marks Registry, Kolkata located at the address mentioned below, initially for
two years from the date of taking up of providing facility management services in pursuance of
contract unless extended further by mutual consent of the Competent Authority and Contractor on the
same terms and conditions mentioned in the tender document and the contract agreement or
terminated under the terms of the tender/contract. The present requirement of the manpower given
below may be increased or decreased on the option of the Office.
The Controller General of Patents, Designs and Trademarks, Boudhik Sampada Bhawan,
S.M. Road, Antop Hill, Mumbai - 400 037.
ii) www.tenders.gov.in
iii) https://eprocure.gov.in/eprocure/app
2|Page
4. SCOPE OF WORK:
The separate manpower as shown below is required for two offices located in Intellectual
Property Building, Kolkata i.e., Patent Office and Trade Marks Registry. The scope of work
in these offices includes, but not limited to, carrying out Facility Management Services
(FMS) to these offices and various types of routine official work that may be assigned by the
officials of the Patent Office and Trade Marks Registry.
The scope of services under the Facilities Management Services, the details of which
are mentioned in Annexure I, are as follows:
I. Technical Services
(A)Operation & Maintenance
• LT Electrical Systems
• Plumbing & Sanitation
5. REQUIREMENT OF MANPOWER:
(a) The tender is for the supply of following manpower at Patent Office and Trade Marks
Registry, Kolkata at the minimum rate of wages under the Central Government
Minimum Wages Act, 1948, as applicable in Central Sphere under Construction
Category as on 03/04/2018. The number of manpower may be increased or
decreased at the discretion of the Office. The O/o CGPDTM is not governed by Shops
and Establishment Act or none of the provisions of Shops and Establishment Act is
applicable as O/o CGPDTM is a Govt. of India Office.
Property Building,
a) Intellectual
CP-2, Sector-5,
Salt Lake City,
Kolkata- 91
Phone: 033-23679101,
Fax No. 033-23671988
b) Nizam Palace,
2nd M.S.O. Building
7th Floor,
234/4, A.J.C.Bose Road,
Kolkata- 700020
The Earnest Money Deposit (EMD) of Rs. 200,000/- (Rupees Two lakhs Only), refundable
(without interest) shall be submitted with the Technical Bid of the agency in the form of
Demand Draft/Pay Order drawn in favour of "The Controller of Patents" payable at Kolkata,
failing which the tender shall be rejected summarily. EMD of unsuccessful tenderers shall be
released within 30 days of the work order is placed to the successful bidder.
4|Page
8. PERFORMANCE SECURITY DEPOSIT:
The successful tenderer will have to deposit a Performance Security Deposit of Rs.450, 000
(Rupees four Lakh fifty thousand only), in the form of Bank Guarantee/ Fixed Deposit receipt
from a commercial bank, within 21 days of receipt of the award of contract with The
Administrative Officer, Patent Office, Intellectual Property Building, CP-2, Sector-V, Salt
Lake, Kolkata -700 091 covering the initial period of contract of two years and additional
sixty days from the date of contract agreement. In case, the contract is further extended
beyond the period of two years, the deposit will have to be accordingly renewed annually by the
successful tenderer. In case of breach of any terms and conditions attached to this contract, the
Performance Security Deposit of the agency will be liable to be forfeited by the Department
besides annulment of the contract.
9. TERM OF CONTRACT:
The contract for supply of the below mentioned manpower initially will be given for two years
from the date of order issued by this office for facility management services after selecting the
personnel on the basis of interview. The period of the contract may be further extended
provided the requirement of the Department for the above manpower persists at that time, or, the
same may be curtailed/ terminated at any time before the normal tenure owing to deficiency in
service or substandard quality of manpower deployed by the selected Company/Firm/Agency.
The Controller General or a personnel authorized by him however, reserves right to terminate this
initial contract at any time after giving 15 days' notice to the selected service providing
Company/Firm/Agency.
a) Tender should be valid for a period of 90 days from the date of Opening of the
Financial bid.
b) However, the Controller General of Patents, Designs and Trademarks reserves the right to
cancel, amend or withdraw the tender at any stage or amend or withdraw any of the terms
and conditions contained in the Tender Document or to reject any or all tenders, without giving
any notice or assigning any reason whatsoever. The decision taken by him in this regard shall
be final and binding on all.
(c) The tender submitted with incorrect daily minimum wage rates for Highly skilled/Skilled/
Semi-Skilled/Unskilled categories, notified by the Government of India, Ministry of Labour &
Employment, Office of the Chief Labour Commissioner, New Delhi, as applicable in central
Sphere under Employment of sweeping and cleaning category, vide Order No. F.No.
1/10(5)/2018-LS-II dated 03/04/2018) and other statutory payments like rate and basis of EPF,
ESI shall be summarily rejected without any notice.
i) Tenders are invited under two bid system i.e. Technical Bid and Financial Bid.
ii) The bidders shall submit two online bid as "Technical Bid for Facility Management
5|Page
Services to The Patent Office and Trade Marks Registry, Kolkata" and as "Financial Bid
for Facility Management Services.
A. Technical Bid:
Technical bid shall be submitted in online marked as "Technical Bid for supply of highly
skilled, Skilled, Semi-skilled and Unskilled manpower for Facility Management
Services”.
(i) ANNEXURE-C (Technical Bid format for supply of providing Facility Management Services
(FMS) to the Patent Office and Trade Marks Registry, Kolkata)
(ii) Online copies of the following documents (attested by authorized signatory), should be
submitted, failing which a bid shall be summarily/out-rightly rejected:
1 Doc-1 Annexure-C
6|Page
(iii) The Technical bid should be accompanied with refundable Earnest Money Deposit (EMD), Rs.
200,000/- (Rupees two lakh Fifty Thousand only) in the form of Bank draft drawn in favour of "The
Controller of Patents" payable at Kolkata, failing which the tender shall be rejected out-rightly.
B. Financial Bid:
i) Financial Bid shall be submitted online marked as "Financial Bid for Facility
Management Services” in the format as provided in ANNEXURE-D.
(ii) The contractor shall pay the minimum rate of wages as applicable in Central sphere
under construction category notified by the Government of India, Ministry of Labour &
Employment, Office of the Chief Labour Commissioner New Delhi, vide order No. F.No.
1/10(5)/2018-LS-II dated 03/04/2018). The O/o CGPDTM is not governed by Shops and
Establishment Act or none of the provisions of Shops and Establishment Act is
applicable as O/o CGPDTM is a Govt. of India Office. The Office will neither accept nor
consider any other notification or circular whatsoever, other than the mentioned here
on minimum wages for the categories of manpower mentioned in the present tender
and contract. The Minimum daily Wages including VDA as on 03/04/2018 for the skilled,
semi-skilled and un-skilled categories of manpower required by the Patent Office and
Trade Marks Registry, Kolkata as mentioned in the said notification and acceptable to
this office are as under:
(iii) The tender submitted with less than the minimum wages, EPF, ESI shall be summarily rejected
without any notice.
(iv) Financial Bid i.e. Annexure D shall include the minimum wages as mentioned above ,
statutory payment payments towards ESIS and EPF, agency charges (which includes
Management Fee and other payments/statutory liabilities/extra wages, such as payment for
Gazetted Holidays declared by Government of India, compliance of Bonus Act, etc, other
expenses if any, which the bidder would pay to the workers). GST will be provided as per
prevailing rate and in compliance to the notifications of Government of India time to time.
(v) Financial evaluation shall be based purely on the total price quoted for all components
as specified in Annexure D. The bidder quoting in overall the lowest price shall be
awarded the work. The rate quoted by the Contractors in words shall be taken as correct
in case of any discrepancies between rates quoted in figure and in words.
(vi) In case the taxes, central minimum wages (Part of component A and Component C of
Annexure D) are increased/decreased by the Government, the same shall be payable by the
Office.
(vii) TDS will be deducted/recovered by the Office from the total admissible bill amount.
(viii) The Office shall not in any way be liable or responsible to pay any extra charges which do not
form the part of the financial bid.
(ix) The bidder alone will be responsible for payment of such other service benefits/statutory dues
and fulfill other financial obligations, required on his part by virtue of any law/regulations of any
public body of the Central Government, for the time being in force, to the personnel deployed by
him at IPO. The contractor shall also be liable to pay to the deployed workers the benefits
required to be extended by him under various labour statutory enactments.
(x) No overwriting or cutting is permitted in the Financial Bid Form. In such cases, the tender
shall be summarily rejected. However, the cutting, if any, in the Technical Bid Application must
7|Page
be initialed by the person authorized to sign the tender.
(xi) The conditional bids shall not be considered and will be rejected outright in the very first
instance.
i. The agency should have successfully managed and provided integrated Facility
Management Services (FMS) at least for three years in the immediate past in the
Govt./PSU and/or Private Sector. During the period of last three years, the agency
should have provided such Facility Management Services in at least one site of at least
5000 sq. mt. area, and with 150 networking computers.
iii. The agency must have experience of managing Horticulture work at a Government
Office/PSU / reputed private company during the last 3 years.
Business Background:
1. The bidder shall provide the information as to how many years has the firm been in
business and how many years under its present business name.
2. The bidder shall include a brief description about the firm’s growth (including revenue,
profitability and personnel) during the past five years and the growth expectations (for
the same categories) for the next five years.
3. The bidder should attach a current organizational chart and include the total number of
employees in your firm in India, location-wise.
The bidder shall provide satisfactory replies and details in respect of the following:
1. Has your firm, its subsidiaries or its parent companies, ever filed for bankruptcy?
2. Has your firm ever failed to complete work awarded to it?
3. Are there any judgments, claims, arbitration proceedings or suits pending or outstanding
against your firm or its officers?
4. Has your firm filed any lawsuits or requested arbitration with regard to any contract(s)
within the last five years?
5. Please provide a listing of your offices in India (with contact info, phone & fax
numbers, e-mail etc.) and a listing of the areas in which your firm has performed
Facilities Management Services.
8|Page
(b). Evaluation methodology
Technical evaluation:
The technical evaluation will be done only for the proposals submitted by the
Companies. The capability and eligibility of the Bidder shall be determined based on the
information provided by the Bidder i.e. experience in the field, presence of the Bidder at
multiple locations, manpower strength, etc.
2 No of sites where No. of sites 10 marks for each Address of the sites
services have location but each location along
been/are being MaximumMarks.40 with the details of
provided in last contract for each
three years location
9|Page
4. Methodology & Bidder’s usefulness Maximum 10 Presentation by
work plan to the Intellectual marks (to be Bidder’s authorized
Property office and evaluated by Representative; the
capability to perform the Technical bidder may also cite
the contract based on Committee) certifications of quality
bidder’s assets, such as ISO certificate for
client expense and providing such services.
competitive
advantage over other
companies.
Note (1): The minimum qualifying marks in technical evaluation shall be at least 60.
Proposals not securing a minimum of 60 marks in technical evaluation shall not be
considered for financial evaluation.
Note (2): The marks obtained in the technical evaluation will only serve for
screening the agencies for financial evaluation and will not be considered in the final
evaluation for selection of the agency.
b) Financial evaluation shall be based purely on the total price quoted for
Component (F), which includes all components, as specified in Annexure D
and the bidder quoting, in overall, the lowest price shall be awarded the work.
(c) Management Charges as specified in Component C of Annexure D shall be stated
clearly and shall include Management Fee of the bidder (Contractor) and all financial
liabilities towards workers deployed by him at IPO.
(d) IPO will not make any other payment other than specified in Annexure D i.e.,
i) Component A i.e. wages (Central Minimum wages and payment towards
ESIS and EPF),
ii) Component B i.e. salary of Facility Manager
iii) Component C i.e. Management Charges (which includes Management Fee
and other payments/statutory liabilities/extra wages, such as payment for Gazetted
Holidays declared by Government of India, Bonus, other expenses( Dress, including
10 | P a g e
winter dress, safety shoe etc.), which the bidder would pay to the workers and
iv) Component D i.e. GST : The bidder shall neither quote for anything else than
the above nor shall he claim any payment other than the above, after the contract is
awarded. However, in case the taxes and central minimum wages or any other
changes of any condition to comply the notification of Govt. of India same shall be
payable by this office.
( e) Payments shall also be subject to deduction of taxes at source as per applicable
laws.
(f) The total amount indicated in the Financial Bid shall be unconditional,
unequivocal, final and binding on the bidder. If any assumption or condition is
indicated in the Financial Proposal, it shall be considered as non-responsive and the
proposal shall be rejected.
(iv). The Office of the Controller General of Patents, Designs and Trade Marks
reserves the right to cancel the tender at any time.
(i) Interested Companies/Firms/Agencies shall submit the online bid for tender documents,
complete in all respects, on or before the last date and time of submission of tender. The
tender document submitted by online only.
(ii) Tenders will not be entertained after the deadline under any circumstances whatsoever.
(iii) A tender will not be considered if it is not as per the prescribed format. A tenderer shall sign and
stamp each page of this tender document and all other enclosures appended to it as a token of
having read and understood the terms and conditions contained herein.
(iv) A bid submitted without EMD or incomplete bid will not be considered and the same will be
rejected.
(v) All entries in the tender form should be legible and filed online clearly. If the space for furnishing
information is insufficient, a separate sheet duly signed by the authorized signatory may be
11 | P a g e
attached.
(vi) The Office takes no responsibility for delay, loss or non-receipt of the bid submitted through
online. A bid sent through Fax or email will not be accepted.
(vii) The CGPDTM or any person authorized by him reserves the right to accept/reject any or all the
tenders in part or full or divide the work among two or more parties and in such case
bidders/intending bidders, shall not have any claim on Office of Controller General of Patents,
Designs and Trade Marks.
Qualifications
(A) Electrician cum AC technician: - The person concern should process valid license to
handle LT. He should have 3 to 4 years of experience. He should have primary
knowledge about handling of ductable and split AC.
(B) The Plumber shall be an ITI Certificate holder with minimum 3-4 years of
experience, or 10 years’ experience in the same field.
(C) The Security personnel should be at least Secondary School (SSC) or equivalent
and below 50 years of age. He should be well built and fit and have training of
firefighting, rescue operation and preferably from Ex-serviceman or other state
force. He should have requisite experience in security services. The lady security
should have experience to handle security issues.
(D) Housekeeping Supervisor should be at least Madhyamik and have three years’
experience in Housekeeping. He will be in-charge of day to day activity in the
scope of the work of Housekeeping. He should have the experience of using
different chemical for the up keeping of this building. He will regulate the
manpower as per the requirement in a flexible manner. He will report to Facility
Manager in case of any difficulty. He will have to submit daily report of the activity
of the day to Facility Manager at the end of the day.
(F) The Facility Manager should at least possess Diploma in Electrical Engineering. Any
Management Diploma in the relevant field with 3-4 years’ experience to handle Facility
Management issues independently.
The Facility manager has to maintain the Register- Form IX, X, XI U/r 22, 26(1),
26(2) of the Minimum wage (Central) Rule 1950, Minimum wage Act 1948. Facility
Manager has to keep liaison with ESI and EPF authorities from time to time and shall
be responsible to address the grievances of the workers. Facility Manager is
responsible to produce all the documents, within the scope, as and when required by
IPO with one hour response time. Facility manager will report to IPO representative
time to time.
The contractor shall provide an emergency telephone number accessible for 24x7
hours and comply with the requirement during any break downs to essential utility
services like cable fault, burst water mains etc., within a maximum of one hour
response time.
13 | P a g e
(9) Indemnity
The contractor shall keep Intellectual Property Office and all officials of IPO
indemnified from and against all suits, losses, claims, demands, proceedings, and
liability of any nature or kind including costs and expenses, injuries to any person ,
damages to any property whatsoever, levy of fees or consequences which they may be
put to or suffer on account of the services undertaken by the contractor.
The Contractor shall keep the Intellectual Property Office and all officials of IPO,
indemnified from and against all suits, losses, claims, demands, proceedings, and
liability of any nature brought or instituted against them by any of contractor’s
employees or by any other third party in connection with, relating to or arising out of
the performance of the services or non-compliance, deficiency, non- implementation
of various provisions of statutory requirements.
The contractor shall also execute an indemnity bond in favour of CGPDTM, in the
standard format, in this regard.
(10) Insurance
The contractor shall ensure that all his employees posted at IPO are adequately
insured & covering each incidence for personal injury caused or arising out of the
performance of the services
The Contractor shall keep the employer, its servants or agents indemnified against
claims, actions or proceedings brought or instituted against the employer, its
servants or agents by any of contractors’ employees or any other third party in
connection with, relating to or arising out of the performance of the services under
the agreement.
The contractor is also required to obtain the third party insurance for each incident
The contractor shall also require obtaining workmen compensation policy for each
employee and covering all the staff deployed at site during the contract period.
The supporting documents in respect of insurance should be produced within one
month of taking over the charge.
1. The contract shall commence from the date of receipt of acceptance of the work order by the
14 | P a g e
tendering Company/Firm/Agency which shall be accepted within 10 days from the receipt of
the work-order or within 15 days from the date of issue of the said order whichever is earlier
and shall continue till two years unless it is curtailed or terminated by the Controller General
of Patents , Designs and Trade Marks or a person authorized by him owing to deficiency of
services, sub-standard quality of Skilled/Semi-skilled/Unskilled manpower deployed, breach of
contract, reduction or cessation of the requirements etc.
2. The contract may be extended, on the same terms and conditions or with some
addition/deletion/modification, for a further specified period.
3. The contracting Company/Firm/Agency shall not be allowed to transfer, assign, pledge or
sub-contract its rights and liabilities under this contract to any other agency without prior
written consent of this Department.
4. The present requirement of Skilled, Semi-skilled and Unskilled manpower has been
mentioned in the tender document. The requirement of the Department may increase or
decrease during the tenure of the contract. In case of decrease in the requirement, the same
will be informed to the contractor and additional manpower may be withdrawn immediately
thereafter. The contractor shall provide additional manpower, if required, on the same terms
and conditions.
5. All selected manpower shall wear Identity card and formal uniform, provided by the
Contractor, every day during the working hours.
6. The contractor will be bound by the details furnished by him to this Department, while
submitting the tender or at any subsequent stage. In case any of such documents furnished
by him/her is found to be false at any stage, it would be deemed to be a breach of terms of
contract making him liable for legal action besides termination of contract.
7. No variation in or modification of the terms of the Contract shall be made except by written
amendment signed by the parties.
8. The Competent authority of this Department reserves the right to withdraw/relax any of the
terms and conditions mentioned above so as to overcome the problem encountered by the
contracting parties.
9. The contracting Company/Firm/Agency shall attach a copy of valid labour license from the
Regional Labour Commissioner for the specific number required for the contract under
Contract Labour (Regulation & Abolition) Act, 1970.
10. The contracting Company/Firm/Agency shall sign the Contract agreement as per ANNEXURE-
"E" after finalization of the tender process but before the issue of work order/Letter of Intent.
11. The successful tenderer will have to deposit a Performance Security Deposit of
Rs.450,000(Rupees four lakh fifty thousand only), in the form of Bank Guarantee/ Fixed
Deposit receipt from a commercial bank, within 21 days of receipt of the award of contract
with The Administrative Officer, Patent Office, Intellectual Property Building, CP-2,
Sector-V, Salt Lake, Kolkata - 700 091 covering the initial period of contract of two years
15 | P a g e
and additional sixty days from the date of contract agreement. In case, the contract is
further extended beyond the period of two years, the deposit will have to be accordingly
renewed annually by the successful tenderer.
12. EMD will be returned to the successful tenderer after depositing performance security. Further,
if the agency fails to deploy the required number of skilled/Semi-skilled manpower (Data Entry
Operators) and unskilled manpower against the initial requirement within 10 days from the date
of receipt of the order or within 15 days from the date of issue of the order, whichever is earlier,
the EMD will stand forfeited without giving any further notice.
13. The EMD in respect of the agencies, which do not qualify in Technical Bid (First
Stage)/Financial Bid (Second Stage,) shall be returned to them without any interest.
14. The proceeds of the performance security shall be payable to the office as compensation for
any loss resulting from the contractor's failure to complete its obligations under the Contract.
15. In case of breach of any of the terms and conditions attached to this contract, deficiency in
service or substandard quality of manpower deployed by the Contractor, the Performance
Security Deposit of the agency will be liable to be forfeited by the Department besides
annulment of the contract and the Controller General or a personnel authorized by him reserves
the right to terminate the contract at any time during the tenure, after giving a 15-days' notice to
the contracting agency ,in such circumstances.
16. The contractor shall pay the minimum rate of wages as applicable in Central sphere under
construction category, notified by the Government of India, Ministry of Labour & Employment,
Office of the Chief Labour Commissioner New Delhi, vide order No F.No. 1/10(5)/2018-LS-II
dated 03/04/2018). The O/o CGPDTM is not governed by Shops and Establishment Act or
none of the provisions of Shops and Establishment Act is applicable as O/o CGPDTM is a
Govt. of India Office. The Office will neither accept nor consider any other notification or
circular whatsoever, other than the mentioned here on minimum wages for the categories of
manpower mentioned in the present tender and contract. The Minimum Wages including VDA
as on F.No. 1/10(5)/2018-LS-II dated 03/04/2018) for the highly skilled, skilled, semi-skilled and
un-skilled categories of manpower required by the Patent Office and Trade Marks Registry,
Kolkata as mentioned in the said notification only are acceptable to this office and the same
along with all other liabilities should be clearly stated in the financial bid.
17. The Contractor will be responsible for timely payment (Within 7th of every month and before
3p.m.) to the supplied manpower and statutory authorities and compliance of all statutory
provisions relating to minimum wages, Provident Fund and Employees State Insurance etc. in
respect of the persons deployed by him in this Office without assigning any reason whatsoever.
18. The Contractor shall also be liable for depositing all taxes, levies, cess etc. on account of
service rendered by him to the Office to the concerned tax collection authorities from time to
time as per extant rules and regulations on the matter.
19. Disbursement of wages with proper payment sheet showing details of the payment to the
16 | P a g e
workers deployed in this department should be ensured by the service providing agency. The
payment should be disbursed before a designated officer of this office.
20. The Tax Deduction at Source (TDS) shall be made as per the provisions of the Income Tax
Department, as amended from time to time, and a certificate to this effect shall be provided to
the agency by this Office.
21. The contracting agency shall ensure that the individuals deployed against highly skilled, Skilled,
Semi-skilled and Unskilled manpower for Facility Management Services in the Patent Office
and Trade Marks Registry, Kolkata conform to the technical requirements of age, educational
qualification and experience prescribed in the tender document.
22. The Controller General of Patents, Designs and Trademarks is a Central Government Office and
has five days working (i.e. Monday to Friday) in a week from 9.30 AM to 6.00 PM with a lunch
1
break of /2 hrs. from 1.30 PM to 2.00 PM. Besides this the Department observes the Gazetted
holidays notified by the Government of India from time to time. Skilled/semi-skilled and unskilled
manpower are required to work from Monday to Saturday as per above mentioned timing.
Gazetted holidays will be treated as Paid Holiday; however, the liability for Gazetted Holidays will
have to borne by the Agency. They may also be required to attend the office as and when
required on Sunday/ holiday.
23. The contracting Company/Firm/Agency shall furnish the following documents in respect of the
individual employee deployed by them in this Office before commencement of the work:
25. The contractor shall replace immediately any of its personnel who are found unacceptable
to this Department because of security risks, incompetence, conflict of interest, improper
conduct, frequent and / or unwarranted absence etc. upon receiving an intimation or notice
from the officer in-charge.
26. The persons deployed shall be required to report to the Administrative Officer or in-charge from
17 | P a g e
Patent Office and Trade Marks Registry, for duty at 9.30 AM and before leaving the office at
6.00 PM.
27. The contractor shall depute a Facility Manager in this Office who would be responsible for
immediate interaction with the competent authority so that optimal services of the persons
deployed by the agency could be availed without any disruption.
28. The selected agency shall immediately (within three days) provide a substitute in the event of any
person leaving the job due to his/her personal reasons.
29. It will be the responsibility of the contractor to meet transportation, food, medical and any other
requirements in respect of the persons deployed by him. The Office of Controller General of
Patents, Designs and Trademarks and the Patent Office/ Trade Marks Registry, Kolkata will have
no liability in this regard.
30. For all intents and purpose, the contractor shall be the "Employer" within the meaning of different
Labour Legislations in respect of manpower so employed and deployed by it in this Office. The
persons deployed by the contractor in the Patent Office and Trade Marks Registry, Kolkata shall
not have any claims of Master and Servant relationship nor have any principal and agent
relationship or employer/ employee relationship with or against the Office of Controller General of
Patents, Designs and Trade Marks Registry and The Patent Office and Trade Marks Registry,
Kolkata.
31. The Service providing agency shall be solely responsible for the redress of grievances/resolution
of disputes relating to persons deployed. This Office shall, in no way, be responsible for
settlement of such issues whatsoever.
32. This Office shall not be responsible for any damages, losses, claims, financial or other injury to
any person deployed by service providing agency in the course of their performing the
functions/duties, or for payment towards any compensation.
33. Manpower deployed by the contractor shall not have any claim or be entitled to pay, perks and
other facilities admissible to casual, ad-hoc, regular/confirmed employees
of this Department during the term or after expiry of the contract.
34. In case of termination of this contract on its expiry or otherwise, the persons deployed by the
service providing agency shall not be entitled to and will have no claim for any absorption nor for
any relaxation for absorption in the regular/any other capacity in the Department.
35. All the issues related to contract, monthly payments etc. shall be communicated and processed
through the Coordinator in the Patent Office / Trade Marks Registry, Kolkata nominated by the
Head of Office.
36. The contractor shall maintain all statutory registers under the applicable law and shall produce
the same, on demand, to the concerned authority of this Office or any other authority under law.
37. In case, the contractor fails to comply with any statutory/taxation liability under appropriate law,
and as a result thereof the Patent Office/Trade Marks Registry/ /office of Controller General of
patents, designs and Trade Marks/their representative is put to any loss/obligation, monetary or
otherwise, the office will be entitled to get itself reimbursed out of the outstanding bills or the
Performance Security Deposit of the contractor, to the extent of the loss or obligation in
monetary terms.
38. The contractor shall keep the Patent Office, Trade Marks Registry and Office of Controller
18 | P a g e
General of Patents, Designs and Trade Marks / their representative indemnified against claims,
if any, of the workmen and all costs and expenses as may be incurred by the contractor in
connection with any claim that may be made by any of his deployed workmen.
39. The Contractor shall keep the Patent Office, Trade Marks Registry and Office of Controller
General of Patents, Designs and Trade Marks/their representative indemnified against the claims,
actions or proceedings brought or instituted against the Patent Office/ Trade Marks
Registry/Office of Controller General of Patents, Designs and Trade Marks/their representative by
any of contractors' employees or any other third party in connection with, relating to or arising out
of the performance of the services under this agreement.
40. The person deployed by the service providing agency shall not have any claim or be
entitled to pay, perks and other facilities admissible to casual, ad-hoc, regular/confirmed
employees of IPO during the currency or after expiry of the contract. The Service providing
agency shall be solely responsible for the redressal of grievances/resolution of
disputes relating to person deployed. IPO shall, in no way be responsible for settlement of
such issues whatsoever.
41. IPO shall not be responsible for any damages, losses. Claims, financial or other injury to
any person deployed by service providing agency in the course of their performing the
functions/duties, or for payment towards any compensation during their deployment period.
42. In case of termination of this contract on its expiry or otherwise, the persons deployed by
the service providing agency shall not be entitled to and will have no claim for any
absorption nor for absorption nor for any relaxation for absorption in the
regular/otherwise capacity in IPO.
The contractor will be required to submit the list of the workers with photo ID, address
proof, police verification certificate and educational qualifications before deputing
the workers. The contractor shall be solely responsible for the credentials / acts of his
staff /workers.
T h e workers / staff employed should be well groomed and shall wear color code
uniforms, pant+ shirt+ shoes+ cap+ gloves for male and suit/salwar+ aprons +
cap+ gloves for ladies staff. The Security personnel should be in Pant, Shirt,
Shoes, Cap, and Tie. In winter season all the workers/staff and security personnel
should be in colour coded jacket. Uniform should be with company logo. Any
indecent behaviour or suspicious activities of the Staff employed shall be viewed
seriously and a suitable penalty as per Annexure III shall be levied on the
contractor. The contractor will be required to submit daily labour report duly signed
by Facility Manager to the IPO.
The contractor is required to make timely payment (within 7th of every month) to
his staff as per quoted price. The contractor must employ adult and skilled labour
19 | P a g e
only. Employment of child labour will lead to termination of the contract.
The contractor shall arrange adequate training by trained personnel in firefighting
to all the staff deputed by him right in the beginning and also from time to time at
frequent intervals.
The Contractor shall maintain registers and checklists for each activity and the works
done by each of the contractor’s men shall be recorded on a Job Card, duly signed by
the Supervisor. The Contractor shall also submit a comprehensive report every
month, detailing the works/services done during the month.
The contractor shall make available members of his staff deployed at IPO to the
office for assisting in miscellaneous type of work as and when required.
The contractor shall ensure that cell phone facility is available with at least seven
of his staff in addition to the Facility Manager to facilitate easy access in day-to-
day work and in times of need.
The contractor shall provide the details showing number of workers employed,
categories, working hours and salaries etc. and shall keep public notice about the
same at an appropriate place as designated by IPO,
(D). Materials
The material and consumables will consist of consumables for cleaning, basic
engineering tools, cleaning equipment (on rental basis, if any) and the like.
All consumables materials and other related items will be provided by the office.
The contractor shall assess the quantity of consumables to be used for cleaning
and other services in monthly basis.
The consumable register shall be maintained by the facility manager. The statement
of consumed and balance items should be submitted to IPO at the end of month.
20 | P a g e
market by the purchase committee constituted.
For the items of estimated expenditure above Rs. 10000/-, the facility manager
shall submit a requisition to the IPO and shall coordinate with the designated
officer-in-charge for FMS and/or purchase committee if necessary, to facilitate the
purchase procedure. He shall provide suggestions in writing on the markets, rates,
specifications of the product and any other details if necessary using his
expertise. No additional payment shall be released for labour/conveyance,
transportation, etc. Decision of the IPO in this matter shall be final and binding on
the contractor.
As regards maintenance, replacement of consumable items, the same shall
be done as defined in the scope of work. No conveyance / labour charges /
transportation charges will be payable for maintenance and replacement works. If
the contractor does not take up such works, IPO reserves the right to take up the
same through other agency at the cost of the contractor.
1. The contractor shall raise bills for Patent Office, in triplicate for each office, along with
attendance sheet duly verified by the Administrative Officer, in respect of the persons deployed
in each office, in the first week of the succeeding month. As far as possible, the payment will
be released within 60 days thereupon.
2. The monthly bills shall be accompanied with the documentary proof for remittance of Employees
State Insurance, Employee Provident Fund and GST etc. pertaining to the concerned month's
bill.
3. The bills submitted to Patent Office/Trade Mark Registry shall be accompanied with a
consolidated statement clearly indicating the details of wages of each person, deduction
towards ESI, EPF, etc. The bills submitted without the proof on remittance of ESI, EPF and
without the attendance register signed by designated officer of Patent Office and Trade Marks
Registry, detailing of wage calculation and management fees and consolidated statement
reached thereupon will not be processed till such details are provided.
4. he amount of pre-estimated agreed liquidated damages calculated @ Rs. 250/- per day on
account of delay, if any, in providing a suitable substitute for the period beyond three working
days by the agency shall be deducted from the monthly bills of the service providing
Agency/Firm/Company in the following month. However, in case the taxes and central
minimum wages are increased by the Government, the same shall be payable. TDS
21 | P a g e
will be deducted/recovered by IPO from the total admissible bill amount.
13. TERMINATION
This agreement may be terminated by either party by giving three months' notice, in writing, of the
intention to terminate without specifying any reason(s) for termination. On termination of the
contract, the contractor shall take immediate steps to withdraw all employees in a smooth and
orderly manner.
Neither party shall be in breach of any obligation under this contract if it is unable to perform that
obligation in whole or part by reason of Force Majeure. If either party seeks to rely on this clause,
it shall immediately give notice to the other with full particulars of the matter claimed as a Force
Majeure event. The parties so affected shall take all reasonable steps to remedy the failure to
perform and to keep the other party informed of the steps being taken to mitigate the effects of
Force Majeure.
In the event of Force Majeure lasting for more than three months, either party may, following
consultation with the other, give a notice of termination.
In case the statutory minimum wages [component A] increases, the office shall
make the payment at the enhanced rate on production of the proof of
increase in statutory minimum wages (Central Sphere Document) and demand letter.
No other demands as regards enhancement or increase shall be considered or paid by
the office which is not in conformity with Annexure D.
(14). Compliance with all Statutory requirements
The contractor shall be responsible to pay to the staff deployed at IPO at the
rate of minimum wages as notified by Ministry of Labour, Govt. of India, as
per the following categories of employment listed in schedule of employment of
the Central Sphere and minimum wages for each category mentioned therein:
22 | P a g e
Sl. Personnel Required Minimum wages for Scheduled Employment as per Central
No. by IPO sphere
AC technician
Note i) Contribution towards ESIS and EPF ( employer’s contribution) will be in addition to
the minimum wages as above.
The contractor will have to bear the cost of all stationery, telephone, etc.
required for proper execution and maintenance of record of his work. IPO shall
provide a separate room for Facility Manager for his functioning in IPO premises.
(17). Dispute & Differences
Decision of the Controller General of Patents, Designs and Trademarks regarding
performance of contract, levy of compensation for delay and payments for extra
work done shall be final and binding on the contractor. However, any dispute
23 | P a g e
arising out of this contract can be referred to an Arbitrator appointed by the
CGPDTM.
(18). Termination
This contract may be terminated by either party by giving three months’ notice in
writing of the intention to terminate without specifying any reason(s) therefor.
On termination of the contract, the contractor shall take steps to withdraw all
employees and the services provided in a smooth and orderly manner.
In addition, the contractor shall cause to be delivered to the IPO all details, plans,
technical data, maintenance schedules, related data correspondence and
documentation in his possession relating to the Services including all the equipment
/tools purchased from the contractual cost paid by IPO . IPO shall also cause to pay
all sums due to the contractor as provided under this contract.
Safety Requirements:
The contractor shall at his own expenses provide safety measures and facilities related
thereto to the manpower deployed at site. These measures/facilities to be provided by
the contractor shall also include helmets, safety belts, gloves, who shall also take
adequate steps ensuring their proper use. Adequate provisions shall also be made by
the contractor for prompt evacuations, transportation and all medical treatments to the
workers in the circumstance of any accident/injury during the course of work at site.
The contractor shall initiate and maintain safety management program to protect his
employees from the likely hazards which may arise while performing their duties and
adopt proper procedures, practices and regular inspection of the work areas, materials,
equipment, information and training necessary for safe work performance.
i) List of Skilled, Semi-skilled and Unskilled manpower shortlisted by the Patent office and
Trade Mark Registry, Kolkata for deployment in the office as mentioned in the document
containing full details i.e. date of birth, marital status, address etc. shall be provided.
24 | P a g e
ii) Bio-Data of all persons.
iii) Character Certificate from a Group 'A'/Class-I Gazetted Officer of the Central/State
Government in respect of all persons.
iv) Certificate of verification of antecedents of all persons by local police authority.
v) Contract agreement duly signed as per Annexure "E"
vi) Data Security Certificate as per Annexure "F"
vii) Bank Guarantee Bond Annexure "G"
25 | P a g e
Annexure- 'A'
To
THE CONTROLLER OF PATENTS / REGISTRAR OF TRADE MARKS
THE PATENT OFFICE / TRADE MARKS REGISTRY
INTELLECTUAL PROPERTY BUILDING,
CP-2, SEC-V, SALT LAKE,
KOLKATA - 700 091
Sir/Madam
I/We hereby accept unconditionally all the terms and conditions as contained in tender
documents as well as notice inviting tenders (NIT) and in default thereof, to forfeit and
pay to CGPDTM, or its successors or its authorized nominees such sums of money as
are stipulated in the notice inviting tenders and tender documents.
SIGNATURE OF TENDERER
ADDRESS: -------------------------------------------------------------------------------
SEAL OF TENDERER
SIGNATURE OF WITNESS
OCCUPATION:
26 | P a g e
Annexure- 'B'
(a) I/We agree to abide by and fulfill all terms and conditions referred to above and as contained in
tender documents elsewhere and in default thereof, to forfeit and pay to CGPDTM, or its successors
or its authorized nominees such sums of money as are stipulated in the notice inviting tenders and
tender documents.
(b) I/We hereby pay the earnest money of amount as mentioned in the Tender in favour of Controller of
patents, payable at place as mentioned in the Tender/notice inviting tenders (NIT)
(c) If I/We fail to provide the desired manpower as per the order/ Letter of Intent within 15 days of the
date of issue of Letter of Intent or 10 days from the receipt of the letter awarding the contract and/or
l/we fail to sign the agreement as per contract and/or l/we fail to submit performance guarantee as
per contract, l/we agree that CGPDTM/Patent Office/Trade Marks Registry/their authorized
representative shall, without prejudice to any other right or remedy, be at liberty to cancel the Letter
of Intent and to forfeit the said earnest money as specified above.
(d) l/we am/are also enclosing herewith the Acceptance Letter on the prescribed proforma.
SIGNATURE OF TENDERER
ADDRESS: --------------------------------------------------------------
SEAL OF TENDERER
SIGNATURE OF WITNESS------------------------------------------
OCCUPATION -------------------------------------------------------------
27 | P a g e
ANNEXURE - ‘C’
TECHNICAL BID
For providing Skilled, Semi-skilled and Unskilled manpower to the Patent Office and Trade Marks Registry,
Kolkata under the office of the Controller General of Patents, Designs and Trademarks.
11. Financial turnover of the tendering Company/Firm/Agency for the last 3 financial years.
(Attach separate sheet if space provided is insufficient)
2015-16
2016-17
2017-18
28 | P a g e
12. Give details of the major similar contracts handled by the tendering
Company/Firm/Agency during the last three years in the following format:
13. (If the space provided is insufficient, a separate sheet may be attached)
14. Additional information, if any(Attach separate sheet, if required)
2. I have carefully read and understood all the terms and conditions of the tender and undertake to
abide by them:
3. The information/documents furnished along with the above application are true authentic to the
best of my knowledge and belief. I/We am/are well aware of the fact that furnishing of any false
information/fabricated document would lead to rejection of my tender at any stage besides
liabilities towards prosecution under appropriate law:
29 | P a g e
ANNEXURE D
FINANCIAL BID
For providing Facility Management Services to the Patent Office and Trade Marks Registry,
Kolkata under the office of Controller General of Patents, Designs and Trademarks.
5. Rate are to be quoted per person/per day (excluding half an hour lunch break) inclusive of all
statutory liabilities, taxes, levies, / Education Cess etc. with the following break up:
Total
Com Minimum Statutory Statutory Total
Type of No. of No. of Supervisory Total Total Pay Wages
pone Wages EPF ESI (In Rs.)
Manpower Persons Days Allowance Wages (vii x iv) (viii +ix +
nt (In Rs.) (13.36 %) (4.75%) (xi x iii)
x)
i ii iii iv v vi vii viii ix x xi xii
(A)
House
1 15 26 553 553
keeping
2 Gardener 1 26 612 612
Electrician
3 cum Ac 3 26 673 673
Technician
Plumber
cum
4 1 26 673 673
Multitasking
staff
Security
5 9 26 673 673
(UNARMED)
Lady
6 1 22 673 673
Security
Security
7 (Armed)
1 26 732 732
Hardware
8 Maintenance 3 26 732 732
Technician
Facility
(B) 1 26 732 732
Manager
Management Charge as fixed % of Total of Component A (Comprising management
Management fee and other payments/statutory liabilities/extra wage, such as wage for holidays,
(C) Bonus, etc. which the bidder would pay for engaged manpower) %
Fees
30 | P a g e
(D) GST Tax includes all taxes as applicable including GST
Total(Component A+B+C+D)
Notes:
N.B.:
1. The rates quoted by the tendering agency should be inclusive of all statutory/taxation liabilities at the time of
entering into the contract.
2. The payment shall be made on conclusion of the calendar month only on the basis of number of working
days for which duty has been performed by each manpower.
3. In Component B, the rates quoted by the Bidder should be inclusive of Management Fee and also other
31 | P a g e
payments/ statutory liabilities/extra wages, if any, which the Bidder would pay to the workers as applicable at
the time of entering the contract
4. For Component A, the monthly wages shall be calculated by multiplying daily wage rate with 26 days
5. The minimum wages stated in component A, shall be the up to date minimum wages of central sphere as on
03/04/2018, as notified in the order as mentioned above by the Ministry of Labour, Govt. of India.
6. The above table has been shown for calculating the lowest bidder among the pool of eligible bidders. Actual
payment shall be made as per point 2 above.
32 | P a g e
ANNEXURE'E'
CONTRACT AGREEMENT
WHEREAS the contractor agrees to supply the Skilled/Semi-skilled/Unskilled manpower to perform the
work specified to them successfully on contract basis, as mentioned in the tender document, to the Patent
Office and Trade Marks Registry, Kolkata under the Office of Controller General of Patents, Designs and
Trademarks, Boudhik Sampada Bhawan, S.M. Road, Antop Hill, Mumbai 400037;
AND WHEREAS the Contractor agrees to supply the manpower initially required by this office as under
and as per the rates not less than the rates of minimum wages for the required categories as per Central
Minimum Wages Act, 1948 as notified by the Government of India, Ministry of Labour & Employment,
Office of the Chief Labour Commissioner, New Delhi, Order No. F.No. 1/10(5)/2018-LS-II dated
03/04/2018, which are as under and, further agrees to work with the agency charges and other liabilities
charges as given below which are inclusive of all statutory/taxation liabilities at the time of entering into the
contract;
Total
Com Minimum Statutory Statutory Total
Type of No. of No. of Supervisory Total Total Pay Wages
pone Wages EPF ESI (In Rs.)
Manpower Persons Days Allowance Wages (vii x iv) (viii +ix +
nt (In Rs.) (13.36 %) (4.75%) (xi x iii)
x)
i ii iii iv v vi vii viii ix x xi xii
(A)
House
1 15 26 553 553
keeping
2 Gardener 1 26 612 612
Electrician
3 cum Ac 3 26 673 673
Technician
Plumber
cum
4 1 26 673 673
Multitasking
stuff
Security
5 9 26 673 673
(UNARMED)
Lady
6 1 22 673 673
Security
Security
7 (Armed)
1 26 732 732
Hardware
8 Maintenance 3 26 732 732
Technician
Facility
(B) 1 26 732 732
Manager
Management Charge as fixed % of Total of Component A (Comprising management fee
Management
(C) and other payments/statutory liabilities/extra wage, such as wage for holidays, Bonus, %
Fees etc. which the bidder would pay for engaged manpower)
33 | P a g e
(D) GST Tax includes all taxes as applicable including GST
Total(Component A+B+C+D)
AND WHEREAS the Controller General of Patents, Designs and Trademark (through " Patent
Office and Trade Marks Registry, Kolkata") has agreed to the above quoted rates for supply of the
said manpower;
NOW THEREFORE both the parties agree to the terms and conditions hereinafter
mentioned viz.: -
(i) that it is expressly understood and agreed between the parties to this Agreement that the persons
deployed by the contractor for the services mentioned above shall be the employees of the
contractor for all intents and purposes and that the persons so deployed shall remain under the
control and supervision of the contractor and in no case, shall a relationship of employer and
employee between the said persons and the CGPDTM or Patent Office or Trade Marks
Registry, Kolkata or any person authorized shall accrue/arise implicitly or explicitly.
(ii) that the number of Skilled/Semi-skilled/Unskilled manpower deployed in the Patent Office and
Trade Marks Registry, Kolkata shall be purely need based. Therefore, the number of
Contractor's workers may be increased or decreased as per the requirement. Patent Office and
Trade Marks Registry, Kolkata will be under no obligation to engage any specific number of
Contractor's workers during the period of contract.
(iii) that this Contract shall remain valid for a period of two years w.e.f ....................................................
initially and if the services are found satisfactory the same may be extended for further period.
(iv) that notwithstanding to the para (iii) above, the Controller General of Patents, Designs and
Trademarks or a person authorized by him shall have full power to terminate the contract if the
manpower supplied is not functioning to the satisfaction.
(v) that the Controller General of Patents, Designs and Trademarks or a person authorized by him shall
have full power to reject the Employee which to the true intent and meaning is not in accordance with
the requirement of the tender document.
(vi) that the contracting agency will deposit a sum of Rs. 4,50,000/- (Rupees Four Lakh Fifty
Thousand only) as Performance Security Deposit in the form of Bank Guarantee/ Fixed Deposit
receipt from a commercial bank with The Administrative Officer, Patent Office, Intellectual
Property Building, CP-2, Sector-V, Salt Lake, Kolkata - 700 091 covering the period of contract
of two years and additional sixty days from the date of contract agreement as security for
compliance with the terms and conditions of this contract and also that, in case the contract is
further extended beyond the initial period of Two year, he will accordingly renew annually the
Performance Security Deposit.
(vii) that in case of breach of any terms and conditions attached to this contract or deficiency in service
or substandard quality of manpower deployed by the Contractor, the Performance Security Deposit
of the agency will be liable to be forfeited by the Office besides annulment of the contract. In such
circumstances the Controller General of Patents, Designs and Trademarks or a person authorized by
him reserves the right:
to terminate this contract by giving notice of 15 days in advance any time during the contract
or
34 | P a g e
to enter in to parallel contract for similar services with other agencies/person whenever it is found
necessary.
(viii) that the contracting agency will be entirely responsible for execution of this contract in all
respects in accordance with the conditions of this contract and shall not assign or sub-let the same.
(ix) that, if the contracting agency becomes insolvent or he or his Agent offers any bribe in
connection with the contract or the contractor fails to observe or perform any condition of this
contract, then, notwithstanding any previous waiver of such default or action being taken under any
other clause hereof, the Controller General of Patents, Designs and Trademarks or a person
authorized by him may terminate the contract and forfeit the said deposit and recover from the
contractor any loss suffered by the Government on account of the contract being terminated.
(x) that, if any dispute or difference shall arise including this contract, the settlement of which is not
hereinbefore provided for the same, shall be referred to the arbitration of the Controller General of
Patents, Designs and Trademarks or, if he is unable or unwilling to act as arbitrator, to the arbitration
of any person nominated by him in writing and the decision of such arbitrator shall be final and
binding on the parties to this contract.
(xi) that the contracting agency, as a taxable service provider, must have registered with Central
Service Tax Department and obtained Registration No. (15 digits GSTIN Code Number) and would
attach a copy of Certificate along with the Agreement. The Invoices / Bills / Challans will be serially
numbered and shall contain the Name and address of Service Provider, Service Receiver,
Description of service, Value of GST payable thereon.
(xii) that the contracting agency shall also be responsible for timely statutory payments in respect of
supplied manpower and there shall not be any responsibility of the Controller General of Patents,
Designs and Trademarks or a person authorized by him and the Patent office/Trade Marks Registry,
Kolkata.
(xiii) that the contractor shall keep the CGPDTM or any person authorized by him or Patent Office or
Trade Marks Registry, Kolkata indemnified against all claims whoever in respect of the employees
deployed by the contractor and, also that, in case any employee of the contractor so deployed enters
in dispute of any nature whatsoever, it will be the primary responsibility of the contractor to contest
the same and, further that, in case CGPDTM or any person authorized by him or Patent Office or
Trade Marks Registry, Kolkata is made party in any case related to this contract and is supposed to
contest the case, the CGPDTM or any person authorized by him or Patent Office or Trade Marks
Registry, Kolkata will be reimbursed for the actual expenses incurred towards Counsel Fee and other
expenses which shall be paid in advance by the contractor to the CGPDTM or any person authorized
by him or Patent Office or Trade Marks Registry or , Kolkata on demand.
(xiv) that the contractor will ensure that no financial or any other liability comes on CGPDTM or any
person authorized by him or Patent Office or Trade Marks Registry, Kolkata in this respect of any
nature whatsoever and shall keep CGPDTM or any person authorized by him or Patent Office or
Trade Marks Registry, Kolkata indemnified in this respect.
(xv) that the contractor shall further keep the CGPDTM or any person authorized by him or Patent
Office or Trade Marks Registry, Kolkata indemnified against any loss to the CGPDTM or any person
authorized by him or Patent Office or Trade Marks Registry, Kolkata property and assets and, further
that, the CGPDTM or any person authorized by him or Patent Office or Trade Marks Registry,
Kolkata shall have right to adjust and/or deduct any of the amounts as aforesaid from the payments
due to the contractor under this contract.
(xvi) that the contracting agency shall be responsible for faithful compliance of the terms and
conditions of this agreement, and shall also abide by all the terms and conditions as mentioned in the
tender document, failing which the same may be terminated and the security deposit will be forfeited
and, further, the work may be got done from another agency at the risk and cost of the Contractor.
(xvii) that, if the contractor violates any of the terms and conditions of this agreement or commits any
fault or their services are not to the entire satisfaction of the officer authorized by the CGPDTM or
Patent Office or Trade Marks Registry, Kolkata, a penalty leading to a deduction up to a maximum of
10% of the total amount of bill for particular month will be imposed.
(xviii) that the security money shall be liable to be forfeited or appropriated in the event of
35 | P a g e
unsatisfactory performance of the contractor and/or loss/damage, if any, sustained by the Office of
CGPDTM or Patent Office or Trade Marks Registry, Kolkata on account of failure or negligence of
the workers deployed by him or in the event of breach of the agreement by the Contractor.
IN WITNESS WHEREOF the parties hereto have signed these presents on the date, month and
year first above written.
In the presence of : -
st
1 Witness
Address
nd
2 Witness
Address
Signed for and on behalf of the Controller General of Patents, Designs and Trademarks
Address
nd
2 Witness
Address
36 | P a g e
ANNEXURE'F'
I / We hereby certify that the Patent Office/Trade Marks Registry, Kolkata under the Office of
Controller General of Patents, Designs and Trademarks shall have absolute right on the digital data and
output products processed / produced by me / us including any intellectual property rights if any accrued/
to be accrued thereon. I / We shall be responsible for security / safe custody of data during processing. I
/ We also certify that the digital topographical data will not be taken out of the building premises or the
vendor's premises (as the case may be) on any media. The original input data supplied to me / us by
the Patent Office/Trade Marks Registry, Kolkata or digital data and output products processed / produced
from input data will not be passed on to any other agency or individual other than the authorized
person of Patent Office/Trade Marks Registry, Kolkata. I / We shall abide by all security and general
instructions issued by IPO from time to time.
I / We also agree that any Patent Office/Trade Marks Registry data from my/ our computer
system may be deleted in the presence of the observer of Patent Office/Trade Marks Registry,
Kolkata after completion of the task.
(2)
37 | P a g e
ANNEXURE'G'
3. We, the said bank further undertake to pay the CGPDTM any money so demanded
notwithstanding any dispute or disputes raised by the contractor(s) in any suit or proceeding
pending before any court or Tribunal relating thereto, our liability under this present being
absolute and equivocal.
4. We, ________________________ further agree that the guarantee herein contained shall
remain in full force and effect during the period that would be taken for the
performance of the said agreement and that it shall continue to be enforceable till all
the dues of the CGPDTM under or by virtue of the said agreement have been fully paid
and its claims satisfied or discharged or till Officer-in-charge on behalf of the CGPDTM certified
that the terms and conditions of the said agreement have been fully and properly carried out by
the said Contractor(s) and accordingly discharges this guarantee.
6. This guarantee will not be discharged due to the change in the constitution of the Bank or the
Contractor(s).
7. We, ___________________ lastly undertake not to revoke this guarantee except with the
38 | P a g e
and unless a claim in writing is lodged with us within six months of the date of expiry or the
extended date of expiry of this guarantee all our liabilities under this guarantee shall stand
discharged.
Signature of ................................
39 | P a g e
Annexure - I
Working Hours
The working hours for IPO are from 9.30 AM to 6.00 PM with weekly off on Saturdays and
Sundays. However, the offices will be open on Saturdays with a few staff working.
General Conditions
All works to be done at timings convenient to the office without interference to office work.
Supervisory staff should be available to give instructions to staff. All personnel should be in
uniform and should maintain discipline. The Officer-in-charge of FMS designated by IPO
should be informed immediately whenever there is an emergency situation. Any major
work or repair to be carried out should be brought to the notice of the designated officer of
IPO. Reports of all complaints and rectification works done should be maintained and should
be submitted to the designated officer of IPO.
There should be a supervisor in charge of all the facility management works called as Facility
Manager and he/she should report all requirements to Officer-in-charge of FMS designated
by IPO. The Facility Manager should arrange additional or skilled worker to be engaged on-
call basis and will be responsible for detecting such requirement by regular walk through and
monitoring. Facility Manager shall also be responsible for co-coordinating with external
agencies and Original Equipment Manufacturers.
The equipment and other tools and aids required for undertaking the services are to be
arranged by the facility management company.
The successful bidder shall enter into a Service Level Agreement with CGPDTM which will
cover the details of manpower that will be deployed, their working hours and on-call
availability.
The Facility Manager deployed shall be responsible for preventive and breakdown
40 | P a g e
maintenance of all the equipment/machines/accessories/units etc. as mentioned in Annexure
V. The Facility Manager will be responsible for maintaining the Complaint (Call Log)
Register.
The contractor shall maintain all the records on electrical installations, DG sets, UPS, Lifts,
firefighting system, AC installations etc., in accordance with the statutory rules and
regulations of Central and State Authorities. The contractor shall also be responsible
for updating and intimating the IPO regarding the changes in the statutory requirements of
Central and State authorities and shall recommend the suitable measures to be taken to adhere
with such statutory requirements.
Preventive and break down maintenance and record keeping etc. of electrical substation,
transformers Panel Buss Bar, LT Panel, AMF Panel, capacitor panel, Distribution Panel
etc. Electrical Control Panel room including maintenance of switch gears, panels for AC,
garden light, lift room, water pump and power factor panels, UPS etc. Preventive and
break down maintenance of Earthing System. Co-ordination & getting necessary
assistance from statutory authorities in emergency situations.
Minor maintenance of above panels like fuse replacement, minor switch gear problems
etc. Checking the power factor and operating the capacitor bank for PF correction to
avoid any penalty as specified in Clause (12).
Daily checking of the working of UPS, load sharing conditions, maintaining battery
bank, Reporting faults to OEM and coordinating with OEM of UPS during maintenance
by them.
Material purchases in coordination with IPO for electrical consumables & spares as and
when required.
41 | P a g e
B. DIESEL GENERATING SETS except for IPO, Mumbai
C. LIFTS
Preventive maintenance of lifts inside the building. Operating (Switching on & off) lifts
and as per instructions of the office, monitoring the working of lifts, reporting the faults
to the OEM and coordinating during maintenance by them.
Recordkeeping of the maintenance details, getting license renewals from the authorities.
Coordinate with External Agency and ensure water supply in underground tanks.
All day to day preventive maintenance related to the water distribution pipe line,
valves-inspection and minor leak arresting, ensuring supply to water purifiers for
drinking water, coordinating with water purifier manufacturer for cleaning servicing
and repairs of purifiers & water treatment plants etc., to ensure water is available to
user within the site premises.
Preventive Maintenance and cleaning of water dispenser, purifier and water cooler.
Reporting on time to IPO and coordination with external agency for any major repair
needed in pipe line requiring modification and welding, re-routing of pipe lines etc.
Reporting and coordinating with specialized agency for Cleaning of overhead and
underground water tanks half yearly (the months to be fixed by IPO) and also when
need arises.
42 | P a g e
Minor plumbing and sanitation works.
Inspection of Wash rooms for reporting the requirement of hand wash and any other
sanitary consumables.
Reporting on time major repair needed of pump and motor, like rewinding of motor
etc.
Arranging water from water tanker agencies when there is shortage of raw water
supply.
Material purchases in coordination with IPO for plumbing and sanitation works as and
when required.
• Monitoring and Preventive Maintenance of hose pipe & nozzle etc. of Fire Hydrant
System.
• Preventive and minor break down maintenance of pipe lines and distribution valves.
• Maintenance like pipe line modification etc., in coordination with external vendor
during maintenance carried out by them.
• Actual firefighting in the event of fire, fire information & reporting,
• Record maintenance, follow up for refilling and co-ordination with OEM of Portable
Fire Extinguishers.
• Smoke Detection/ Fire Alarm System - First line maintenance, responding to fire alarm,
checking the reason for alarm and taking corrective action and conducting periodical
Fire Evacuation Drills.
Switching on and off daily the duct air conditioning units and checking parameters in the
control boxes and making changes.
Uninterrupted maintenance of temperature in server rooms etc.
Cleaning of duct air conditioning system at frequent intervals and when some choking
problem is detected.
Record keeping of SPLIT ACs and WINDOW ACs.
Coordination with the IPO identified comprehensive contractor to report timely and get
any repair done.
H. BUILDING MAINTENANCE
Minor civil repairs like leakage, replacement of false ceiling, minor cracks, plumbing
works and other repairs in toilets, touching up painting etc.
Maintenance of Aluminium, wood and glass doors, partitions and windows and repair
of handles, locks, lockers etc.
44 | P a g e
J. HOUSE KEEPING
1. Cleaning, sweeping moping and wiping of floors, staircase on daily basis including
Saturdays or as required by Officer-In-charge. Cleaning activity shall start in the
morning at 7.30 AM so as to complete all the dusting/ cleaning/ moping work before
10.00 AM. to ensure that the premises are clean, hygienic and aesthetically appealing at
all times.
2. Continuous moping, at least four times, to be done at IPO reception floor and other
floors during office hours (9.30 AM to 6.00 PM).
3. Brooming and mopping of all floors including entrance lobbies, staircases and common
passage ways etc. at least twice a day.
4. Cleaning and dusting of entire furniture, partitions, glass panes, wooden cabin walls,
railings, doors, windows, venetian blinds, racks, sofas, computers, printers, scanners, fax
machines, key board, telephones, curtains, wall mounted fans, storage cupboards, and
other office equipment and/or accessories including common furniture in waiting areas
and dining hall and other ornamental items etc. inside the building with dry/wet cloth,
feather brush and duster.
5. Daily maintaining the workstations and common passages clean and odor free and
spraying room fresheners.
6. Dusting and cleaning of compactor rooms and other areas like store rooms.
7. Cleaning of dining hall and furniture at the morning and after lunch break.
8. Cleaning and sweeping of open area including balconies and roof tops with brooms.
9. Washing of towels provided to employees at regular intervals.
10. Cleaning of emergency exits at regular intervals.
11. Washing of water jugs and glasses of employees and refilling jugs with drinking that
water every morning.
12. Serving tea/coffee to guest as and when required.
13. Checking the proper working of clocks or other similar gadgets in the office premises.
14. Thorough cleaning of all toilets using required detergent by putting naphthalene balls
and air purifier in all urinals, wash basins and WC area to maintain wash rooms, toilets,
wash basins etc. clean and disinfected. An dedicated HK personnel should be engaged in
each floor of the toilet between 11 a.m. to 4 p.m. Every day to keep the toilet dry and
order free.
15. Ensuring that the fittings like taps exhaust fans and flushes are working properly.
45 | P a g e
16. Daily removal of garbage & other wastes and cleaning of dustbins and putting plastic
bags every morning and disposal of garbage every evening after office hours to
municipal collection point.
17. Maintenance of the outside of water purifier machines and the drains connected to it.
18. Lifting, carrying and disposing the dead birds animals, rats, insects etc. if found in and
around the office building.
19. Clearing of any choking’s in the drainages, manholes etc., and ensuring that there is no
blockage of drains.
20. Removal of beehives and cobwebs/honey webs from the office building and its premises.
21. Proper registers/records for the jobs carried out on daily, weekly, fortnightly and
monthly basis will be maintained by the Supervisor of the bidder and will be
countersigned by the IPO officer-in-charge at regular intervals and finally at the end of
each month.
22. The bidder should possess or procure needful infrastructure, gadgets and other material
required for smooth housekeeping services. No additional cost towards this will be borne
by IPO.
46 | P a g e
Cleaning of blockages in sewer and pumping lines within premises as and when
required.
Cleaning gulley trap and manholes as and when required.
Cleaning of duct and shaft spaces, garbage, and removal and putting them in dustbin
kept outside the building.
Cleaning/removal of any type of stains of ink etc. from the building premises and
staircases.
Cleaning, sweeping and wiping of floors, furniture and hand washing area etc. during
office hours.
Cleaning of lift walls with silver/brass liquid cleaner.
Room fresheners in all office area to be used daily in the morning. Room freshener
should be of ISI Mark or of standard Make as desire by IPO.
Spray of scented Mosquito and cockroach killer on all floors as and when required.
Special scanted purifiers shall be sprayed atleast twice daily in all rooms, cabins,
bathrooms ( at least four times), reception conference halls lifts lobby, lifts etc.
Maintenance of lawns & surroundings, cutting of hedges, cutting / shaping of plants by
gardener and removal of garbage at all IPO locations.
At least three Housekeeping personnel should identify who will be engaged in refilling
drinking water time to time, serving tea/ coffee to respected guest, soft cleaning like
computer, telephone, glass pane, refilling of liquid soap, ensuring of air purifier,
spraying of air freshener etc. to ensure that cleanliness and hygienic condition to refill
water etc.
48 | P a g e
L. Hardware Maintenance
2. Preventive Maintenance (P.M.) for all the items should be carried out on
regular basis. The preventive maintenance including following:-
The tenderer shall carry out cleaning of each computer and its peripherals
with the required cleaning material like Isopropyl Alcohol/Alcohol and
cleaning by using vacuum cleaner once in two weeks or as and when
required. The damages, if any, caused to the computers and peripherals at
the time of cleaning will be recovered from the monthly bill as a penalty
measure.
49 | P a g e
Maintenance is to be provided for about 350 Data point/ computer
terminals (LAN) along with the necessary software and hardware support
for punching and crimping of wires sockets of LAN points.
10. In case any component is required to be repaired, the repair work shall be
carried out by the Contractor and this activity is included in the scope of
the tender. In case the component is non-repairable the same will be
arranged and replaced by the contractor at the cost of IPO, Kolkata. the
said replacement shall be done only after approval from the Head of
Office, Patent Office, Kolkata.
1 2 3 4 5
WEEK No. of
S.No. HEAD SHIFT
DAYS Personnel to
be Manned
50 | P a g e
1 Facility Monday 9a.m. to 6 p.m. 1
Manager to
Saturday
2 TECHNICAL
- -
3 SECURITY
51 | P a g e
4 Housekeeping Monday 7.30 a.m. to 4.00 p.m. 11
to
10 a.m. to 6.30 p.m. 4
Saturday
5 Gardener Monday 8a.m. to 4.30 p.m. 1
to
Saturday
6 Hardware Monday 9.30 a.m. to 6 p.m. 3
Maintenance to
Technician Saturday
The above table shows the number of workforce to be deployed to serve IPO. It is the responsibility of the
bidder to calculate the number of personnel they required to engage following Labour law. However, the
billing will be as per unit rate of a specific category X man-days. The bidder must employ adult and
skilled labour only. Employment of child labour will lead to the termination of the contract. The successful
bidder shall engage only such workers, whose antecedents have been thoroughly verified, including character
and police verification and other formalities. In order to maintain quality services and minimize operational
problems, the bidder must rotate the staff once in six months with prior written intimation to IPO. The bidder
shall ensure that all the workforce deployed wear uniform while on duty.
52 | P a g e
O. SECURITY
Providing round the clock security at the entrance gates and entrance lobbies including gunmen, lady
security guard and male security guards to maintain register for visitors and daily wage workers and for
security during night. They are the custodian of key of the office and they will be open and close the door as
and when desire by IPO. The security personnel should be patrolling the premises and give instructions for
movement of vehicles. They will be engaged in primary firefighting and rescue operation of official if
situation demand. All security guard will be answerable to the Facility Manager and IPO. Any type of
security lapses will be viewed seriously.
53 | P a g e
Report Card
Annexure II
15 10 5 0