Civil Works Unit Price
Civil Works Unit Price
Quantity of Accomplishment
Item No. Description of Work Unit Unit Price Estimated Quantity
Previous This Period
1 Rebars
1.a Fabrication (Above 20mmф) kg 3.06
1.b Fabrication (Above 16mmф) kg 3.48
1.c Installation (Above 20mmф) kg 2.04
1.d Installation (Above 16mmф) kg 2.32
2 Forms Works sq.m 320.00
3 Concreting (RMC) cu.m 120.00
4 Concreting (Slab) cu.m 250.00
5 Lean Concrete sq.m 35.00
6 Gravel Bedding cu.m 50.00
7 Stone Masonry cu.m 400.00
8 Grouted Riprap cu.m 400.00
9 PCCP sq.m 37.80
10 Manual Trimming sq.m 50.00
11 Manual Excavation cu.m 200.00
12 Gabions cu.m 380.00
13 Bunk House unit 20,000.00
14 Pile Hacking pcs 800.00
We hereby that the works performed to dateandmaterials applied in the project are in comformity eith the relevant cntract drawing, specification, & engineer instructionandthat the q
Submitted By:
Edgar dela Cerna
Sub-Contractor
Accomplishment Amount Accomplished
To Date Previous This Period To Date Remarks
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Total: Php 0.0 Php 0.0 Php 0.0
Checked By:
Edgar dela Cerna
Field Engineer