You are on page 1of 18
2h Apt Inspection Technologies aT Tide Document No. Rev. | Page ATTRTIOO 18 1 RADIOGRAPHIC EXAMINATION WELDS Volume No. Product/Structure Doe Type Derived From Rev. Tob No. Project Giieat GENERAL SPECIFICATION A Rev] KIND OF REVISION ‘This specification complies with ASME Code Sec. 1, V, IX, VIII div. 1, 2007 Edition 2009 Addenda, . ‘This specification compiles wi ASME B31.1, 2007 Edition 2009 Addenda. 18 | Updated ASME Code 2007 Edition with Addenda up to Addendum 2009 included. Updated ASME B31.1, 2007 Edition with Addenda up to Addendum 2009 included. (Modified para. 16.1 item ¢). 17 _| Updated in accordance with ASME B31.1, 2007 Edition. Modified Para. 3.3. 16 | Updated ASME 2007 Edition 15 | Updated ASME 2004 Edition with Addenda up to Addendum 2006 included. 14 | Updated ASME 2004 Edition 13 | Updated ASME 2001 Edition and 2003 Addenda. Engineer | Engineer | Quality NDT Lev til Fazal Kiran | Balakrishna 25/0012 Prepared | Checked | Checked | Checked | Checked | Approved Date ys Apt Inspection Technologies air ‘Confidential intmaso,propenty of Ap Inspection Technolgies Noto be used for any purpose eer ha tht for which itis supplied Project Doc no. Rev. STANDARD AIT/RT/00 18 2 INDEX 1. SCOPE 2. GENERALITY 3. APPLICABILITY AND TIME OF EXAMINATION 4, SURFACE PREPARATION 5, 6 RADIOGRAPHIC TECHNIQUE, . RADIOGRAPHIC DENSITY LIMITATION 7. CALIBRATION & SCATTERED RADIATION 9, GEOMETRICAL UNSHARPNESS 10. EQUIPMENT 11, FILM SELECTION AND SCREENS 12, IMAGE QUALITY INDICATORS (IQ) 13, SYSTEM OF IDENTIFICATION AND MARKERS 14, FILM PROCESSING 15, INTERPRETATION OF RADIOGRAPHS 16. ACCEPTANCE STANDARDS 17, PERSONAL QUALIFICATION 18 REPORT FIG. 1-2 ae Apt Inspection Technologies AT Project Doe no. STANDARD. AIT/RT/00 18 3 1. SCOPE ‘This specification covers al permitted technique procedures 10 perform a radiographic examination of welds to be used in power boiler steam generator construction. 2. GENERALITY 2.1 The examination performed according to this specification is in accordance with ASME Code Sect. V Article 2, with ASME Code Sect. {, with ASME Code Sect. VIM Div. 1, with ASME section IX and with ASME B31.1 2.2. This specification shall be applied to examination of welds during the fabrication process whenever required by the applicable Quality Control Plan (CQ) and/or specification. 2.3. For particular production job, radiographic examination shall be performed according to the applicable “Instruction Sheet” referencing the present specification and giving at least the following technique variables: = material and thickness range = isotope used or maximum Xray voltage - minimum source-to-object distance ~ maximum distance from source side of objects to the film = maximum source size = film brand and designation = screens used 2.3.1 Demonstration of the density and IQI image requirements of the Instruction Sheet on production or technique radiographs shall be considered a satisfactory compliance of Instruction Sheet. 3, APPLICABILITY AND TIME EXAMINATION 3.1 This procedure applies to carbon, low or high alloy steet welded materials. 3.2. This procedure may be used for pressure and non pressure parts of power boiler steam generator 3.3 Time of examination ‘The radiographic examination shall be performed before or after postweld heat treatment, Radiographic examination of welds according to ASME B31.1 for P-No. 3, 4, 5a and Sb shall be performed after PWHT. ns

You might also like