You are on page 1of 1
= The Constr sal provide and inal al lt and cote oom accessors. > The Contactor all ensre that painting work fo this projet carried ou in ascardance with Snot Arca Standords and Spesifstions ‘Ciivstructurat Th Contractor sal ches all underground services ese forthe presen of underground ‘ervoe reco any exavation of the foundation. Should the checking procedure reveals exiting ‘ured services then the Contractor mus early hand excavate the ste lstead of wing power tool = The Conrsor shal aw out exiting concrete lblaphl pavement a nad fo the Construction ofthe new conrete founds. Upon completion of te conse, tho excated Slab are shal be reinstated to ts origin ondon, ompacted to meet the requirements Rated in SAES-Q.O05 aad SAES-A-116 = The Contactor tall eonstuc th foundations, the lb nd the cones pus forthe extension a6 perthe dnnsios and height shown om vgs. = The Constr sal vest the nw structural ste! forthe extension as pth eaings Piping re METPMSD Repesettve shall islte and depressrize he in fected by losing the appropriation valves en opening he daa valves, = The Goeiractr sal demolish the 2” wt water ine snd 2" wl Uinaas shown a dein erin «The Cotrctc sal elocte the fi hose rel FR as shown on RA- 359454 The Cotrstr sal fibres therequled ne pipiag as shown om RA- 278065, 2 The Cotrstr sal ntl he new ppg th 2” tly water ine, 2° uty aiand 3” Fre Waterline gs show on RA-359684, BA3S9710 and RAS97IL. = The Coctrastr sal ntl the now ppg of the suit sewer as shown on dawiag RA- 350455. modieation by Eguipmen The Contractor sal purchase 2 BAS tos capsiy hgh wall mints ype HVAC system Serving the Conferenee Room, LEAS ton mi-pli esate tps HVAC sytem serving {Cartes room md esridr and LEA~LS Toes mul-spit serving he Tol Janitors coset teapecelyislladon oF HVAC sytem sal be in ccordnoes wit refzeace deowing BA- 244796. ‘Noe The orage om is ssumed not occupied therefore no HVAC is eau. 2 The Contato al ital on exit fan orth ale as pe ring RA 248796 or as regi Bretrcal Th contractor sal pace exiting beaker with 250AF/1SOAT of Cubicle 4G oF 308-MCC-08 ss ahown in th ravings RA-260145 sheet OL. = Thocontctor sal instal nee sth ack 007-308-5001 complete wit ry ype transformer (QU7-308-XFR.020, Power Panel QO7-308-70-067, Lighting Panel Q07 30BLP-025 as shown in Ssuteoer: Conny Gnd

You might also like