Professional Documents
Culture Documents
Fp 1 1 1 FT 1.22 C3
Fm 1.4 1.4 1.4 FBm 2.8
Cp ($) 24878.60895996 2854.448321 8311.368444 CBm ($) 3213294 Fp
0 0 0 0
-0.11272 -0.11272 -0.11272 0 0 0
0.08183 0.08183 0.08183 0 0 0 0 0 0 0
Perhitungan
1.10446 1.178839 1.094252 1 1 1 1 1 1 1
2.7 2.7 1 1 1 1 1
36 763 11 35 12
18978.3430678204 106150.368570082 3793.7958075789 18905.1388444296 4387.836956293
6.7468727397 6.3232187576 3.29 3.29 3.29
128044.465488663 671212.001669372 12481.5882069345 62197.9067981735 14435.9835862038
E-106
Shell Tube
185 147
11 3
9015
Floating Head
1.63
1.66
4.8306
-0.8509
0.3187
CS
Cond. Vap.
0.03381 0
-0.11272 0
0.08183 0
1.011973 1
1 1
80
23201.3327479334
3.3098744904
76793.4994066527
Cost of Operating Labor (COL)
Equipment Jumlah
Heater 1
Reactor 1
Exchanger 6
Compressor 1
Tower 1
Vessel 4
Pump 3
Nnp 10
P 0
NOL 3
COL 13.19
14.00
Labor Cost 740600
(2001) ($/y)
Cost of Utility (CUT)
Electric Cooling
HPS MPS Fuel Gas
Equipment Power LPS (GJ/h) Water
(GJ/h) (GJ/h) (GJ/h)
(kW) (GJ/h)
E-101 268.863
E-102 16.51764
E-103 14.0104
E-104 2.95059
E-105 0.38409
E-106 128.3486
H-101 300.144
1.055
9.045
51323652.86
5947578.104
57271230.97
Cost of Waste Treatment (CWT)