9) Adjust the Sensor for Set gap of 2.6mm (+/-0.15mm) and check for Zero reading in Monitor ( use ZeroShift parameter
to Set current position of ‘Rotor Zero’ if required)
10) Make a Note of following mentioned Parameters for Zero Reading at Monitor:
a) Set Gap (mm) b) Gap Voltage (VDC) c) Extension Cable Resistance (ohms)
12) Check Gap Voltage at the Driver. Make sure reading is same as noted above.
13) Check & tie properly, loose cable loops of sensor & extension cables, which are open & close to rotating parts.
This ensures protection against damage to sensor + extension cables due to touching rotor parts.
1
STANDARD INSTALLATION PROCEDURE
2
STANDARD INSTALLATION PROCEDURE
COMMISSIONING PROTOCOL
Observation Table :
NOTE: Movement of rotor is positive towards generator side and negative towards HP turbine side is
checked.