You are on page 1of 2

Nishat Mills Limited (Apparel Division) Remarks

Unit 69 - 2km Nishat Avenue Off


Area
22 Km Ferozpur Road Lahore

SQF

Total Area 347,411

Total Covered Area 374,151

Manufacturing Area 198,080

Important Material Store (FABRIC) 27,548

Local Material Store 4,412

Finished Goods Store 9,600

Rejected Store 3,100

Waste Store 2,765

Detail of Building:

 Main Mill Building ( Sewing Hall, Cutting Hall, Laundry, Dry Finishing Area, Finishing Hall, Fabric
Store, Packing store, Chemical Store, HR Offices, Waste Area, Sampling Sewing, Canteen & Main
offices).
 Utility Building ( Utility block, Boiler House, Effluent Treatment Plant, Compressor Room, Gate
Office & Security Office).
Diesel Power Generator Information At Nishat Apparel Unit #2 we have 2 Genset at in which one Genset is out
of order while other one is running.

Source of Water & Volume of consumption Source of Water is “Ground Water”, Total water withdraw in month of
April =11634m3
Volume of waste water Total volume of wastewater in month of April = 7748 m3

Type of fuel (Used in boiler /kiln) Heavy Duty Furnace Oil (H.F.O)

Height & Dia of chimney Boiler 1: - Height =25’ Dia= 30”


Boiler 2:- Height =46’ Dia = 26”

Type of Pollution Smoke, Pollutant Gases, Waste Water, Smoke, Pollutant Gases, Waste Water, Solid Waste, Smell, Noise,
Solid Waste, Smell, Noise, Injection of Water

You might also like