Natural Hazards Project Guidelines

This document outlines a social science project for a group of 6 students on natural hazards. It provides objectives for understanding hazard types, causes, effects, and mitigation measures. It describes the methodology, requiring a 13-15 page report following a specific structure and sequence. The report must include an introduction, headings, activities, conclusions, bibliography, and labeled photos/sketches. Students will be assessed on initiative, accuracy, creativity, analysis, and punctuality, for a total of 10 marks.

Uploaded by

Aasim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
60 views1 page

Natural Hazards Project Guidelines

This document outlines a social science project for a group of 6 students on natural hazards. It provides objectives for understanding hazard types, causes, effects, and mitigation measures. It describes the methodology, requiring a 13-15 page report following a specific structure and sequence. The report must include an introduction, headings, activities, conclusions, bibliography, and labeled photos/sketches. Students will be assessed on initiative, accuracy, creativity, analysis, and punctuality, for a total of 10 marks.

Uploaded by

Aasim
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd

Class – X Task – Group of 6 students

Social Science Project Last Date of Submission: 9th July

NATURAL HAZARDS - CAUSES, CONSEQUENCE, AND MITIGATION


MEASURES – “ROLE OF THE STUDENTS”

OBJECTIVES:-
The students will be able to:
 Understand the significance and implications of various types of hazards.
 Understand about the nature, causes and effects of each hazard type.
 Discuss various mitigation measures that need to be taken up during hazards.
 Discuss the various hazards namely earthquake, tsunami, landslide, flood, cyclone and
drought.

METHODOLOGY AND PROCEDURE:-


After the discussion about the project the students were asked to prepare project.
Following are the essentials requirement to be fulfilled for its preparation and submission-
1) The total length of the project report will be 13 – 15 pages.
2) The project report will be handwritten and credit will be awarded to original drawings,
illustrations and creative use of materials.
3) The project report will be presented in a neatly bound folder.
4) The project report will be developed in this sequence-
 Cover page showing project title, student name, class-section, school and year.
 List of contents.
 Acknowledgements and preface (acknowledging the institution, offices and libraries visited
and person who have helped).
 Introduction.
 Information with suitable headings.
 Planning and activities to be done during the project, if any.
 Conclusions (summary and suggestions or findings, future scope of study)
 Bibliography
 All the photographs and sketches should be labelled and related to the theme.
 Appendix (if needed)
 Teacher’s report

ASSESSMENT CRITERIA:-
 Initiative, cooperativeness and participation. 2 marks
 Content accuracy and research work. 2 marks
 Creativity, originality. 2 marks
 Analysis of different situations and different perspectives. 2 marks
 Punctuality in submission. 2 marks
Total 10 marks