You are on page 1of 1

We use cookies to ensure we give you the best experience on our website.

You can find out about our cookies and how to disable cookies in our Privacy
Policy. If you continue to use this website without disabling cookies, we will assume you are happy to receive them. Close.

Newsletter Register Sign in

esigning Buildings Wiki Search

Share your construction industry knowledge


Subjects Tools / info

Edit this article Create an article

Last edited 14 Dec 2018


See full history Share Follow

Schedule of rates for construction Related articles

Admeasurement.
Contents Bill of quantities.

[hide] Charge-out rate.

1 Introduction Construction contract.


2 Pros and cons Construction person year.
3 Tender documents
Difference between lump sum and
3.1 General conditions measurement contracts.
3.2 Building work
Henry Boot Construction Ltd v Alstom
3.3 Mechanical and electrical, lifts and escalators Combined Cycles.
4 Benchmark rates
5 Related articles on Designing Buildings Wiki

Introduction

In its most simple form, a schedule of rates can be a list in a contract setting out the staff,
labour and plant hire rates the contractor will use for pricing cost reimbursable instructed
daywork.

However, on a much larger scale, a 'schedule of rates term contract', 'term contract' or
'measured term contract' may be used when the nature of work required is known but it cannot
be quantified, or if continuity of programme cannot be determined. In the absence of an
estimate, tenderers quote unit rates against a document that is intended to cover all likely
activities that might form part of the works.

As the extent of the work is unknown, the unit rates include overheads and profit. General 1 Concrete Crusher Plant -
preliminaries such as scaffolding, temporary power, supervision and temporary ISO Quality Guarantee
accommodation will also have rates. On projects longer than around 18 months there might be Offer Concrete&Aggregate
escalation provisions based on annual percentage increases. Crusher, for Construction Waste
Recycling, contact us!
yfcrusher.com
Pros and cons
2 Raincoat Roofing Systems
Over 40 years extensive product
The advantages of schedule of rates term contracts include: testing programs across the world.
Get A Free Quote Today
Variations are easier to estimate and normally cheaper than on fixed price traditional
contracts. Raincoat Roofing Systems
The client can stop and start work at a pace that might be determined by cash flow or
funding.
A larger pool of contractors can be asked to tender as the process is inexpensive and
quick. Featured articles and news
It is flexible in relation to scope and contractual commitment.
As a fully-detailed design is not required the client can obtain tenders at the early stages of
a project and begin construction before completion of the design. So to this extent it is 'fast bsi consultation
track'.

The disadvantages include:

Additional resources are required to measure work and certify payments.


The client does not have a final price when committing to starting work.
It is difficult for contractors to plan long-term resources and so might mean changes to
personnel with loss of continuity.
Contractors may be tempted to front-load costs in case later work does not materialise.
There is no real incentive for contractors to treat such work with any sense of urgency and
its best staff will be placed on the projects where the contractor is carrying more risk.

The tender documents will be a substantial package looking like a bill of quantities with
numerous options and discount opportunities based on quantity. Your chance to comment on the draft BS 851188
- flood resistance products and flood protection
products.
Tender documents

Notre Dame conservation


Tender documents might have the following headings:

General conditions

Methods of measurement.
Qualification of star and proportional rates.
Site preliminaries.
Treatment of overtime rates.
Codes of practice.
Inclusion of protection, waste, transportation and health and safety compliance.
Approved list of suppliers.
What is included in rates,such as all subsistence and travel expenses.
Client direct supplies and directly employed tradesmen.
Testing and commissioning.
Curved work premium.
Definitions as used in the document.

Building work

Demolition.
Geotechnical investigation.
Excavation. Rebuilding could take 20 to 40 years.
Concrete work.
Brick and blockwork and masonry.
Roofing and tanking.
Scaffolding and staging. One Park Taipei
Carpentry and joinery.
Ironmongery.
Steel and metalwork.
Fire shutters.
Plasterwork, floor, wall, ceiling finishes.
Plumbing and drainage including cable ducts.
Fixtures, fittings and soft furnishings.
Demountable partitions, dry walling and cubicles.
External works.
Labour.
Plant and equipment hire.

Mechanical and electrical, lifts and escalators

Electrical installation.
High voltage switchgear.
Transformers.
Low voltage switchgear.
Standby generators.
Air conditioning and ventilation.
Building Management System (BMS) controls.
Fire services.
Town gas.
Catering equipment.
Intruder alarm.
Public address system. RSHP’s high-rise residential towers win a tall
External lighting and electric gates. buildings award for excellence.
Lifts.
Escalators.
Cleaning cradle system.
Global cabling market
Each of these headings will cover numerous elements which then have to be broken down into
pricing units. For instance brick, blockwork and masonry might include a section called natural
marble or granite slabs/tiles of any shape, size pattern or colour :

BSRIA study reveals strong growth in 2018.

Quality in Construction Summit

Benchmark rates

A number of indices are available providing benchmark rates that can be used for estimating
purposes, such as the BCIS Schedule of Rates , the PSA Schedule of Rates , and so on.

Related articles on Designing Buildings Wiki


Dame Judith Hackitt confirmed as keynote

Admeasurement. speaker – one year on from the Hackitt Report.


Bill of quantities.
Charge-out rate. Save £100 on tickets.
Construction contract.
Construction person year.
Difference between lump sum and measurement contracts. Ethics and professionalism
Henry Boot Construction Ltd v Alstom Combined Cycles.
Measurement contract.
Preliminaries.
Procurement route.
Rates.
Remeasurement.
Schedule.
Tender documents.
Term contract.
Unit rates basis of payment.

Share Add a comment Send us feedback

Modern slavery in the construction sector.

Comments
Contract law

Here is an example of a schedule of rates for UK building, construction and maintenance works

http ://www.constructionrates.co.uk/Schedule_of_Rates/Construction_National_Schedule_Rates_Measurement_NRSM_Dynamic.html

View comments history

What to bear in mind when claiming damages in


construction.

Infrastructure

How do we achieve sustainable clean-water


infrastructure for all?

Appointments

What you should know when appointing an


architect.

Standards

A brief history plus some new developments.

Design

How computational fluid dynamics (CFD) helps


building design.

Infrastructure

The Hong Kong Harbour Area Treatment


Scheme (HATS).

Click here for more Featured articles and news.

© Designing Buildings Ltd. 2019

You might also like