You are on page 1of 3

Home > Chapter 7 > Online Quiz

Course-wide Content
AIS Weblinks
Online Quiz
(See related pages)
Chapter 5 Comprehensiv...
Chapter 6 Comprehensiv...

Results Reporter
Quizzes
Online Quiz
Out of 10 questions, you answered 4 correctly with a final grade of 40%
More Resources
PowerPoint Presentation 4 correct (40%)
6 incorrect (60%)
0 unanswered (0%)
Your Results:

The correct answer for each question is indicated by a .

1 In the following basic BPMN diagram of the Sunset Graphics' conversion process, which of the
INCORRECT following bests describes when they would record an increase to work in process inventory?

A) When Authorize Product occurs

B) When Issue R/M (raw materials) occurs

C) When Complete Production occurs

D) When Issue R/M and Perform Work occur


Feedback: Work in process is increased when raw material is issued and direct labor is
applied.
2 In the following basic BPMN diagram of the Sunset Graphics' conversion process, which of the
INCORRECT following bests describes when they would record an increase to finished goods inventory?

A) When Authorize Product occurs

B) When Issue R/M (raw materials) occurs

C) When Complete Production occurs

D) When Issue R/M and Perform Work occur


Feedback: Finished goods inventory is increased when production completes.
3 CORRECT In a basic UML class diagram for the conversion process, the Production Authorization class is
which of the following?
A) Resource

B) Event

C) Agent

D) Type Image
Feedback: The production authorization is the event that begins the production process.
4 CORRECT In a basic UML class diagram for the conversion process, the Raw Material Issue class is which
of the following?
A) Resource

B) Event

C) Agent

D) Type Image
Feedback: The Raw Material Issue is the event documenting transfer of raw materials
into work in process.
5 In a basic UML class diagram for the conversion process, the Raw Material class is which of
INCORRECT the following?
A) Resource

B) Event

C) Agent

D) Type Image
PDF Creator - PDF4Free v2.0 http://www.pdf4free.com
Feedback: The Raw Material class is an inventory resource.
6 In a basic UML class diagram for the conversion process, a bill of materials specifies which of
INCORRECT the following?
A) The raw materials to be issued.

B) The raw materials used to make each finished good.

C) The labor to be used to make each finished good.

D) The finished good to be made.


Feedback: The bill of materials specifies the plan indicating which raw materials
comprise which finished goods.
7 How many relational tables are required to implements the following conversion UML class
INCORRECT diagram?

A) 6

B) 7

C) 8

D) 9
Feedback: There should be one table per class and one additional table for each
many-to-many relationship (Employees – Labor Operations, Products – Materials, and
Materials – Material Issue).
8 CORRECT In the following generic UML class diagram for conversion, how many foreign keys would be
posted in the table corresponding to the Material Issue class?

A) 1

B) 2

C) 3

D) 4
Feedback: There must be some way to implement each association. The Material Issue
class is involved in 3 associations, and one of those is a many-to-many relationship
requiring a linking table. So, the maximum number of foreign keys possible is 2. The
actual number is also 2, since the Material Issue table would contain a foreign key for
Product Authorization and a foreign key for Sunset Partners.
9 CORRECT In the set of tables for the following UML class diagram, how many foreign keys would be
posted in the Production Steps table?

PDF Creator - PDF4Free v2.0 http://www.pdf4free.com


A) 1

B) 2

C) 3

D) 4
Feedback: There must be some way to implement each association. The Production Steps
class is involved in 3 associations, and one of those is a many-to-many relationship
requiring a linking table. So, the maximum number of foreign keys possible is 2. The
actual number is also 2, since the table would contain a foreign key for Product
Authorization and a foreign key for Employees.
10 The following UML class diagram is an alternative conversion process model. In this model,
INCORRECT the Production Plan class is a combination of what two elements of the generic UML class
diagram?

A) Labor plan and bill of material

B) Material issue and bill of material

C) Labor plan and labor operations

D) Labor operations and bill of material


Feedback: The Production Plan provides information on materials used for each Product
(so it provides bill of material information) as well as the plan for labor (so it also
provides labor plan information).

E-mail Your Results

Date: Tue Sep 27 2016 16:48:02 GMT+0500 (Pakistan Standard Time)


My name:
Section ID:
E-mail these results to:
E-mail address: Format:
Me:
My Instructor:
My TA:
Other:

To learn more about the book this website supports, please visit its Information Center.

Copyright 2016 McGraw-Hill Global Education Holdings, LLC. All rights reserved.
Any use is subject to the Terms of Use and Privacy Center | Report Piracy

PDF Creator - PDF4Free v2.0 http://www.pdf4free.com

You might also like