Professional Documents
Culture Documents
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
K.O
H.K
R.
DATA SHEET
NE
OW
ITS
OF
FOR CONSTRUCTION
FOR
NT
DESCRIPTION
NSE
CO
EN
OM
FR
D
NE
May-27-10
TAI
DATE
OB
BE
ALL
SH
NO.
REV
FOR CONSTRUCTION
00
T
PAR
DISCIPLINE IN
ENGINEER OR
H. Kasajima L
May-27-10
FUL
DATE: IN
PROJECT ON
ENGINEER CTI
T. Hatoya DU
RO
DATE: May-27-10
REP
NO
CERTIFIED CO.
K. Ogawa AM
AR
May-27-10
DATE: UDI
SA
CONSTRUCTION
AGENCY
OF
Y
ERT
OP
DATE: PR
OPERATIONS E
SOL
E
N
VERIFICATION
REI
JGC DOC NO. S-340-136G-302 HE
EDSD
ED
AIN
PCWBS E000
NT
DATE:
CO
BY:
N
TIO
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
JGC CORPORATION
MA
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
OR
INF
(DCC) NO. _____________________
E
TH
D
AN
ING
DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AW
REVISION
DR
MOTOR OPERATED VALVES (BALL)
DAT 1
S
418006940.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
CONTENTS
ENGG CERT
K.O
H.K
1 GENERAL NOTES.............................................................................................. 3
2 ABBREVIATION LIST......................................................................................... 3 R.
NE
OW
ITS
OF
3 DATA SHEET....................................................................................................... 4
FOR CONSTRUCTION
NT
DESCRIPTION
NSE
CO
EN
ITT
WR
E
TH
T
OU
TH
WI
NT
ME
CU
DO
S
THI
JO/EWO
10-00450
OM
FR
D
NE
May-27-10
TAI
DATE
OB
BE
ALL
SH
NO.
REV
00
T
PAR
DISCIPLINE IN
ENGINEER OR
H. Kasajima L
May-27-10
FUL
DATE: IN
PROJECT ON
ENGINEER CTI
T. Hatoya DU
RO
DATE: May-27-10
REP
NO
CERTIFIED CO.
K. Ogawa AM
AR
May-27-10
DATE: UDI
SA
CONSTRUCTION
AGENCY
OF
Y
ERT
OP
DATE: PR
OPERATIONS E
SOL
E
TH
DATE: ARE
CONTROL NUMBER
N
VERIFICATION
REI
HE
EDSD
ED
AIN
NT
DATE:
CO
BY:
N
TIO
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
MA
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
OR
INF
(DCC) NO. _____________________
E
TH
D
AN
ING
DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AW
REVISION
DR
MOTOR OPERATED VALVES (BALL)
DAT 2
S
418006940.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
1 GENERAL NOTES
K.O
H.K
NT
Motor Operated Valves (Ball) are covered by Data Sheet per plant
DESCRIPTION
NSE
CO
OM
2 ABBREVIATION LIST FR
D
NE
May-27-10
TAI
DATE
Abbreviation Description
OB
BE
ALL
C.A. Corrosion Allowance SH
NO.
REV
00
T
CL Class PAR
DISCIPLINE IN
ENGINEER
H. Kasajima CS Carbon Steel OR
L
May-27-10 INS. Insulation
FUL
DATE: IN
PROJECT
MAT’L Material
ON
ENGINEER CTI
T. Hatoya DU
NPS Nominal Pipe Size RO
DATE: May-27-10
REP
DATE:
QTY Quantity OP
PR
OPERATIONS RF Raised Face E
SOL
RJ Ring Type Joint E
TH
DATE:
R-PTFE Reinforced Poly-Tetrafluoro-Ethylene
ARE
CONTROL NUMBER
N
VERIFICATION
SS Stainless Steel
REI
HE
EDSD
ED
STD Standard AIN
NT
DATE:
TEMP.Temperature CO
BY:
N
THICK. Thickness TIO
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
MA
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
OR
INF
(DCC) NO. _____________________
E
TH
D
AN
ING
DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AW
REVISION
DR
MOTOR OPERATED VALVES (BALL)
DAT 3
S
418006940.doc
Saudi Aramco 2616-ENG (03/99)
PMT OPRNS
SAUDI ARABIAN OIL COMPANY
ENGG CERT
3 DATA SHEET
K.O
H.K
R.
NE
OW
ITS
OF
FOR CONSTRUCTION
NT
DESCRIPTION
NSE
CO
EN
ITT
WR
E
TH
T
OU
TH
WI
NT
ME
CU
DO
S
THI
JO/EWO
10-00450
OM
FR
D
NE
May-27-10
TAI
DATE
OB
BE
ALL
SH
NO.
REV
00
T
PAR
DISCIPLINE IN
ENGINEER OR
H. Kasajima L
May-27-10
FUL
DATE: IN
PROJECT ON
ENGINEER CTI
T. Hatoya DU
RO
DATE: May-27-10
REP
NO
CERTIFIED CO.
K. Ogawa AM
AR
May-27-10
DATE: UDI
SA
CONSTRUCTION
AGENCY
OF
Y
ERT
OP
DATE: PR
OPERATIONS E
SOL
E
TH
DATE: ARE
CONTROL NUMBER
N
VERIFICATION
REI
HE
EDSD
ED
AIN
NT
DATE:
CO
BY:
N
TIO
REVISIONCERTIFICATION
APPROVAL/CERTIFICATION REQUIREMENTS,
MA
THIS INDICATES THAT REV. NO.__________
CERTIFICATE
OR
INF
(DCC) NO. _____________________
E
TH
D
AN
ING
DATA SHEET DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
AW
REVISION
DR
MOTOR OPERATED VALVES (BALL)
DAT 4
S
418006940.doc