DOLPHIN PROJECT Contractor’s Job Code:

0-3356-20

UPSTREAM AND COMPRESSION


FACILITIES

Rev.IssuePurpose/Description of RevisionPreparedReviewedApprovedCompanyR0124MAR051st Issue for


ReviewY.NagaiA.NagasakiF.SakamotoC0220JUL05Released for
ConstructionY.NagaiA.NagasakiF.SakamotoC0328NOV05Addition of new
itemsY.NagaiA.NagasakiF.SakamotoC0401MAY06Addition of new itemsY.NagaiS.AYAF.SakamotoZ0523 NOV 06As BuiltY.
Company Document No. RL0-0000-LDS-02004
NagaiS. AyaF.Sakamoto
Date
Document Class. 2

Contractor Document. No.

Area: Multi Area Ras Laffan

Discipline: Piping

Document Type: Data Sheet

Commitment Number: UCB 15-01

S-000-136B-004 <Z05>

Document Title:

Valve Data Sheets

for

Forged Steel Valves

© This document is the property of Dolphin Energy Limited. No part of this document may be reproduced or transmitted in any form or by any means, or used for
any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.

File Name:418007786.doc 1 of 115


DOLPHIN PROJECT Contractor’s Job Code:
0-3356-20

UPSTREAM AND COMPRESSION


FACILITIES

Rev.IssuePurpose/Description of RevisionPreparedReviewedApprovedCompanyR0124MAR051st Issue for


ReviewY.NagaiA.NagasakiF.SakamotoC0220JUL05Released for
ConstructionY.NagaiA.NagasakiF.SakamotoC0328NOV05Addition of new
itemsY.NagaiA.NagasakiF.SakamotoC0401MAY06Addition of new itemsY.NagaiS.AYAF.SakamotoZ0523 NOV 06As BuiltY.
NagaiS. AyaF.Sakamoto
Date

AS BUILT

© This document is the property of Dolphin Energy Limited. No part of this document may be reproduced or transmitted in any form or by any means, or used for
any purpose other than that which it is specifically furnished without the written consent of Dolphin Energy Ltd.

File Name:418007786.doc 1 of 115


DOLPHIN PROJECT Company Doc. No.: RL0-0000-LDS-02004
UPSTREAM AND COMPRESSION FACILITIES Contractor Job Code: 0-3356-20
Valve Data Sheets for Forged Steel Valves Contractor Doc. No.: S-000-136B-004 <Z05>

REVISION HISTORY

REV DATE DESCRIPTION

R01 24MAR05 1st Issue for Review

C02 20JUL05 Released for Construction

C03 28NOV05 Addition of new items

C04 01MAY06 Addition of new items

Z05 23 NOV 06 As Built

1. General Notes:
- When a paragraph is revised, this is marked by a vertical line on the right or left side.

2. Specific Notes to Painting:


- Painting shall be in accordance with specification for painting RL0-0000-WSP-02005 (S-000-13A0-001) and
normal operation temperature specified in this data sheet. Where steam out temperature is specified in this
data sheet, the steam out temperature of 175 ℃ shall be considered for painting system selection.
*1 In case the dual normal operating temperatures are stipulated for stainless steel valves and their
temperatures across the boundary temperature of 120degC, the quantity of stainless steel valves per each
painting system (i.e. Alter S1 or S2) will be notified to the valve vendor.