Mozambique

Mozambique Program

Coral South Development Project


EPCIC Phase

TMS - Specification - Process Fluid Properties

EX-DE 03 08/10/18 Issue for Final B. Truxillo A. Maslov O. DeAndrade - N.A.


EX-DE 02 23/08/18 Issue for Approval B. Truxillo A. Maslov O. DeAndrade - N.A.
EX-DE 01 21/03/18 Issue for Approval B. Truxillo A. Maslov O. DeAndrade - N.A.
EX-DE 00 18/01/18 Issue for Comment B. Truxillo A. Maslov O. DeAndrade - N.A.
Validity Rev.
Status number Prepared Checked Approved Company Company
Date Description
by by by Approved Endorsed
Revision Index
Company logo and business name Project name Company Document ID
CORALSOUTH 4404UUDTST240S2
DEVELOPMENT
Job N.
PROJECT
Contractor logo and business name Contractor Document ID
71259C-0400-SP-0000-S040

Contract n. 5000010298
Distrib. Category: PR10
Vendor logo and business name Vendor Document ID
6202-SP-0057-D

Contract: 71259C-001-200-CS-3626-0001

Facility / Sub Facility Name Location Scale Sheet of Sheets


Coral FLNG South – TURRET OFFSHORE 1 of 15
Document Title Supersedes N.

TMS - Specification - Process Fluid Properties Superseded by N.


Plant Area Plant Unit
N/A 000

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 2 of 15
Status Number
EX-DE 03

Project / Initiative name Coral South Development


Document Title TMS - Specification - Process Fluid Properties
This document summarizes the process fluid composition and contaminants for the TMS. The data in
ABSTRACT

this document was obtained from COMPANY and CONTRACTOR bases of design and project
specifications. This document is to supplement documentation packages to be issued to the TMS
vendors and fabricators.

Document Verification

Prepared by Unit Signature Date


B. Truxillo

Main contributions Unit Signature Date


Contractor
Prepared

A. Maslov

Checked by Unit Signature Date


A. Maslov

Approved by Unit Signature Date


O. DeAndrade

Verified by Unit Signature Date


Inter-Discipline
Company

Review

Verified by Unit Signature Date

Verified by Unit Signature Date

Checked by Unit Signature Date


Company Checked

Checked by Unit Signature Date

Checked by Unit Signature Date

Approved by Unit Signature Date


Approved
Company

Endorsed by Unit Signature Date


Endorsed
Company

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 3 of 15
Status Number
EX-DE 03

REVISION LIST
EX-DE_00 Issue for Comment
EX-DE_01 Issue for Approval
Issue for Approval
Table 2.2: Added superscripts to m3
Section 4: Added HOLD for confirmation on Scaler Inhibitor design pressure.
EX-DE_02 Section 4.1: Corrected Reference number
Section 4.1: Removed 40%wt MEG characteristics and properties.
Section 4.2: Corrected Reference number
Section 5: Added Utility Swivel tag
Issue for Final
Section 4: Remove HOLD 1 from Scale Inhibitor design pressure on Table 4
EX-DE_03
Section 4: Add Note 1 to Table 4 to differentiate the PSV set point and the piping/equipment
design pressure

HOLD RECORD
BEGINNING OF HOLDS LIST (DO NOT MODIFY OR REMOVE THIS LINE)

END OF HOLDS LIST (DO NOT MODIFY OR REMOVE THIS LINE)

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 4 of 15
Status Number
EX-DE 03

Contents

INTRODUCTION ........................................................................................................................................ 5
BACKGROUND ............................................................................................................................... 5
PROJECT LOCATION ..................................................................................................................... 5
COMPANY JOINT VENTURE INFORMATION............................................................................... 6
PROJECT OBJECTIVE ................................................................................................................... 6
SCOPE OF THE DOCUMENT ......................................................................................................... 6
REFERENCES ................................................................................................................................. 6
1.6.1 Order of Precedence ..................................................................................................................... 6
1.6.2 COMPANY Documents ................................................................................................................. 6
1.6.3 CONTRACTOR Documents .......................................................................................................... 6
1.6.4 TMS SUBCONTRACTOR Documents .......................................................................................... 7
ACRONYMS AND ABBREVIATIONS ............................................................................................. 7

UNITS OF MEASUREMENT ..................................................................................................................... 8

TURRET PRODUCED FLUID SYSTEM .................................................................................................. 10


PRESSURES AND TEMPERATURES ......................................................................................... 10
PRODUCTION FLOW RATES ...................................................................................................... 11
FEEDSTOCK CHARACTERISTICS .............................................................................................. 12
CONTAMINANTS DATA ............................................................................................................... 13
SAND PRODUCTION .................................................................................................................... 13

TURRET CHEMICAL SERVICES ............................................................................................................ 14


MEG CHARACTERISTICS AND PROPERTIES........................................................................... 14
SCALE INHIBITOR PROPERTIES ............................................................................................... 14

TAGS REFERENCED IN THIS DOCUMENT .......................................................................................... 15

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 5 of 15
Status Number
EX-DE 03

INTRODUCTION

BACKGROUND

The Area 4 Offshore Rovuma Basin block, with an initial area of 17,646 km 2, was awarded to the Area 4 Joint
Venture, for which Eni East Africa S.p.A. (EEA) was appointed as the Operator on December 2006 (with
effective date February 2007).

It is located in the deep waters of the Rovuma Basin (1500 to 2300 WD) and straddles the Mozambique’s
Northern border with Tanzania, adjacent to the Area 1 block. The Rovuma Basin is part of the Tanzania-
Mozambique Coastal Basin, which has a total extension of some 80,000 km2 and a maximum thickness of
about 10 km.

Figure 1: Initial Area 4 Block Location

PROJECT LOCATION

Area 4 is situated approximately 250 km North East of Pemba and 50 km from the coastline, measured from
the western limit of the concession; the Block is about 70 km wide by 200 km long. Currently Area 4 covers a
surface of 10207 sqkm.

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 6 of 15
Status Number
EX-DE 03

COMPANY JOINT VENTURE INFORMATION

EEA is the Operator of the Area 4 Block (with a 70% participation interest), with the other participants being
ENH (10% carried throughout the exploration phase), Galp Energia (10%) and Kogas (10%). CNPC holds a
28.57% participation in EEA (equal to an indirect participation of 20% in the Block).

PROJECT OBJECTIVE

Coral South Development Project has the objective to exploit the southern portion of Coral non-straddling
reservoir through one Floating LNG (FLNG) Unit, and relevant subsea development.

SCOPE OF THE DOCUMENT

The scope of this document is to describe the composition of the process fluids which will be imported to the
FLNG Facility within the Turret.

REFERENCES

1.6.1 Order of Precedence

Should any conflicts arise between the documents defining requirements for the project, the following listed
order of priority shall prevail; as defined in document 71259C010-200-CSD-3626-0001 Rev. 01. The list is
provided here for convenience only, and is subservient to the contract.
1. Mozambique National Laws and Regulations,
2. Lloyds Register & Flag Requirements (rev. July 2014),
3. COMPANY Basis of Design document Ref. 440400BGRB00013_Rev.02,
4. CONTRACTOR documents,
5. FEED documents contained in Exhibit K,
6. Applicable COMPANY Standards
7. International Codes and Standards,
8. TMS SUBCONTRACTOR Standards.

1.6.2 COMPANY Documents

CONTRACTOR COMPANY
Document Title
Document No. Document No.
1. Basis of Design NA 440400BGRB00013 Rev. 03

1.6.3 CONTRACTOR Documents

CONTRACTOR COMPANY
Document Title
Document No. Document No.
2. Engineering Design Basis 71259C-0100-PP-0203 4404GGBGPD0012T Rev. 04
071259C010-000-CSE-3626- N/A
3. SUBCONTRACT - EXHIBIT E - rev. 1
0001

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 7 of 15
Status Number
EX-DE 03

Subsea Chemical Injection Philosophy and


4. 71259C-0600-RT-6400-0007 4404GGBUPU0007T Rev. 04
Consumptions

1.6.4 TMS SUBCONTRACTOR Documents

TMS
CONTRACTOR COMPANY
Document Title SUBCONTRACTOR
Document No. Document No.
Document No.
TMS - Process Technical 71259C-001-200-CS-
5. 6202-DR-0008 4404UUDTRA215S2
Description 3626-0001
TMS - Piping System - Design 71259C-0400-STD-
6. 6201-DB-0105 4404UUDTRB150S4
Basis 1300-S001

ACRONYMS AND ABBREVIATIONS

COMPANY (CPY) CORAL FLNG SA


CONTRACTOR Consortium among JV IN, JV OUT, SHI IN, SHI OUT, TP IN and TP OUT
EPC Engineering Procurement Construction
FEED Front End Engineering Design
FLNG Floating Liquefied Natural Gas facility
LELO Lean Feedstock composition and High Ambient conditions
MEG Mono Ethylene Glycol
TMS Turret Mooring System
TMS SUBCONTRACTOR SOFEC, Inc.

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 8 of 15
Status Number
EX-DE 03

UNITS OF MEASUREMENT

The following reference conditions shall be applied when needed :

Reference Temperature (ºC) Pressure (bara)


Standard Conditions 15.0 1.01325
Normal Conditions 0 1.01325

Table 2.1: Reference Conditions Table

The units of measurement will be generally expressed according to S.I. except for any differences in the
following table:

Unit Symbol Notes


Temperature ºC Degrees Celsius
Pressure barg Gauge Pressure
bara Absolute Pressure
Time h hour
Reid Vapour Pressure (RVP) psia Pounds per square inch absolute
Mass Flow kg/h Kilograms per hour
MTPA Million tons per annum
Molar Flow kmol/h Kilomole per hour
Energy Flow kW Kilowatt (order of magn. <103 W)
MW Megawatt (order of magn. >104 W)
MWe Megawatt Electric Power
MWth Megawatt Thermal Power
Gas Flow MMSCFD Million Standard Cubic Feet per Day
106 SCFD
MMSCMD Million Standard Cubic Meters per Day
106 SCMD
Liquid Flow BBLPD Barrels per day at standard conditions
1 BBLSD = 0.1589873 m3/day
MBBLPD 103 BBLSD
Gas Quantities BSCF 109 SCF
TSCF 1012 SCF
Liquid Quantities MMBBL Barrels at standard condition
106 BBL
1 MMBBL = 158,987.3 m3
Contaminant Content ppmv Parts per million, volumetric

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 9 of 15
Status Number
EX-DE 03

mg/Nm3 10-3 grams per normal cubic meter


Gas Oil Ratio (GOR) SCF/BBL Standard Cubic Feet per Barrel At
standard conditions

Table 2.2: Non-SI measurement Units

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 10 of 15
Status Number
EX-DE 03

TURRET PRODUCED FLUID SYSTEM

PRESSURES AND TEMPERATURES

The following table lists the design and operating pressures and temperatures of the incoming produced gas
stream.

Parameter Value Reference or Comment


Design Pressure and Temperature – 400 barg at -46 to 80 ºC Values are based on
Top of Riser / Upstream Pressure 373 barg at -46 to 95 ºC Topsides MEG pump
Design Class Break injection over-pressure
capabilities (400 barg value)
at +7.5m above the hull deck;
and are associated with
Closed in Tubing Head (373
barg value) pressure at Riser
Elevation at +12m (Ref. [3],
Section 7)
Design Pressure and Temperature – 140 barg at -46 to 95 ºC (Ref. [3], Section 8)
Downstream Pressure Class Break at
the outlet of HIPPS valves installed at
the inlet of each Gas Inlet swivel
UU1900DK001A/B/S (Production and
Test/Spare)
Operating Pressure Range – Slug 80 to 120 bara (Ref. [3], Section 7)
Catcher
Operating Pressure Range – Top of 82 to 122 bara To account for pressure loss
Riser across the turret (Ref. [3],
Section 7)
Max Operating Pressure – Top of Riser 373 barg Associated with Closed In
Tubing Head. Pressure at
Riser Elevation at +12m.
(Ref. [3], Section 7)
Normal Operating Temperature – Top of 7 to 65 ºC Based on normal steady state
Riser operating case (Ref. [3],
Section 7)
Min Operating Temperature – Top of -11 ºC Based on transient case
Riser during cold start-up / riser de-
packing. (Ref. [3], Section
7)
Table 3.1.1: Pressures and Temperatures

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 11 of 15
Status Number
EX-DE 03

PRODUCTION FLOW RATES

The maximum design flow rate and the design case are (Ref. [3], Section 7):
Case Flowrate Description
LELO 605 MMSCFD Design Lean Low

Table 3.2.1: Design Flow Rates

The above total flow rates are through four to six flow lines.

Maximum design gas flowrate is 150 MMScf/d per well / flowline and the correspondent flowrate of liquids
(water and condensate) (Ref. [1] Section 8.3.3).

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 12 of 15
Status Number
EX-DE 03

FEEDSTOCK CHARACTERISTICS

The feedstock characteristics are as follows (Ref [1], Table 4.5):

Component Operability Design Lean Design Base Design Rich Operability


Lean Rich
mol %
He 0.0000 0.0000 0.0000 0.0500 0.0000
N2 0.3831 0.1615 0.3367 0.4095 0.1936
CO2 0.1517 0.0432 0.0540 0.2008 0.0484
C1 97.3810 97.3930 95.1075 92.6021 92.5024
C2 1.2420 1.4315 2.4906 3.5418 3.8141
C3 0.4223 0.4867 0.9288 1.3604 1.4650
iC4 0.0806 0.0929 0.1790 0.2617 0.2818
nC4 0.0929 0.1071 0.2106 0.3186 0.3431
2,2-dim-C3 0.0024 0.0028 0.0046 0.0060 0.0065
iC5 0.0262 0.0302 0.0563 0.0899 0.0968
nC5 0.0200 0.0230 0.0427 0.0709 0.0764
C6 0.0289 0.0333 0.0613 0.1009 0.1086
m-c-C5 0.0192 0.0222 0.0497 0.0839 0.0904
Benzene 0.0491 0.0566 0.1001 0.1648 0.1775
c-C6 0.0032 0.0037 0.0698 0.1328 0.1431
m-c-C6 0.0289 0.0333 0.0749 0.1478 0.1592
Toluene 0.0184 0.0212 0.0477 0.0829 0.0893
et-Benzene 0.0008 0.0009 0.0030 0.0060 0.0065
p-Xylene 0.0006 0.0007 0.0089 0.0180 0.0194
m-Xylene 0.0006 0.0007 0.0089 0.0180 0.0194
o-Xylene 0.0013 0.0015 0.0045 0.0090 0.0097
1,2,4-TrimethylBenzene 0.0008 0.0009 0.0011 0.0020 0.0022
C7 0.0200 0.0230 0.0489 0.0879 0.0947
C8 0.0104 0.0120 0.0320 0.0649 0.0699
C9 0.0072 0.0083 0.0291 0.0539 0.0581
C10 0.0020 0.0023 0.0246 0.0489 0.0527
C11 0.0009 0.0011 0.0124 0.0260 0.0280
C12 0.0016 0.0018 0.0074 0.0160 0.0172
C13 0.0008 0.0009 0.0029 0.0110 0.0118
C14 0.0008 0.0009 0.0015 0.0060 0.0065
C15+ 0.0024 0.0028 0.0004 0.0076 0.0082

Table 3.3.1: Feedstock Characteristics

The pseudo component properties are provided in Appendices G and H of Basis of Design (Ref [1]).

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 13 of 15
Status Number
EX-DE 03

CONTAMINANTS DATA

The following has to be considered as far as contaminants are concerned:


• H2S: there is no evidence of H2S in feedstock.
• Mercury: traces of Hg have been detected in some exploration/appraisal wells in the area, with
concentrations ranging 30 - 180 μg/Nm3; for design purposes, an average mercury content equal to
100 μg/Nm3 shall be assumed in the feed gas.
• Mercaptans: there is no evidence of mercaptans in feedstock.
• Carbonyl Sulphide: there is no evidence of carbonyl sulphide in feedstock.
• Carbon Disulphide: there is no evidence of carbon disulphide in feedstock.
• Total Sulphur: there is no evidence of sulphur compounds in feedstock.
• Oxygen: there is no evidence of oxygen in feedstock.
• Lube Oils: nil.
• Arsenic: nil.
• MEG: Mono Ethylene Glycol
• Produced Water: Saturation water and Formation Water
The above values are obtained from Basis of Design (Ref. [1], Section 5).

SAND PRODUCTION

The expected sand production is summarized in the table below.

Description Value Unit


Sand granulometry 40 µm
Sand Rate 0.1 lb/MMSCFD
Table 3.5.1: Expected Sand Production

The above provided values have to be considered as normal operation values. The sand production reported
in the table above is to be considered valid at the top of the tubing. The above values are obtained from Section
8.4 of Basis of Design. Ref. [1]

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 14 of 15
Status Number
EX-DE 03

TURRET CHEMICAL SERVICES

In addition to the produced fluid system listed above, the turret will also contain chemical services. MEG
Injection (both to subsea and Turret) and Scale Inhibitor Injection are both provided from topsides. The
following table lists the design pressures and temperatures of the chemical services being delivered from
topsides (Ref. [6] Section 9).

SERVICE Design Pressure &Temperature


MEG Injection (to Subsea) 336 barg at -5 to 80⁰C
MEG Injection (to Turret) 400 barg at -5 to 80⁰C
Scale Inhibitor Injection 345 barg at -5 to 80⁰ C (NOTE 1)
Table 4: Chemical Design Conditions

NOTE 1: PSV set point at discharge of scale inhibitor pump is 176 barg.

MEG CHARACTERISTICS AND PROPERTIES

The 90%wt MEG characteristics are as follows (Ref [4], Table 4-2):

Properties MEG 90% wt


Viscosity (15⁰C) (cP) 22
Viscosity (2⁰C) (cP) 35
Specific Gravity (15⁰ C) 1.10
Specific Gravity (2⁰ C) 1.11
Freezing Point (⁰C) ~-30
Table 4.1.1: MEG Main Properties

SCALE INHIBITOR PROPERTIES

Scale inhibitors are water soluble products and the ranges of viscosity and density values are
reported as follows (Ref [4], Table 7-1):

Sample 2⁰ C 20⁰ C
Viscosity S.C (cP) 3.0 – 7.8 1.9 – 4.4
Density (g/cm 3) 1.10 – 1.11 1.09 – 1.11
Table 4.2: Scale Inhibitor Properties

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.
Owner Logo and Business Name Company Document ID Contractor Document ID Revision Index Sheet of
Sheets
4404UUDTST240S2 71259C-0400-SP-0000-S040 Validity Rev 15 of 15
Status Number
EX-DE 03

TAGS REFERENCED IN THIS DOCUMENT

BEGINNING OF TAGS LIST (DO NOT MODIFY OR REMOVE THIS LINE)


TAGS Number TAGS Name
UU1700DK001A Gas Inlet Swivel A
UU1700DK001B Gas Inlet Swivel B
UU1700DK001S Gas Inlet Swivel Spare/Test
UU1700DK004 Utility Swivel

END OF TAGS LIST (DO NOT MODIFY OR REMOVE THIS LINE)

This document is the property of Coral FLNG SA.


It shall neither be shown to Third Parties nor used for purposes other than those for which it has been sent.