TABEL 1.1
AIR YANG TERSEDIA DI BENDUNG (m³/dt)
No Nama Bendung
Urut Bd-1 Bd-2 Bd-3 Bd-4 Bd-5 Bd-6 Bd-7
17 59 132 75 86 56 74 62

TABEL 1.2
AIR YANG DI BUTUHKAN PADA SETIAP DAERAH IRIGASI (m³/dt)
No Daerah Irigasi
Urut DI-1 DI-2 DI-3 DI-4 DI-5 DI-6 DI-7 DI-8 DI-9 DI-10
17 22 33 29 31 41 31 38 18 18 46
TABEL 1.3
KEHILANGAN AIR PADA SALURAN PRIMER Per-m3/dt AIR YANG LEWAT SALURAN
PRIMER (%)
No Nama Saluran
Urut S1 S2 S3 S4 S5 S6 S7 S8 S9 S10 S11 S12 S13
17 21 34 10 29 26 12 16 23 22 22 25 17 31

No Nama Saluran
Urut S14 S15 S16 S17 S18 S19 S20 S21 S22 S23 S24 S25 S26 S27
17 25 30 16 19 10 8 33 32 25 25 24 15 34 17

TABEL 1.4
KETERANGAN VARIABEL
,
AIR YANG TERSEDIA X
AIR YANG DI BUTUHKAN Y
KEHILANGAN AIR Z
Fungsi Sasaran :
x1 + x2 + x3 + x4 + x5 + x6 + x7 = 544
y1 + y2 + y3 + y4 + y5 + y6 + y7 + y8 + y9 + y10 = 307
z1 + z2 + z3 + z4 +z5 ,,,, + z27 = 601
x1 - (z1 + z2 + z3 ) = -6
Tabel 1.5.
Alokasi tiap saluran

Nama Saluran Alokasi(m3/dt) Nama Saluran Alokasi(m3/dt)

S1 21 S14 25

S2 34 S15 30

S3 10 S16 16

S4 29 S17 19

S5 26 S18 10

S6 12 S19 8

S7 16 S20 33

S8 23 S21 32

S9 22 S22 25

S10 22 S23 25

S11 25 S24 24

S12 17 S25 15

S13 31 S26 34

S27 17

Kehilangan air total = 601………… m3/dt