You are on page 1of 16
eS TRANE™ Chilled Water Fan Coil Unit Airflow Range 200~1400CFM Installation Operation Maintenance CSGaraGo jus Witen working onthe equipment. observeal precautions inthe iterature and on the tags stoers, and labels that are attached to the equipment. 3520-0002-02 UNT-SVX11A-EN © mew Table of Contents General Information 2 General Motor Coll/ Drain Pan Figure t: General tlustration of Unit HFCF Model Designation 3 Installation 4 Receiving and Handing Installation Considerations Mounting Duct Connections Piping Electrical Connections Figure 2 Typical Installation Figure 3: Duct Work Dimension Data and Weight 7 Figure 4: HECF without Return Plenum Figute 5: HFCF wath Bottom Return Plenum Figute 6: HFCF with Rear Retum Plenum Wiring Diagram 8 Figure 7: Model HEGF Wiring Diagram Installation Checklist 9 Start Up/Operation 10 Maintenance 1" Figute 8: Fan Board Assembly Periodic Maintenance Checkist Maintenance Procedures Maintenance Contract Training This service manual covers the instalation, ‘operation and maintenance ofthe Trane HFCF chilled water Fan Coll It should be read thoroughly before installing the fan coll unit General/ Motor /Coil /Drain Pan General + Fabricated wih a rigid galvanized steel casing + The DIDW centrifugal fans have balanced with state and dynamic test, galvanized steel, and foward curved blades. +The fan board andthe top ofolleasing were insulated with high-density non-lammable foam. + An optional retun air plenum is available to allow the connection diferent types offer, Motor + Motors are of permanent spt capactor type {or maximum effeieney and minimum noise with permanent lubrication, sealed ball bearings. + Fan motor shall be capable of providing at least 3 fan speeds| LOW-MEDIUM-HIGH) and Figure 1: General lllustration Of Unit © mwe General Information bultn with thermal eutout to prevent overloading al any speed and duly of the fans, + The motor eapactar is totally enclosed in @ metal shield, and attached to the motor. The ‘motor lead-out wires are enclosed by exible ‘metal conduit ta provide protection against damage, and factory installed junction box. coil ‘The col shallhave 2, 3 or 4 rows configuration wth seamless copper tubes mechanically bonded into blue aluminum tins and collars, + The col shall be designed with bettom accessible for ease of svtehing coll handsvater connections at jobste + Water inlet/outlet connections shall be with linch female pipe thread (GB/T'8001- 2000), Header assembly shall be one-piece brass casting which accepts sleel pipe diet 2 + Coll assembly shal be tested over 25kg/em" (360 psi, no obvious leakage under working pressure at18xglem’ (230 psi + Awater drain pan purge is located atthe bottom of the coll header. fin Pan + The drain pan shall be thermally insulated galvanzed steel, preteated with epoxy resin Coating at an inner surface + For maximum secury ftom leaks, ain pan shall be one-piece stamping wth no seam or jai. +The drain pan shall have galvanized steel male wth 34-inch connection + The drain pan shall be removaole and have @ slight fall towards the drain connection.

You might also like