D etailed application record of 216mm/203mm/127mm Motor

Motor information FTG and ROP Motor operation time

FTG in Total
Drilling Bit Size Circulation(h Reaming Total
Serial Nr. Type Site name Trips Date in Date out Interval(m)-(m) FTG(m) total ROP(m/h) Drilling(h) hrs/trip
crew (mm) ) (h) hrs(h)
(m) (h)

1 2016/2/17 2016/3/2 2252.78 2736.64 483.86 2.33 208 3.83 5 216.83


7LZ216× Chuanqing
190308 Shifu 1 311.2 1310.22 526
7.0/5-Straight 70569
2 2016/3/3 2016/3/17 2736.64 3563 826.36 2.98 277 11.17 21 309.17

7LZ216× Chuangqin
0716106 Ningxi 202 311.2 1 2016/9/20 2016/10/3 1770.35 2666.88 896.53 896.53 3.65 245.5 20 16.5 282 282
7.0/5-1.25° g50655

7LZ203× Nanchong Chuanqing


190372 241.3 1 2016/3/28 2016/4/12 3801.1 4691.58 890.48 890.48 4.07 219 25 19 263 263
7.0/5-Straight 2 70556

1 2017/6/17 2017/6/29 5051 5890 839 4.58 183 20 13.5 216.5


7LZ203× Zhongyua
2517004 Yuanba7 241.3 1327 386
7.0/5-Straight n90106
2 2017/7/6 2017/7/14 6202 6690 488 3.54 138 21 10.5 169.5

1 2016/8/23 2016/8/25 5124 5199.69 75.69 4.20 18 7.5 7.5 33

7LZ127× Gaoshi Chuanqing


190551 149.2 2 2016/8/25 2016/9/1 5199.69 5780.33 580.64 772.37 4.54 128 16 17 161 262
7.0/4-1.25° 001-X5 70585

3 2016/9/1 2016/9/6 5780.33 5896.37 116.04 3.22 36 22.5 9.5 68

1 2017/5/11 2017/5/16 5626.86 5965.08 338.22 4.83 70 14 11 95


7LZ127× Moxi 022- Chuanqing
2116108 149.2 679.14 201
7.0/4-1.25° X3 70190
2 2017/5/16 2017/5/21 5965.08 6306 340.92 4.61 74 20 12 106
D etailed application record of 216mm/203mm/127mm Motor

Motor information Drilling parameter Mud and formations Application Description

Bottom
SPP Mud weight
Serial Nr. Type WOB(T) RPM Flow rate(L/s) Mud type Viscosity(s) temperature Formation Reasons to POOH Conditions
(MPa) (g/cm3)
(°C)

Good, Run In Hole


9-10 50 39 21 WBM 2.1 47 79 T3x-T2l bit worn and balled up
7LZ216× again
190308
7.0/5-Straight Good, Run In Hole
9-10 50 39 21 WBM 2.15 50 81 T2l-T1j Third spud in completed
again

7LZ216× There is silicon, change Good, Run In Hole


0716106 5-15 40 37 19-21 WBM 1.58 52 68 T1j-P2l
7.0/5-1.25° PDC bit to tricone bit again

7LZ203× Drilling time slower, change Good, Run In Hole


190372 10 50 29 23 WBM 1.75 48 120 T2l4-T1j4
7.0/5-Straight the bit again

Meet high press water


Good, Run In Hole
12-14 50 30 25 WBM 1.81 60 135 T2l-T1j2 interval,POOH for
7LZ203× again
2517004 conventional drilling
7.0/5-Straight
Into Changxin Formation, Good, Run In Hole
8-10 40-50 30 25-26 WBM 1.86 60 145 T1j1-P2ch
POOH for tricone bit again

No signal from MWD, Good, Run In Hole


5 30 15 21 WBM 1.17 40 134 Z2dn4
POOH to check again

7LZ127× Drilling slowly, POOH,bit Good, Run In Hole


190551 5-7 30-40 15 21 WBM 1.17 34 141 Z2dn4
7.0/4-1.25° ring out again

Drilling slowly, No FTG, bit Good, Run In Hole


4-7 40 14 20-22 WBM 1.12 38 146 Z2dn4
worn out again

meet silicon, POOH to Good, Run In Hole


4-6 35 15 21 WBM 1.2 42 147 Z2dn
change the bit again
7LZ127×
2116108
7.0/4-1.25°
Good, Run In Hole
4-6 35 15 21 WBM 1.2 42 148 Z2dn Well completed
again