You are on page 1of 2

National Institutional Ranking Framework

Ministry of Human Resource Development


Government of India
Submitted Institute Data for NIRF'2019'
Institute Name: Delhi Technological University [IR-E-U-0098]

Sanctioned (Approved) Intake


Academic Year 2017-18 2016-17 2015-16 2014-15 2013-14 2012-13

UG [4 Years Program(s)] 2210 1862 1676 1633 - -

PG [2 Year Program(s)] 429 429 - - - -

Total Actual Student Strength (Program(s) Offered by Your Institution)


(All programs No. of Male No. of Female Total Students Within State Outside State Outside Economically Socially No. of students No. of students No. of students No. of students
of all years) Students Students (Including male (Including male Country Backward Challenged receiving full receiving full receiving full who are not
& female) & female) (Including male (Including male (SC+ST+OBC tuition fee tuition fee tuition fee receiving full
& female) & female) Including male reimbursement reimbursement reimbursement tuition fee
& female) from the State from Institution from the Private reimbursement
and Central Funds Bodies
Government

UG [4 Years 6244 996 7240 3998 2896 346 846 2913 450 526 50 2733
Program(s)]

PG [2 Year 458 169 627 113 506 8 86 283 13 6 4 346


Program(s)]

Placement & Higher Studies

UG [4 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students Academic Year No. of students No. of students Median salary of No. of students
students intake in the students admitted in admitted through graduating in placed placed selected for Higher
year the year Lateral entry minimum stipulated graduates(Amount in Studies
time Rs.)

2012-13 1608 1553 2013-14 9 2015-16 1456 1225 600000(Six Lakhs) 80

2013-14 1632 1478 2014-15 10 2016-17 1463 1283 620000(Six Lakhs 180
twent thousand)

2014-15 1633 1579 2015-16 10 2017-18 1477 1283 700000(Seven Lakhs) 194

PG [2 Years Program(s)]: Placement & higher studies for previous 3 years


Academic Year No. of first year No. of first year Academic Year No. of students graduating in minimum No. of students Median salary of No. of students
students intake in the students admitted in stipulated time placed placed selected for Higher
year the year graduates(Amount in Studies
Rs.)

2014-15 608 468 2015-16 380 182 925000(Nine Lakh 102


twenty five thousand)

2015-16 608 408 2016-17 281 236 1200000(Twelve 45


Lakhs)

2016-17 429 345 2017-18 270 200 1000000(Ten Lakhs) 65

Ph.D Student Details


Ph.D (Student pursuing doctoral program till 2017-18; Students admitted in the academic year 2018-19 should not be entered here.)

Total Students

Full Time 390

Part Time 357

No. of Ph.D students graduated (including Integrated Ph.D)

2017-18 2016-17 2015-16

Full Time 44 30 20

Part Time 23 22 17

Financial Resources: Utilised Amount for the Capital expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Capital Expenditure on Academic Activities and Resources (excluding expenditure on buildings)

Library 31809675 (Three Crore Eighteen Lakh Nine Thousand Six 15060673 (One Crore Fifty Lakh Sixty Thousand Six Hundred 20734090 (Two Crore Seven Lakh Thirty Four Thousand
Hundred Seventy Five) Seventy Three) Ninety)

New Equipment for Laboratories 152456133 (Fifteen Crore Twenty Four Lakh Fifty Six 60869602 (Six Crore eight Lakh sixty nine Thousand six 40656338 (Four Crores Six Lakhs Fifty Six Thousand Three
Thousand One Hundred Thirty Three) Hundred two) Hundred Thirty Eight)

Engineering Workshops 16939570 (One Crore Sixty Nine Lakhs Thirty Nine Thousand 20143723 (Two Crore One Lakh Fourty Three Thousand 13427394 (One Crore Thirty Four Lakh Twenty Seven
Five Hundred Seventy) Seven Hundred Twenty Three) Thousand Three Ninety Four)

Other expenditure on creation of Capital Assets (excluding 149934520 (Fourteen Crore Ninety Nine Lakhs Thirty Four 179302627 (Seventeen Crore Ninety Three Lakh Two 46515788 (Four Crore Sixty Five Lakh Fifteen Thousand
expenditure on Land and Building) Thousand Five Hundred Twenty) Thousand Six Hundred Twenty Seven) Seven Hundred Eighty Eight)

Financial Resources: Utilised Amount for the Operational expenditure for previous 3 years
Academic Year 2017-18 2016-17 2015-16

Utilised Amount Utilised Amount Utilised Amount

Annual Operational Expenditure

Salaries (Teaching and Non Teaching staff) 721897126 (Seventy Two Crore Eighteen Lakh Ninety Seven 498001534 (Forty Nine Crore Eighty Lakh One Thousand Five 407350541 (Forty Crore Seventy Three Lakh Fifty Thousand
Thosand One Hundred Twenty Six) Hundred Thirty Four) Five Hundred Fourty One)

Maintenance of Academic Infrastructure or consumables, 304769171 (Thirty Crores Forty Seven Lakhs Sixty Nne 278725184 (Twenty Seven Crore Eighty Seven Lakh Twenty 234437299 (Twenty Three Crores Forty Four Lakhs Thirty
other running expenditures etc.(excluding maintenance of Thousand One Hundred Seventy One) Five Thousand One Hundred Eighty Four) Seven Thousand Two Hundred Ninety Nine)
hostels and allied services)

Seminars/Conferences/Workshops 135638690 (Thirteen Crores Fifty Six Lakhs Thirty Eight 65166274 (Six Crores Fifty One Lakhs Sixty Six Thousand Two 49936941 (Four Crore ninety nine lakh thirty six thousand nine
Thousand Six Hundred Ninety) Hundred Seventy Four) forty one)

PCS Facilities: Facilities of physically challenged students


1. Do your institution buildings have Lifts/Ramps? Yes, more than 80% of the buildings

2. Do your institution have provision for walking aids, includingwheelchairs and transportation from one building to another for Yes
handicapped students?

3. Do your institution buildings have specially designed toilets for handicapped students? Yes, more than 80% of the buildings

You might also like