Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title http://www.engr/psu.edu/ae/cic/bimex
Planning Schematic Design Schematic Design Design Development Design Development Construction Documents Construction Documents
Author Schematic Develop Virtual Author Design Develop Virtual Author Construction Develop Virtual
Validate Program
Design Prototypes Development Prototypes Documents Prototypes
Design Virtual Design Virtual Design Virtual
Owner Programming Architect Architect Architect Architect Engineer Architect
Authoring Prototyping Authoring Prototyping Authoring Prototyping
Construction
Schematic Design Design Development Documents (WP)
INFO. EXCHANGE
Program Model Architectural Model Schematic Design Schematic Design Architectural Model Design Development Design Development Design Development Architectural Model Construction Construction Construction Construction Record Model
Schematic Design Documents (WP) Documents (WP) Documents (WP)
Cost Estimation 4D Model Cost Estimation 4D Model Engineering Analysis Documents (WP)
Engineering Analysis 4D Model Virtual Prototypes 3D Micro Coordination
Model Cost Estimation
Model Model
Historical Site /
Geotechnical Report GIS Data
Facilities Information
Survey Existing
Facilities
Responsible Party
Responsible Party
Compile Existing
Collect Current Site
PROCESS
Conditions
Conditions Data
Information
Responsible Party
Responsible Party
INFO. EXCHANGE
Existing Conditions
Laser Scan Model Survey Model
Information Model
Level 2: Cost Estimation Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
Cost Database
Cost Reports Analysis
Method
Evaluate
Quantities and
Cost Breakdown
Contractor
PROCESS
No No
No
Establish Cost Develop Evaluate Methods Organize Incorporate
Adjust BIM for Export BIM for Calculate Costs Review Costs/
Quantities Review Quantities for Assembly Quantities to Cost Contingencies/
Targets Takeoff Yes Analysis
Schedule
Yes Construction Data
from Quantities Results
Overheads
Yes
Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor Contractor
Start Results Results in
Model ready Compliance with
Process
Acceptable? End
for QTO/Cost Cost Target?
Analysis? Process
INFO. EXCHANGE
Productivity Lead
Information Times
Start No No
Process
Establish Information
Create New or Modify Link 3D Elements to Validate Accuracy of Review 4D Model/
Exchange
Requirements
Previous 3D Model Activities 4D Model Yes Schedule Yes
Site
Investigation
Data
No Responsible Party No
Determine Building
Select a Building Site
PROCESS
Responsible Party
INFO. EXCHANGE
Site Analysis
Model
Level 2: Programming Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
Site
Information
Owner Not
Acceptable
Create Program
Requirements Building Layout Requirements Acceptable
Owner
INFO. EXCHANGE
Program
Site Analysis Model
Existing Conditions
Model Model
Level 2: Design Authoring Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
Parametric Modeling
Content
Identify Models Identify Content for Develop Intitial Engineer Engineer Engineer
Yes Yes
Required Model Creation Architecture Model Yes
Program Model Preliminary Architectural Model Structural Model Architectural Model Structural Model Architectural Model Structural Model
Architecture Model
Compile Design
Review Feedback
Architect Architect/User
No
PROCESS
Start End
All Disciplines Facility Manager
Process Process
Design
Acceptable?
Compile Model for Perform
Constructability Constructability
REview Review
Design Model
Design Review
Information
Level 2: Energy Analysis Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
Analysis
Energy Tariff Method
Weather Data
Assign Construction
Types to Building
Elements
Contractor
No No
Analyze Energy
PROCESS
Adjust BIM for Assign Outside Export BIM for Review Energy Prepare Report for
Design Criteria and
Demand and Yes
Energy Yes Analysis
consumption
Anaysis Results Documentation
Analysis Energy Targets
Responsible Party Mechanical Engineer Mechanical Engineer Mechanical Engineer Mechanical Engineer
Mechanical Engineer
Start
Results
Process
acceptable ?
Is model ready
for simulation?
Mechanical Contractor
INFO. EXCHANGE
Energy Analysis
Design Model Model
Note: This map was developed from a review of the
bSa/OGC AECOO-1 Testbed Project
Level 2: Structural Analysis Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
No
PROCESS
Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer Structural Engineer
Start End
Process Is Site Process
Acceptable and
Available?
INFO. EXCHANGE
Structural Design
Structural Analysis Structural Design
Arch. Model Model
Model Model
(Draft)
Level 2: Lighting Analysis Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
Lighting Engineer
No
Export Model to Export Model to
Identify Lighting Generate Lighting Generate Basic Modify Model for Update Lighting
Lighting Analysis Analyze Model for
Yes Lighting Design
Criteria Layout Lighting Model Analysis Lighting Levels Model
Application Application
PROCESS
Lighting Engineer
Lighting Engineer Lighting Engineer Lighting Engineer Lighting Engineer Lighting Engineer Lighting Engineer Lighting Engineer
Start End
Process Is Building Process
Lighting
Analyze Model for
Acceptable?
Density Levels
Lighting Engineer
INFO. EXCHANGE
Other Applicable
Arch. Model Struct. Model
Models Lighting Design
Model (Draft) Lighting Analysis Lighting Design
Model Model
Level 2: Design Coordination Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
BIM Coordinator
Define Coordination
Meeting Location
BIM Coordinator
PROCESS
Define Information for Create Discipline Compile Composite Perform Collision Identify Solutions to
Discipline Models Models Model detection Yes Collisions
Start All Disciplines Start Design All Disiciplines BIM Coordinator BIM Coordinator All Disciplines
Process Coordination
Any
Process
Collisions?
Define the Areas of Develop Schedule for
Coordination Coordination No
Establish a Protocol
to Address Collisions End Process
All Disciplines
INFO. EXCHANGE
Coordination
Design Model Coordination Model
by Discipline Model
Level 2: Site Utilization Planning Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
Construction
Schedule
Equipment Libraries
Add Construction
Equipment
Contractor
Analyze Site Layout
No for Phase Transition No
Contractor
Identify Construction Determine Temporary Yes Yes Distribute Plan to
Phases Facilities Various Parties
PROCESS
Contractor
INFO. EXCHANGE
3D Controls Report
Construction Families
and Libraries
PROCESS
Coordinate Generate
Determine Scope of Identify Alternative Model Alternative Analyze Various Compare and Select
Construction Construction Plans
Work to be Analyzed Construction Methods Methods Methods Options
Sequences
Contractor End
Contractor Contractor Contractor Contractor Contractor Contractor
Process
Start Is Construction
Process Is Model Sequence
Acceptable? Acceptable?
INFO. EXCHANGE
Construction
Design Model
Site Utilization Model Model
Level 2: Record Modeling Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
No
PROCESS
Coordination 4D Model
Design Model
Model Record Model
Level 2: Maintenance Scheduling Developed with the BIM Project Execution Planning Procedure by the Penn State CIC Research Team.
Project Title
REFERENCE INFO. http://www.engr/psu.edu/ae/cic/bimex
Correct?
INFO. EXCHANGE
Assign Performance
Targets
No No
Facility Manager
PROCESS
Facility Manager
INFO. EXCHANGE
Building Building
Energy Analysis Performance Performance
Model Record Model Analysis Model Analysis Output