BIBLIOGRAPHY
REVIEWED
as Indicated In
ABS Letter dated:
AS AMENDED
27 MAR 2008
aa
ee
ons
208. (2.08 [FOE
"NokoPoer "| 5. |
Snip Name
Div fo.Ne.: 29/29
* (92) SHEETS WITH A COVER
n PROJECT NO.
SHIPYARD: SEKWANG SHIPBUILDING CO., LTD. eal
= SHIP NAR
| owner SEKWANG SHIPPING CO., LTO. ee
APP BY
DWT 13,000 TON CLASS OIL/CHEMI TANKER
We BY] SS
K.0.0K
EGY a
SEAL BALLAST WATER EXCHANGE PROCEDURE
[oR ey
W. 8. SHIN
OW-BY SE] TASS OWE.NO. REV
KT, Lee NONE | 2008. 03. 22. Aas. 681000138) oO
DESIGNER s 4 #$ A Hl
P DESIGN & ENGINEERING CO., LTD.
a saeco"This plan must be kept available for inspection on request by an Authorized aythority."
NOTE
This sequence is prepared to provide to the buyer
for the Buyer's reference.
The sequence may not comply with visibility requirement,
minimum bow and propeller immersion in some steps.
But the sequence shall comply with stability criteria and
shall be within the allowable longitudinal strength assigned
from The Class.INDEX
1. GENERAL PARTICULARS
2. EXPLANATION OF THE BALLAST WATER MANAGEMENTPLAN
1) BACKGROUND
2) USAGE OF THE PLAN
3) CREW TRAINING AND FAMILIARISATION
4) PORT STATE AND REQUIREMENTS.
3. BALLAST WATER ARRANGEMENT
1) TANK ARRANGEMENT
2) SUMMARY TABLE OF TANK CAPACITY
3) PUMP CAPACITY
4) BALLAST SYSTEM
4. SAFETY CONSIDERATION
1) LIMITATIONS
2) POTENTIAL HAZARDS AT SEQUENTIAL METHOD
5. BALLAST WATER PLANNING
1) GENERAL
2) EXCHANGE BY SEQUENTIAL METHOD
6. DUTIES OF BALLAST MANAGEMENT OFFICER
BALLAST WATER REPORTING FORM AND RECORDING LOG
8. BALLAST WATER EXCHANGE PROCEDURE
1) STANDARD LOADING FOR HALF BUNKER
2) DETAILS FOR CONSTANT WEIGHT
3) IMO & SOLAS VISIBILITY TABLE
4) AIR DRAFT TABLE
5) PROPELLER IMMERSION
6) SEQUENCE OF BALLAST EXCHANGE AT SEA
7) SUMMARY TABLE
8) DETAILS OF PROCEDURE
# Appendix: IMO RESOLUTION A.868
ee
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
PAGE
2
3
3
3
3
4
B= 7
7
8
8
9 - 10
"1
W
12
12 - 15
7
18
19
20
21
22
23 - 26
27 - 78
79 - 90