You are on page 1of 4
BIBLIOGRAPHY REVIEWED as Indicated In ABS Letter dated: AS AMENDED 27 MAR 2008 aa ee ons 208. (2.08 [FOE "NokoPoer "| 5. | Snip Name Div fo.Ne.: 29/29 * (92) SHEETS WITH A COVER n PROJECT NO. SHIPYARD: SEKWANG SHIPBUILDING CO., LTD. eal = SHIP NAR | owner SEKWANG SHIPPING CO., LTO. ee APP BY DWT 13,000 TON CLASS OIL/CHEMI TANKER We BY] SS K.0.0K EGY a SEAL BALLAST WATER EXCHANGE PROCEDURE [oR ey W. 8. SHIN OW-BY SE] TASS OWE.NO. REV KT, Lee NONE | 2008. 03. 22. Aas. 681000138) oO DESIGNER s 4 #$ A Hl P DESIGN & ENGINEERING CO., LTD. a saeco "This plan must be kept available for inspection on request by an Authorized aythority." NOTE This sequence is prepared to provide to the buyer for the Buyer's reference. The sequence may not comply with visibility requirement, minimum bow and propeller immersion in some steps. But the sequence shall comply with stability criteria and shall be within the allowable longitudinal strength assigned from The Class. INDEX 1. GENERAL PARTICULARS 2. EXPLANATION OF THE BALLAST WATER MANAGEMENTPLAN 1) BACKGROUND 2) USAGE OF THE PLAN 3) CREW TRAINING AND FAMILIARISATION 4) PORT STATE AND REQUIREMENTS. 3. BALLAST WATER ARRANGEMENT 1) TANK ARRANGEMENT 2) SUMMARY TABLE OF TANK CAPACITY 3) PUMP CAPACITY 4) BALLAST SYSTEM 4. SAFETY CONSIDERATION 1) LIMITATIONS 2) POTENTIAL HAZARDS AT SEQUENTIAL METHOD 5. BALLAST WATER PLANNING 1) GENERAL 2) EXCHANGE BY SEQUENTIAL METHOD 6. DUTIES OF BALLAST MANAGEMENT OFFICER BALLAST WATER REPORTING FORM AND RECORDING LOG 8. BALLAST WATER EXCHANGE PROCEDURE 1) STANDARD LOADING FOR HALF BUNKER 2) DETAILS FOR CONSTANT WEIGHT 3) IMO & SOLAS VISIBILITY TABLE 4) AIR DRAFT TABLE 5) PROPELLER IMMERSION 6) SEQUENCE OF BALLAST EXCHANGE AT SEA 7) SUMMARY TABLE 8) DETAILS OF PROCEDURE # Appendix: IMO RESOLUTION A.868 ee PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE PAGE 2 3 3 3 3 4 B= 7 7 8 8 9 - 10 "1 W 12 12 - 15 7 18 19 20 21 22 23 - 26 27 - 78 79 - 90

You might also like