You are on page 1of 15

BẢNG THỐNG KÊ CHI TIẾT CỐT THÉP

CÔNG TRÌNH: EURO PLAST

HẠNG MỤC: MCR

SỐ HIỆU ĐƯỜN
HÌNH DẠNG - KÍCH THƯỚC SỐ
STT TÊN CẤU KIỆN THANH G KÍNH
(mm) THANH/CK
THÉP (mm)

QUANTITY/
NAME OF
NO. LOCATION SHAPE AND SIZE Ø 1
STRUCTURE
STRUCTURE

đáy
1 100 12300 Ø8 10.5
bottom

đáy
1 100 1700 Ø8 63
bottom

Mương cáp A thành


2 100 12300 Ø8 9
Cable trench A wall

thành
3 150 1700 Ø8 63
wall

neo ISA
4 L1
anchor ISA

đáy
5 100 650 Ø8 51
bottom

đáy
6 100 9900 Ø8 5.5
bottom

Mương cáp B thành


7 150 510 Ø8 51
Cable trench B wall

thành
8 100 10000 Ø8 4
wall

neo ISA
9 L1
anchor ISA

đáy
10 100 14920 Ø8 7
bottom

đáy
11 100 1200 100 Ø8 85.5
bottom

Mương cáp C
Cable trench C
Mương cáp C thành
12 100 1110 Ø8 85.5
Cable trench C wall

thành
13 100 14920 Ø8 7
wall

neo ISA
14 L1
anchor ISA

đáy
15 100 650 Ø8 38
bottom

đáy
16 100 7400 Ø8 4.5
bottom

Mương cáp D thành


17 100 910 Ø8 38
Cable trench D wall

thành
18 100 7400 Ø8 6
wall

neo ISA
19 L1
anchor ISA

TOTAL

20 x 1800 Ø10 15

Móng
21 Foundation y 1800 Ø10 15

TOTAL

22 250 6100 Ø25 4

23 250 6100 Ø16 4

Cột
24 300 300 Ø8 41.7
50

Column

25 250 250 Ø8 41.7


50

TOTAL
26 350 115000 350 Ø16 6

27 180 350 Ø8 576

50
gối
28 Plinth beam 300 1500 Ø16 98
Top, Bottom

nhịp
29 4000 Ø16 52
Midle

TOTAL

30 outdoor 150 62260 150 Ø16 4

31 150 300 Ø8 312.3

32 indoor 150 53760 50 150 Ø16 4

Door + window
33 120 150 Ø8 269.8
50

level beam

gối
34 200 1500 Ø16 72
Top+Bottom

nhịp
35 4000 Ø16 52
Middle

TOTAL

100
36 750 Ø8 15
200
D1
37 100 2100 Ø8 6

100
38 600 Ø8 23
200
W1
39 Sun shade 100 2.2 Ø8 5

100
40 600 Ø8 11.7
200
V-1
41 100 1600 Ø8 5
TOTAL

42 230 114330 230 Ø16 4

43 230 230 Ø8 572.65

50
gối
44 Lintel beam 1500 Ø16 88
Top, Bottom

nhịp
45 4000 Ø16 44
midle

TOTAL

46 x 100 20660 Ø12 70.8

47 y 100 10473 Ø12 138.7

M- axis
48 1+2+3+4+5 300 1400 Ø12 70.8

49 Roof floor 100 10470 Ø12 11

M- axis B
50 300 1400 Ø12 138.7

51 100 20660 Ø12 11

TOTAL

52 Column-wall Link 200 1300 Ø6 700

53 Septic tank No design Lump sum= m3 (concrete) x 100 (steel content in concrete)

53 Soak pit No design Lump sum = m3 (concrete) x 100 (steel content in concrete)
ẾT CỐT THÉP

Tổng hợp khối lượng


thép (Ctr+T)

TỔNG CHIỀU DÀI TỔNG KHỐI


SỐ CẤU
SỐ 1 THANH CHIỀU DÀI LƯỢNG
KIỆN
THANH (m) (m) (kg)

NUMBER OF TOTAL LENGTH / TOTAL TOTAL


RPI REMARK
STRUCTURE BARS 1 BAR LENGTH WEIGHT

1 9 12.50 112.50 44.39

Check as per practical


1 63 1.90 119.70 47.23
installation

2 18 12.40 223.20 88.07

2 126 1.85 233.10 91.98

How do you do 13.83, for


0.00
what it is?

1 51 0.85 43.35 17.11

1 5 10.10 50.50 19.93

2 102 0.66 67.32 26.56

2 6 10.10 60.60 23.91

0.00

1 7 15.02 105.14 41.49

1 76 1.40 106.40 41.98


decuct the clear cover &
4 76 1.31 99.56 39.28
reinforcement bar of raft

decuct the clear cover &


4 6 15.12 90.72 35.80
reinforcement bar of raft

0.00

1 38 0.85 32.30 12.75

1 4 7.60 30.40 12.00

2 76 1.01 76.76 30.29

2 10 7.60 76.00 29.99

602.76

Total raft is 15. Total no.


15 225 1.70 382.50 235.83 of bar in each sideis 15.
Please check drawing first

Total raft is 15. Total no.


15 225 1.70 382.50 235.83 of bar in each sideis 15.
Please check drawing first

471.66

15 60 6.35 381.00 1,468.13

15 60 6.35 381.00 601.35

15 625 1.30 812.50 320.60

15 625 1.10 687.50 271.28

2,661.36
1 6 120.80 724.80 1,143.98

1 576 1.16 668.16 263.65


Recalculate this span wise.
I have shared a sheet of
MCR Plinth beam Span
1 98 1.80 176.40 278.42
wise. For each length the
bottom & middle length
must be different
1 52 4.00 208.00 328.29

2,014.34

1 4 66.56 266.24 420.22

1 312.3 1.00 312.30 123.23

1 4 57.26 229.04 361.50


Recalculate this span wise.
I have shared a sheet of
MCR Plinth beam Span
1 269.8 0.64 172.67 68.13
wise. For each length the
bottom & middle length
must be different
1 72 1.70 122.40 193.19

1 52 4.00 208.00 328.29

1,494.56

1 15 1.05 15.75 6.21

1 6 2.30 13.80 5.45

5 115 0.90 103.50 40.84

5 25 0.20 5.06 2.00

3 35 0.90 31.50 12.43

3 15 1.80 27.00 10.65


77.58

1 0 121.99 0.00 0.00

1 0 1.02 0.00 0.00

No need. Not installed at


1 0 1.50 0.00 0.00
site

1 0 4.00 0.00 0.00

0.00

1 70.8 21.46 1,519.37 1,348.92

1 138.733 10.67 1,480.70 1,314.59

8 566.4 1.70 962.88 854.86

8 88 10.67 938.96 833.62

2 277.467 1.70 471.69 418.77

2 22 21.46 472.12 419.15

5,189.91

1 700 1.70 1,190.00 264.12 Not done at site

ontent in concrete) 114.00 Design given

ontent in concrete) 237.00 No need as per design

TOTAL
DRAWING
QS TECHGEL REMARK
CLICK HERE

44.39 temporarily accepted


NEW:
notokok see drawing
47.23
Why do you count it as 1.7m???

88.07 temporarily accepted

91.98 ok
NEW:
please see I caculation.
13.58 How do you
In fact, do more,
maybe it, please
I point me see drawing
calculate 5% is too
reasonable
17.11

19.93

26.56

23.91

4.38

41.49

41.98
NEW:
please see my
caculation, C capble
trech have 4 layer
1.11m, 4 layer 14.92m
NEW:
please see my You calculated incorrectly, please
156.50 caculation, C capble 4 bar Ø8 wall
show me how to calculate
trech have 4 layer
1.11m, 4 layer 14.92m
You calculated incorrectly, please 4 bar Ø8 wall
167.25
show me how to calculate

20.36

12.75

12.00

30.29

29.99

4.25

894.01
NEW:
see my caculation
299.07 Please show me what wrong in formula

299.07 Please show me what wrong in formula

598.15

1,468.13

601.35

320.60

271.28

2,661.36
Have you count correctly, I see your
table lack of steel belt, moment length
-, M+ not enough

2,014.34

Please show me what wrong in


formula, You have caculated Moment 4
-, moment +, yet?

1,494.56
77.58

5,189.91

0.00

0.00

0.00

12929.905
1

3
2

You might also like