CALCULATIONS
ESTIMATED REQURIED
Cement
For Circular Columns (Bags) Sand (cu.m)
Gravel (cu.m)
Gravel (cu.m)
······················ 22.0084 cu.m
# of CHB Interior
1 sq meter
÷0.05
= 12.5 CHB
x148.8825
= 1862 CHB
Sand (cu.m)
·························· 8.3664 cu.m
Sand (cu.m)
Gravel (cu.m)
······················ 7.56675 cu.m
ITEMS TO BE MATERIALS AND ESTIMATED
CALCULATIONS
ESTIMATED QUANTITIES REQURIED
Cement
For Circular Columns Sand (cu.m)
(Bags)
Diameter Height Quantity Volume
0.35
0.3 4.05 4 x4
1.452
For Circular Column Footings
Length Width Height Volume
0.35
1 1 0.35 x4
1.4
For C-1
Thickness Width Height Volume
0.356
0.2 0.4 4.45 x16
6.72
For C-1 Footing
Circular Thickness Width Height Volume
Column with 0.42
Footing 1 1.2 0.35 x16
6.72
For C-3
Thickness Width Height Volume
0.267
0.15 0.4 4.45 x4
1.068
For C-3 Footing
Thickness Width Height Volume
0.23625
0.75 0.9 0.35 x4
0.945
Vtotal = 1.1452 + 1.14 +5.696 + 6.72 +1.008 +
1.945 = 16.9742 cu.m
USING THE FORMULAS FOR CLASS A CONCRETE
16.9742 x 9 152 bags
16.9742 x 0.5 8.4871 cu.m
16.9742 x 1
Cement
Length Width Thickness Volume Sand (cu.m)
(Bags)
6.75 3.1 0.1 2.0925
6.77 3.7 0.1 2.5049
3.25 1.85 0.1 0.60125
3.25 1.85 0.1 0.60125
4.15 3.25 0.1 1.34875
7.05 6.95 0.1 4.89975
3.45 0.65 0.1 0.22425
Concrete Slab
on Fill
4.8 3.55 0.1 1.704
Concrete Slab 3.55 2.05 0.1 0.727775
on Fill 3.95 3.85 0.1 1.52075
3.35 2.35 0.1 0.78725
6.15 0.95 0.1 0.58425
15.9 2.35 0.1 3.7365
3.65 1.85 0.1 0.67525
Vtotal = 22.0084 cu.m
USING THE FORMULA FOR CLASS A CONCRETE
22.0084 X 9 199 bags
22.0084 X 0.5 11.0042 cu.m
22.0084 X 1
Cement
Exterior Walls Volume Sand (cu.m)
(Bags)
45.9 m 45.9 84.075
Interior Walls 38.175 x0.2
0.45
Wall Footing 38.175 m = 84.075 m
= 7.56675
cu.m
USING THE FORMULA FOR CLASS A CONCRETE
7.56675 X 9 68 bags
7.56675 X 0.5 3.783375 cu.m
7.56675 X 1
# of CHB
For Exterior CHB For Interior CHB
Exterior
Perimeter Height Area 1 sq meter Perimeter Area
45.9 ÷0.08 38.175
x3.9 = 12.5 CHB x3.9
45.9 3.9 x179.01 38.175
179.01 sq m = 148.8825 sq m
= 2238 CHB
EXTERIOR Cement (Bags)
For Layering
# of
Thickness Height Length Volume Layers /
CHB
0.012 3.9
x0.15 ÷0.2
0.15 0.2 0.4 x45.9 = 19.5 /
x20 20
= 1.6524 cu.m
For Filling
Thickness Height Length Volume
0.05
x0.075
x0.2
x4
0.05 0.075 0.2
0.05 0.075 0.2
x2238 CHB
= 6.714 cu.m
Vtotal = 1.6524 + 6.714
Vtotal = 8.3664 cu.m
USING THE FORMULA FOR CLASS C MASONRY
8.3664 x 9 76 bags
8.3664 x 1
# of
Thickness Height Length Volume Layers /
CHB
0.012 3.9
x0.1 ÷0.2
0.1 0.2 0.4 x38.175
= 19.5 /
x20 20
= 0.9162 cu.m
For Filling
Thickness Height Length Volume
0.05
x0.075
x0.2
x4
0.05 0.075 0.2
x1862 CHB
= 5.586 cu.m
Vtotal = 0.8058 + 5.586
Vtotal = 6.3918 cu.m
USING THE FORMULA FOR CLASS C MASONRY
6.3918 x 9 58 bags
6.3918 x 1
For Plastering Cement (Bags)
Thickness Height Perimeter Area Volume
84.075 504.85
x3 x0.016
0.016 3 84.075
x2 = 8.0776
= 504.45 sq m cu.m
USING THE FORMULA FOR CLASS C MASONRY
8.0776 x 9 73 bags
8.0776 x 1
For CHB Cement (Bags)
Gravel (cu.m)
16.9742 cu.m
Gravel (cu.m)
22.0084 cu.m
Gravel (cu.m)
7.56675 cu.m
# of CHB
Interior
1 sq meter
÷0.05
= 12.5 CHB
x148.8825
= 1862 CHB
Sand (cu.m)
8.3664 cu.m
Sand (cu.m)
6.3918 cu.m
Sand (cu.m)
8.0776 cu.m
Sand (cu.m)
22.8358 cu.m
475 cu.m
475 cu.m
u.m