You are on page 1of 16

ITEMS TO BE MATERIALS AND ESTIMATED QUANTIT

CALCULATIONS
ESTIMATED REQURIED

Cement
For Circular Columns (Bags) Sand (cu.m)

Diameter Height Quantity Volume


0.35
0.3 4.05 4 x4
1.452
For Circular Column Footings
Length Width Height Volume
0.35
1 1 0.35 x4
1.4
For C-1
Thickness Width Height Volume
0.356
0.2 0.4 4.45 x16
6.72
For C-1 Footing
Circular
Column with Thickness Width Height Volume
Footing 0.42
1 1.2 0.35 x16
6.72
For C-3
Thickness Width Height Volume
0.267
0.15 0.4 4.45 x4
1.068
For C-3 Footing
Thickness Width Height Volume
0.23625
0.75 0.9 0.35 x4
0.945
Vtotal = 1.1452 + 1.14 +5.696 + 6.72 +1.008 + 1.945 =
16.9742
USING THE FORMULAS FOR CLASS A CONCRETE
16.9742 x 9 ··························································· 152 bags
16.9742 x 0.5 ·················································································· 8.4871 cu.m
16.9742 x 1 ················································································································ 16.9742 c
Cement
Length Width Thickness Volume Sand (cu.m)
(Bags)
6.75 3.1 0.1 2.0925
6.77 3.7 0.1 2.5049
3.25 1.85 0.1 0.60125
3.25 1.85 0.1 0.60125
4.15 3.25 0.1 1.34875
7.05 6.95 0.1 4.89975
3.45 0.65 0.1 0.22425
4.8 3.55 0.1 1.704
Concrete Slab 3.55 2.05 0.1 0.727775
on Fill 3.95 3.85 0.1 1.52075
3.35 2.35 0.1 0.78725
6.15 0.95 0.1 0.58425
15.9 2.35 0.1 3.7365
3.65 1.85 0.1 0.67525
Vtotal = 22.0084
USING THE FORMULA FOR CLASS A CONCRETE

22.0084 X 9 ··························································· 199 bags


22.0084 X 0.5 ············································································· 11.0042 cu.m
22.0084 X 1 ············································································································· 22.0084 c
# of CHB
For Exterior CHB For Interior CHB
Exterior
Perimeter Height Area 1 sq meter Perimeter Area
45.9 ÷0.08 38.175
x3.9 = 12.5 CHB x3.9
45.9 3.9 38.175
x179.01
= 179.01 sq m = 148.8825 sq m
= 2238 CHB
EXTERIOR Cement (Bags)
For Layering
# of Layers /
Thickness Height Length Volume CHB
0.012 3.9
x0.15 ÷0.2
0.15 0.2 0.4 x45.9
x20 = 19.5 / 20
= 1.6524 cu.m
For Filling

Thickness Height Length Volume


0.05
x0.075
x0.2
x4
0.05 0.075 0.2
x2238 CHB
= 6.714 cu.m
Vtotal = 1.6524 + 6.714
Vtotal = 8.3664 cu.m
USING THE FORMULA FOR CLASS C MASONRY
8.3664 x 9 ································································································ 76 bags
8.3664 x 1 ······················································································································ 8.3664
INTERIOR Cement (Bags)
For Layering
CHB # of Layers /
Thickness Height Length Volume CHB
0.012 3.9
x0.1 ÷0.2
0.1 0.2 0.4 x38.175
x20 = 19.5 / 20
= 0.9162 cu.m
For Filling
Thickness Height Length Volume
0.05
x0.075
x0.2
x4
0.05 0.075 0.2
x1862 CHB
= 5.586 cu.m
Vtotal = 0.8058 + 5.586
Vtotal = 6.3918 cu.m
USING THE FORMULA FOR CLASS C MASONRY
6.3918 x 9 ································································································ 58 bags
6.3918 x 1 ······················································································································ 6.3918
For Plastering Cement (Bags)
Thickness Height Perimeter
Area Volume
84.075 504.85
x3 x0.016
0.016 3 84.075
x2 = 8.0776
= 504.45 sq m cu.m
USING THE FORMULA FOR CLASS C MASONRY
8.0776 x 9 ································································································ 73 bags
8.0776 x 1 ······················································································································ 8.0776
For CHB Cement (Bags)
Total No of Bags = 76 + 58 + 73 ·································································· 207 bags
Total No of Sand = 8.3664 + 6.3918 + 8.0776 ······························································· 22.8358 cu.m
Cement
Exterior Walls Volume Sand (cu.m)
(Bags)
45.9 m 45.9 84.075
Interior Walls 38.175 x0.2
38.175 m 0.45
Wall Footing = 84.075 m = 7.56675
cu.m
Wall Footing

USING THE FORMULA FOR CLASS A CONCRETE


7.56675 X 9 ··························································· 68 bags
7.56675 X 0.5 ············································································ 3.783375 cu.m
7.56675 X 1 ············································································································· 7.56675 c
ESTIMATED QUANTITIES
REQURIED

Gravel (cu.m)

······················· 16.9742 cu.m

Gravel (cu.m)
······················ 22.0084 cu.m

# of CHB Interior

1 sq meter
÷0.05
= 12.5 CHB
x148.8825
= 1862 CHB
Sand (cu.m)
·························· 8.3664 cu.m
Sand (cu.m)

·························· 6.3918 cu.m


Sand (cu.m)

·························· 8.0776 cu.m


Sand (cu.m)

·················· 22.8358 cu.m

Gravel (cu.m)
······················ 7.56675 cu.m
ITEMS TO BE MATERIALS AND ESTIMATED
CALCULATIONS
ESTIMATED QUANTITIES REQURIED

Cement
For Circular Columns Sand (cu.m)
(Bags)
Diameter Height Quantity Volume
0.35
0.3 4.05 4 x4
1.452
For Circular Column Footings
Length Width Height Volume
0.35
1 1 0.35 x4
1.4
For C-1
Thickness Width Height Volume
0.356
0.2 0.4 4.45 x16
6.72
For C-1 Footing
Circular Thickness Width Height Volume
Column with 0.42
Footing 1 1.2 0.35 x16
6.72
For C-3
Thickness Width Height Volume
0.267
0.15 0.4 4.45 x4
1.068
For C-3 Footing
Thickness Width Height Volume
0.23625
0.75 0.9 0.35 x4
0.945
Vtotal = 1.1452 + 1.14 +5.696 + 6.72 +1.008 +
1.945 = 16.9742 cu.m
USING THE FORMULAS FOR CLASS A CONCRETE
16.9742 x 9 152 bags
16.9742 x 0.5 8.4871 cu.m
16.9742 x 1
Cement
Length Width Thickness Volume Sand (cu.m)
(Bags)
6.75 3.1 0.1 2.0925
6.77 3.7 0.1 2.5049
3.25 1.85 0.1 0.60125
3.25 1.85 0.1 0.60125
4.15 3.25 0.1 1.34875
7.05 6.95 0.1 4.89975
3.45 0.65 0.1 0.22425
Concrete Slab
on Fill
4.8 3.55 0.1 1.704
Concrete Slab 3.55 2.05 0.1 0.727775
on Fill 3.95 3.85 0.1 1.52075
3.35 2.35 0.1 0.78725
6.15 0.95 0.1 0.58425
15.9 2.35 0.1 3.7365
3.65 1.85 0.1 0.67525
Vtotal = 22.0084 cu.m
USING THE FORMULA FOR CLASS A CONCRETE
22.0084 X 9 199 bags
22.0084 X 0.5 11.0042 cu.m
22.0084 X 1
Cement
Exterior Walls Volume Sand (cu.m)
(Bags)
45.9 m 45.9 84.075
Interior Walls 38.175 x0.2

0.45
Wall Footing 38.175 m = 84.075 m
= 7.56675
cu.m
USING THE FORMULA FOR CLASS A CONCRETE
7.56675 X 9 68 bags
7.56675 X 0.5 3.783375 cu.m
7.56675 X 1
# of CHB
For Exterior CHB For Interior CHB
Exterior
Perimeter Height Area 1 sq meter Perimeter Area
45.9 ÷0.08 38.175
x3.9 = 12.5 CHB x3.9
45.9 3.9 x179.01 38.175
179.01 sq m = 148.8825 sq m
= 2238 CHB
EXTERIOR Cement (Bags)

For Layering

# of
Thickness Height Length Volume Layers /
CHB
0.012 3.9
x0.15 ÷0.2
0.15 0.2 0.4 x45.9 = 19.5 /
x20 20
= 1.6524 cu.m
For Filling
Thickness Height Length Volume
0.05
x0.075
x0.2
x4
0.05 0.075 0.2
0.05 0.075 0.2
x2238 CHB
= 6.714 cu.m
Vtotal = 1.6524 + 6.714
Vtotal = 8.3664 cu.m
USING THE FORMULA FOR CLASS C MASONRY
8.3664 x 9 76 bags
8.3664 x 1

INTERIOR Cement (Bags)

CHB For Layering

# of
Thickness Height Length Volume Layers /
CHB
0.012 3.9
x0.1 ÷0.2
0.1 0.2 0.4 x38.175
= 19.5 /
x20 20
= 0.9162 cu.m
For Filling
Thickness Height Length Volume
0.05
x0.075
x0.2
x4
0.05 0.075 0.2
x1862 CHB
= 5.586 cu.m
Vtotal = 0.8058 + 5.586
Vtotal = 6.3918 cu.m
USING THE FORMULA FOR CLASS C MASONRY
6.3918 x 9 58 bags
6.3918 x 1
For Plastering Cement (Bags)
Thickness Height Perimeter Area Volume
84.075 504.85
x3 x0.016
0.016 3 84.075
x2 = 8.0776
= 504.45 sq m cu.m
USING THE FORMULA FOR CLASS C MASONRY
8.0776 x 9 73 bags
8.0776 x 1
For CHB Cement (Bags)

Total No of Bags = 76 + 58 + 73 207 bags


Total No of Sand = 8.3664 + 6.3918 + 8.0776

Total No of Bags 152 + 199 + 68 + 207 = 626 bags

Total No of 8.4871 + 11.0042 + 3.783375 + 22.8358 = 46.110475 cu.m


Volume Sand
Total No of 8.4871 + 11.0042 + 3.783375 + 22.8358 = 46.110475 cu.m
Volume Sand
Total No of 16.9742 + 22.0084 + 7.56675 = 46.54935 cu.m
Volume Gravel
S AND ESTIMATED
ITIES REQURIED

Gravel (cu.m)

16.9742 cu.m

Gravel (cu.m)
22.0084 cu.m
Gravel (cu.m)

7.56675 cu.m
# of CHB
Interior
1 sq meter
÷0.05
= 12.5 CHB
x148.8825
= 1862 CHB
Sand (cu.m)
8.3664 cu.m

Sand (cu.m)

6.3918 cu.m
Sand (cu.m)

8.0776 cu.m
Sand (cu.m)

22.8358 cu.m

475 cu.m
475 cu.m

u.m

You might also like